Bids Are invited for Custom Bid For Services - ---- - Safe Carriage Of Following Material From Electricty Store Center Hts To Pit Site Of Work Through The Kacha And Pakka Road Including Loading And Unloading At The Respective Ends Including The Cost
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - ---- - Safe Carriage Of Following Material From Electricty Store Center Hts To Pit Site Of Work Through The Kacha And Pakka Road Including Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Etc. Which Required For Proper Completion Of Work.(Distance 00-50 Kms.) , Pcc Pole 8.5/9/11 Mtr. Long , Stp Pole 9/11/13 Mtr. Long , Teeoff Channel With N&B , Earthing Set Complete , V Type X Arm , 11 Kv Pin Insulator With Pin , 11 Kv Disc Insulator With Fitting , F Bracket , Ms Angle , Acsr Weasel Conductor , Top Channel , Dropper Channel , Stay Set Complete , 25/63/100 Kva 11/0.4 Kv T/F , Errection Of Following Poles With Grouting Including Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit & Complete H.T./L.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Pcc Pole 8.5/9/11 Mtr. Long , Stp Pole 9/11/13 Mtr. Long , Fixing/ Errection Of Following Item, Cost Of Labor, Material And T&P Which Required For Completion Of Work , Teeoff Channel With N&B , 11 Kv Pin Insulator With Pin , 11 Kv Disc Insulator With Fitting , Ms Angle , V Type X Arm , Top Channel , Dropper Channel , F Bracket , Installation Of 25/63/100 Kva T/F On Newly Constructed Double Pole In Proper Alignment Direction & Making Ht/Lt Connection. , Errection And Grouting Of Stays As Per Respo Norms And As Per Direction Of Supervising Engineer. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod As Per Respo Norms And As Per Direction Of Supervising Engineer. , Laying, Sagging And Stringing And Jumpering/ Binding Etc. In 33 Kv/11 Kv / Lt Lines As Per Respo Manual And As Per Direction Of Supervising Engineer. , Acsr Weasel Conductor , Providing & Fixing Of Nut,Bolt & Washer , Providing & Fixing Of Different Type Of Cl
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) |
| 2 | Pcc Pole 8.5/9/11 Mtr. Long | Pcc Pole 8.5/9/11 Mtr. Long |
| 3 | STP Pole 9/11/13 Mtr. Long | STP Pole 9/11/13 Mtr. Long |
| 4 | Teeoff Channel with N&B | Teeoff Channel with N&B |
| 5 | Earthing set complete | Earthing set complete |
| 6 | V type X arm | V type X arm |
| 7 | 11 KV Pin Insulator with Pin | 11 KV Pin Insulator with Pin |
| 8 | 11 KV Disc Insulator with fitting | 11 KV Disc Insulator with fitting |
| 9 | F Bracket | F Bracket |
| 10 | MS Angle | MS Angle |
| 11 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 12 | Top Channel | Top Channel |
| 13 | Dropper Channel | Dropper Channel |
| 14 | Stay set Complete | Stay set Complete |
| 15 | 25/63/100 KVA 11/0.4 KV T/F | 25/63/100 KVA 11/0.4 KV T/F |
| 16 | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 17 | Pcc Pole 8.5/9/11 Mtr. Long | Pcc Pole 8.5/9/11 Mtr. Long |
| 18 | STP Pole 9/11/13 Mtr. Long | STP Pole 9/11/13 Mtr. Long |
| 19 | Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work | Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work |
| 20 | Teeoff Channel with N&B | Teeoff Channel with N&B |
| 21 | 11 KV Pin Insulator with Pin | 11 KV Pin Insulator with Pin |
| 22 | 11 KV Disc Insulator with fitting | 11 KV Disc Insulator with fitting |
| 23 | MS Angle | MS Angle |
| 24 | V type X arm | V type X arm |
| 25 | Top Channel | Top Channel |
| 26 | Dropper Channel | Dropper Channel |
| 27 | F Bracket | F Bracket |
| 28 | Installation of 25/63/100 kva T/F On newly Constructed Double Pole in proper alignment direction & making HT/LT connection. | Installation of 25/63/100 kva T/F On newly Constructed Double Pole in proper alignment direction & making HT/LT connection. |
| 29 | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 30 | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. |
| 31 | Laying, sagging and stringing and jumpering/ binding etc. in 33 KV/11 KV / LT lines as per RESPO manual and as per direction of supervising engineer. | Laying, sagging and stringing and jumpering/ binding etc. in 33 KV/11 KV / LT lines as per RESPO manual and as per direction of supervising engineer. |
| 32 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 33 | Providing & Fixing of Nut,Bolt & washer | Providing & Fixing of Nut,Bolt & washer |
| 34 | Providing & Fixing of Different Type of Clamp | Providing & Fixing of Different Type of Clamp |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender