Tender For Water Supply Arrangement And Appurtinent Work Under Magh Mela 2026-27 (Package 1 & 2, 3, 4, 5 And 6 Quantity Of Work Attached In Tender Doucment)
Tender Value
66.43 Lakhs
Estimated cost
Bid Submission
28 Sep 2026
13 days left
EMD
1.33 Lakhs
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Prayagraj → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Water Supply Arrangement And Appurtinent Work Under Magh Mela 2026-27 (Package 1 & 2, 3, 4, 5 And 6 Quantity Of Work Attached In Tender Doucment)
BOQ
| Sl. No. | Item Description |
| 1 | WATER SUPPLY ARRANGEMENT AND APPURTINENT WORK UNDER MAGH MELA 2026-27 (Package 1 & 2, 3, 4, 5 and 6 Quantity of work attached in tender doucment) |
| 2 | Taking delivery from Jal Nigam Store at Pragaraj, carting upto the site of work, excavation of trenaches laying and jointing of the following sizes of C.I. Tyton 'LA' class/ D.I. pipes including their maintenance during the Magh Mela period, dismantling, removing them from site and returning to Jal Nigam store at Pragaraj and reinstatement of ground after mela is over. Minimum excavation upto required depth during laying of pipe line cover on laid pipe should be not less than 0.25 m from ground level at site natural condition . |
| 3 | 250 mm. dia pipes |
| 4 | 200 mm dia pipes |
| 5 | 150 mm dia pipes |
| 6 | 125 mm dia pipes |
| 7 | 100 mm dia pipes |
| 8 | 80 mm dia pipes |
| 9 | Same as above SR. No.-1.01 but for G.I. Pipe |
| 10 | 100 mm dia pipes |
| 11 | 80 mm dia pipes |
| 12 | 50 mm dia pipes |
| 13 | 25 mm dia pipes |
| 14 | 20 mm dia pipes |
| 15 | 15 mm dia pipes |
| 16 | Same as above SR. No.-1.01 but for CI/GI/DF |
| 17 | 200 mm dia pipes |
| 18 | 150 mm dia pipes |
| 19 | Supply of all materials (excluding R.C.C. platforms) erect, maintain during the mela period, dismantling the following including the reinstatement of ground after mela is over. (The works also include boring of main taking connections etc. complete with all necessary fittings) The materials after dismantling shall belong to the contractor. |
| 20 | Same as above SR. No.-1.18 Without R.C.C Plateform |
| 21 | Same as above SR. No.-1.18 Single tap stand post with R.C.C. platforms (0.60x0.60m) |
| 22 | Same as above SR. No.-1.18 Stand post 75x75cm with drain |
| 23 | Same as above SR. No.-1.18 Stand post with circuler R.C.C. platform 1.00 M dia and drain |
| 24 | 4 Tap PVC stand post |
| 25 | Taking delivery of C.I. P/E or D/F sluice valves from Jal Nigam store at Pragaraj mtaintenance during the mela period, dismantling after mela is over. |
| 26 | Same as above SR. No.-1.24 but for 80mm / fire hydrant (C.I. / S.S. / Brass) |
| 27 | Ist class brick work in 1:6 cement and local mortar on rental basis for construction of support pillars etc. |
| 28 | Construction of ballie pile bridge for crossing of pipe on accumulated river water spring Nala etc. |
| 29 | Inter connection of tube wells and dismantling after mela is over Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 01, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 28, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysSep 29, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender