Tender For Construction Of Flood Protection Work On Left Side U/S Lelhar Bridge At Kakapora From Rd 35500 To 35600 M. Amount= Rs.15.00 Lacs
Tender Value
15 Lakhs
Estimated cost
Bid Submission
21 Sep 2026
17 days left
EMD
30000
Bank guarantee accepted
Document Fee
750
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pulwama → Jammu and Kashmir
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Flood Protection Work On Left Side U/S Lelhar Bridge At Kakapora From Rd 35500 To 35600 M. Amount= Rs.15.00 Lacs
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : |
| 2 | Extra for . In or under waterand / or liquid mud, including pumping ou water as required . |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : in all kinds of soil. 1st lift |
| 4 | 2nd lift |
| 5 | Close timbering in trenches including strutting, shoring & packing cavaties depth exceeding 3m but not exceeding 4,5m. |
| 6 | Laying of stone/stone soling |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)cumcum7788.407104.3 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete |
| 11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Mild steel and medium tensile steel bars |
| 12 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level andcuring complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 13 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone |
| 14 | Extra for random rubble masonry with hard stone in:square or rectangular pillars |
| 15 | Supply of Stone boulders (quarry) nominal size 225 mm |
| 16 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m |
| 17 | Pointing on stone masonary (1:3)mix flush / rolled pointing. |
| 18 | PVC pipes 3\\" in dia for wheepholes . |
| 19 | Provision for Rapidite |
| 20 | Carriage of materials from source to road site of work by mechanical transport including loading, unloading and stacking. Stone / soling from Bahu avg. 14 km |
| 21 | Stone agg. 40mm nominal size from kakapora avg. 02 km. |
| 22 | Stone agg. 20mm nominal size from kakapora avg. 02 km. |
| 23 | sand from Kakapora avg. 02 km |
| 24 | cement from Kakapora avg. 02 Km |
| 25 | Steel from Kakapora avg. 02 Km |
| 26 | Extra for levelling and neatly dressing of disposal soil completely as directed by Engineer-in-charge |
| 27 | Carriage of materials by manual means for a lead of 80 mtrs (subject to actual)including loading, unloading and stacking stones/ soling |
| 28 | Stone agg. 40mm nominal size |
| 29 | Stone agg. 20mm nominal size |
| 30 | cement |
| 31 | steel Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 31, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 21, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysSep 22, 2026
Bid Opening Date
Technical bids will be opened and evaluated.