Tender For Repair/ Replacement Of Unsv Spares Of Cooling Towers, Ahus, Pumps, Replacement Of Semi Hybrid Hepa Filters And Other Connected Items At Bhdc Under Ge (East) Delhi Cantt-10
Tender Overview
Project Description
Tender for Repair/ Replacement Of Unsv Spares Of Cooling Towers, Ahus, Pumps, Replacement Of Semi Hybrid Hepa Filters And Other Connected Items At Bhdc Under Ge (East) Delhi Cantt-10
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-Sep-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 29-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Taking out the filter from AHU of size 1000 CFM to 16000 CFM or any capacity and cleanning of coil with suitable chemical and jet of water pressure with pump and remove all the scale and foreign material deposited in side the coil followed with air pressure to sweep up all the particles and ensure thorough flow of air over the cooling coil, refixing of AHU filter after cleaning complete all as specified and directed. |
| 2 | M&L for repairing/ servicing AHU Fan Motor of 5 HP/5.5 HP capacity, opening the motor, cleaning the shaft, bush and greasing and replacement of minor parts like seal, gasket, tighten the screws, greasing the moveable parts complete all as specified and directed. |
| 3 | Description all as per item No. 2 above here in before but 7.5 HP Capacity |
| 4 | Description all as per item No. 2 above here in before but 10 HP Capacity |
| 5 | Rewinding the motor with new super enameled copper winding of size & discription to match with existing including insulating materials, varnishing, drying, replacement of both driven end & non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed of size upto 5.5 HP. |
| 6 | Description all as per item No. 5 above here in before but 7.5 HP Capacity |
| 7 | Description all as per item No. 5 above here in before but 10 HP Capacity |
| 8 | Supply and laying in replacement including taking out MS pipe for condenser water or cooling tower line of MS 'C' class 40 mm dia confirming to IS-1239 and IS- 3589 both revised till date as required and as specified and complete with bends, reducers tees, supports vibration, pipe supports, structures shall be painted with 2 coats of synthetic enamel paint over a coat of red oxide primer and complete all as specified & directed. |
| 9 | Description all as per item No. 8 above here in before but 50 mm bore. |
| 10 | Description all as per item No. 8 above here in before but 65 mm bore. |
| 11 | Description all as per item No. 8 above here in before but 80 mm bore. |
| 12 | Description all as per item No. 8 above here in before but 100 mm bore. |
| 13 | Description all as per item No. 8 above here in before but 125 mm bore. |
| 14 | Description all as per item No. 8 above here in before but 150 mm bore. |
| 15 | M&L for taking out Cooling Tower Motor of 3.0 HP capacity, opening the motor, cutting & removing old and burnt winding wire, rewinding the motor with new super enameled copper winding of size & discription to match with existing including insulating materials, varnishing, drying, replacement of both driven end & non driven end bearings and base plate, reassembling, refixing in same position & connecting including testing and commissioning complete all as specified & directed:- |
| 16 | Description all as per item No. 15 above here in before but 5 HP Capacity. |
| 17 | Description all as per item No. 15 above here in before but 7.5 HP Capacity. |
| 18 | S&F heating element capacity 3 KW, ISI marked and making electric connections and taking down old unserviceable heating elements, complete all as directed. |
| 19 | S&F heating element capacity 1.5 KW, ISI marked and making electric connections and taking down old unserviceable heating elements, complete all as directed. |
| 20 | S&F in replacement Absolute HEPA filter of size 610x300x300mm having rated flow 1000 CFM, static pressure drop less than 25 mm of WG and efficiency more than 99.97 down to 0.3 micron, complete all as directed. Make - Thermadyne/Spectrum/Puromatic/Athlete |
| 21 | Supply & charge the refrigerent R - 407 Gas complete all as specified and directed. (Make:- Mafron/ Freon/ Floron) |
| 22 | Supply & charge the refrigerent R - 410 Gas complete all as specified and directed. (Make:- Mafron/ Freon/ Floron) |
| 23 | M&L for insulation of 40mm bore MS pipe with PUF slab 30 mm thick with applying bitumainous compound and AIuminium cladding with 26 guage Aluminium sheet etc complete including taking down existing PUF insulation all as specified and directed. |
| 24 | Description all as per item No 23 here-in-before but of pipe 50 mm bore. |
| 25 | Description all as per item No 23 here-in-before but of pipe 65 mm bore. |
| 26 | Description all as per item No 23 here-in-before but of pipe 80 mm bore. |
| 27 | Description all as per item No 23 here-in-before but of pipe 100 mm bore. |
| 28 | Description all as per item No 23 here-in-before but of pipe 125 mm bore. |
| 29 | M & L for Painting of complete water cooled central AC plant / DX type AC plant of capacity 2x15 TR, including compressor, GI pipe lines, valve, pump sets, cooling tower, AHU pipe lines and chiller pipes etc complete all as specified and directed. |
| 30 | Description all as per item No 29 here-in-before but capacity 3x30 TR. |
| 31 | Description all as per item No 29 here-in-before but capacity 3x40 TR. |
| 32 | Description all as per item No 29 here-in-before but capacity 3x70 TR. |
| 33 | S&F in replacement of Butterfly Valve made out of Cast Iron, dia 150mm complete with all accessories with thermal insulation |
| 34 | Description all as per item No 33 here-in-before but of pipe 125 mm bore. |
| 35 | Description all as per item No 33 here-in-before but of pipe 100 mm bore. |
| 36 | Description all as per item No 33 here-in-before but of pipe 80 mm bore. |
| 37 | Description all as per item No 33 here-in-before but of pipe 65 mm bore. |
| 38 | Description all as per item No 33 here-in-before but of pipe 50 mm bore. |
| 39 | Description all as per item No 33 here-in-before but of pipe 40 mm bore. |
| 40 | S&F in replacement of Y-Strainers made out of Cast Iron, dia 100 mm complete with all accessories |
| 41 | Description all as per item No 40 here-in-before but of pipe 80 mm bore. |
| 42 | Description all as per item No 40 here-in-before but of pipe 65 mm bore. |
| 43 | Description all as per item No 40 here-in-before but of pipe 50 mm bore. |
| 44 | Description all as per item No 40 here-in-before but of pipe 40 mm bore. |
| 45 | Description all as per item No 40 here-in-before but of pipe 32 mm bore. |
| 46 | Description all as per item No 40 here-in-before but of pipe 25 mm bore. |
| 47 | S&F in replacement of pot stainer made out of cast iron, dia 150mm complete all as specified and directed. |
| 48 | S&F in replacement of pot stainer made out of cast iron, dia 125mm complete all as specified and directed. |
| 49 | S&F replacement of 3 way modulating valves dia 80 mm for AHU complete with linkage modulating actuatator with all accessories complete in all respect as specified |
| 50 | Description all as per item No 49 here-in-before but of pipe 65 mm bore. |
| 51 | Description all as per item No 49 here-in-before but of pipe 50 mm bore. |
| 52 | Description all as per item No 49 here-in-before but of pipe 40 mm bore. |
| 53 | Description all as per item No 49 here-in-before but of pipe 32 mm bore. |
| 54 | Description all as per item No 49 here-in-before but of pipe 25 mm bore. |
| 55 | S&F Air vent valves made out brass. 25mm dia Complete in all as specified and directed. |
| 56 | M&L for complete servicing of cooling tower of 180 TR AC plant installed at Base hospital including cleaning, descaling of PVC fills applying the suitable chemical, removing all the deposited dust, foreign material, cleaning of filter and Checking electric connection of CT fan motor, sprinkler and PVC arms coating of FRP compound for filling of its tray joint and remove its leakage with testing, commissioning etc. complete all as specified and directed. Note:- The major parts to be replaced shall be measured and paid separately as supply only under respective item of this BoQ. |
| 57 | M&L for complete servicing of cooling tower of 120 TR AC plant installed at Base hospital including cleaning, descaling of PVC fills applying the suitable chemical, removing all the deposited dust, foreign material, cleaning of filter and Checking electric connection of CT fan motor, sprinkler and PVC arms coating of FRP compound for filling of its tray joint and remove its leakage with testing, commissioning etc. complete all as specified and directed. Note:- The major parts to be replaced shall be measured and paid separately as supply only under respective item of this BoQ. |
| 58 | M&L for complete servicing of cooling tower of 70 TR AC plant installed at Base hospital including cleaning, descaling of PVC fills applying the suitable chemical, removing all the deposited dust, foreign material, cleaning of filter and Checking electric connection of CT fan motor, sprinkler and PVC arms coating of FRP compound for filling of its tray joint and remove its leakage with testing, commissioning etc. complete all as specified and directed. Note:- The major parts to be replaced shall be measured and paid separately as supply only under respective item of this BoQ. |
| 59 | M&L for complete servicing of cooling tower of 40 TR AC plant installed at Base hospital including cleaning, descaling of PVC fills applying the suitable chemical, removing all the deposited dust, foreign material, cleaning of filter and Checking electric connection of CT fan motor, sprinkler and PVC arms coating of FRP compound for filling of its tray joint and remove its leakage with testing, commissioning etc. complete all as specified and directed. Note:- The major parts to be replaced shall be measured and paid separately as supply only under respective item of this BoQ. |
| 60 | Supply only PVC fills 600 x 300 x 150 mm double folded complete all as specified and directed. |
| 61 | Supply only Fan assembly 1500 mm or 1800 mm, including fan blades complete all as specified and directed. |
| 62 | Supply only Sprinkler system for cooling tower of capacity 180 TR complete all as specified and directed. |
| 63 | Supply only Sprinkler system for cooling tower of capacity 70 TR complete all as specified and directed. |
| 64 | Supply only Sprinkler system for cooling tower of capacity 40 TR complete all as specified and directed. |
| 65 | Supply only Tie Rod & Turn Buckle (04 Nos) complete all as specified and directed. |
| 66 | Supply only FRP Eliminator (04 Nos.) complete all as specified and directed. |
| 67 | Supply only PVC Eliminator complete all as specified and directed. |
| 68 | Supply only FRP compound for basin repair of cooling tower complete all as specified and directed. |
| 69 | Supply only of expansion tank of capacity 500 Ltr with Nitrile rubber insulation of thickness 25mm with aluminium foil complete all as specified and directed. |
| 70 | Central Air Cleaner for AHU Design, supply, installation, and commissioning in replacement of SEMI-HYBRID HEPA class (polarization based) central air purification system using Filterless Magnetic Air Purification Process of different capacities inside AHU to improve the air quality by removing microbial, pollution inside the air combined with a high kill rate on airborne infectious diseases using Ultraviolet Germicidal Irradiation. The system shall be designed for providing protection from airborne infection and maintaining Indoor Air Quality in AHU unit with the following features and technical specifications. The air purification system must be IS 17570:2021 : ISO16890:2016 certified in accordance to ASHRAE 52.2 2017 with valid test data by ASHRAE validated lab having in USA only. The system shall meet EUROVENT ePM 1.0 80% requirement and ASHRAE guideline for UV-C application for airborne infection inactivation. It should be a monobloc-structured unit specifically designed for integration in the Return Air path of units of all sizes, to centrally capture and kill germs. It shall be in grids of sizes 610x370x150mm (1000 CFM), and 610x680x150 mm (2000 CFM) to cover the full capacity (CFM) of the units. The central air cleaner unit should have no consumable parts and the minimum life of central air cleaner unit should be more than 10 years. The central air cleaner shall be capable of removing particulates as small as 0.01 microns including particulate matter PM 2.5 & PM 1.0, allergens, pollen, bacteria, pathogens and various VOC. The system shall be designed in accordance with Chapter 62 Ultraviolet Air and Surface Treatment, 2019 ASHRAE Handbook. It must be a monobolic-structured unit specifically designed for integration in return air path of air delivery systems to provide a single indoor air quality (IAQ) solution meeting global safety and performance standards set forth by ISHRAE, GRIHA, IGBC, CDC , ASHRAE & CPCB Notification No B-29016/20/90/PCI-L Manufacturer must comply with DIPP guidelines for public procurement policy notification No REGD No. DL-33004/99 dated 21 July2006 & Micro and Small Enterprises (MSEs) Order, 2012 inline with make in India initiative. For ease of supply and spares the OEM must have manufacturing facilities in India/Delhi NCR and support MAKE In India initiative. |
| 71 | The OEM must strictly follow DIPP guidelines, Green Pro for more than 50 % Indian components and OEM registered under MSME will be given preference. Supplier must have experience of more than six years 'executing projects with the same technology products and have successful installation in CPWD /PWD hospitals/governments project. List of project need to be submitted for approval.The below global certificate/ report is a must to ensure the performance, safety and reliability of the Air Purification being proposed • The central air cleaner must be designed to trap and kill microbes with high efficiency duly tested on E. coli (ATCC 15597), H1N1, as per ASTM E2149 with no less than 99% killing in less than 15 minutes.• The central air cleaner must be tested as per FDA GLP Regulations (40 CFR Part 160) for corona virus inactivation capability of over 99% in presence of FDA inspector in global labs.• The unit shall be UL2998 (that does not produces ozone, ozone generation shall be less than 50 ppb from an International Lab) & Intertek ETL, UL 867, CSA C22 No. 187, and CE certified for safety and quality and with EMC (Electromagnetic compatibility), LVD (Low Voltage directive) and RoHS compliant for complete modules Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender