Tender For Repair/Maintenance Of Mt Vehicles And T&P Of Ge (Af) Stn Thoise
Tender Value
4 Lakhs
Estimated cost
Bid Submission
14 Sep 2026
9 days left
EMD
8000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
LADAKH → Jammu and Kashmir
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/Maintenance Of Mt Vehicles And T&P Of Ge (Af) Stn Thoise
BOQ
| Sl. No. | Item Description |
| 1 | REPAIRS TO EICHER 10.70/10.75M&L for taking out carefully Diesel Engine from Eicher10.70/10.75, Opening/ dismantlling Head Assembly Complete of Diesel Engine, Piston, Piston Rings, Connecting Rod and Crank Shaft, etc. complete in all respect and carry out the Machine Work, Re-metaling, Grinding, Polishing of Crank Shaft and Lapping, Housing, Reaming and Making Valve Seat of Head and Other Component of Head Assembly Standard size of worn out Spares as required, replacement of Parts and Re-assembling after fitting of Parts, fitting of Diesel Engine after found Serviceable into the Vehicle, applying Two Coats of Aluminium Paint after making Surface Smooth and applying One Coat of Primer on Exhaust Pipe from Exhaust Valves to Silencer Assembly and Testing after Completion (after Running of Engine minimum 8-10 Hours on Static Run) On Full Load, complete all as specified and as directed. NOTE: Spares/Parts required for overhauling of Diesel Engine shall be measured and paid under relevant item here-in-after. |
| 2 | M&L for denting Work where needed on Complete Vehicle EICHER 10.70/ 10.75, Removing Old Paint by scraping, cleaning with Caustic Soda and making surfaces Even and Smooth by applying Putty, Rubbing, Cutting, Polishing all as required and applying One Coat of Primer and Two Coat of NC Paint by Spray Painting in separate Booth (Workshop) as per existing Paint/Shape by preventing Non Painting Parts (as ordered by Engineer-in-Charge) including application Two Coats of Anti Corrosive Black Paint to Flooring Both Sides of Wheel Mud Guard Under Courage, Writing Vehicle BA No., Firm Name, complete all as specified and as directed. NOTE : Colour of Paint & Writing Vehicle BA No. & Firm Name will be decided by Engineer-in-Charge. |
| 3 | M&L for Opening/Dismantling carefully Fuel Injection Pump from EICHER 10.70/10.75, complete Servicing/Repair/Replacement of following unserviceable Parts (as approved/ as per existing Size and Make), Grinding of Nozzles Complete and Re-fixing the Same, Testing on completion, complete all as specified and as directed :- (a) Bearing - 04 No.(b) Bearing Bush - 04 No.(c) Delivery Valve - 04 No.(d) Fuel Pipe Line - 04 No.(e) Niddle Valve - 04 No.(e) Plunger - 04 No. |
| 4 | M&L for Opening Dynamo from EICHER 10.70/10.75 for Servicing /Overhauling (at Contractor’s Workshop) including replacement of Carbon Bushes, Armature Winding and Bush Bearing, re-assembling and fixing to Vehicle including Testing, complete all as specified and as directed. MAKE : MICO/LUCAS or as approved by GE. |
| 5 | M&L for Opening Self Starter from EICHER 10.70/10.75 for Servicing/ Overhauling at Contractor’s Workshop including replacement of worn out Pinoin, Varnish of Coil, Replacement of Solenoid Switch, Carbon Bush, Armature Winding and re-assembling with Engine, complete all as specified and as directed. MAKE : MICO/LUCAS or equivalent as recommended by Manufacturers. |
| 6 | M&L for Taking out/down the existing Clutch System from EICHER 10.70/ 10.75, and replacement of Clutch Plate (MAKE : CEEKAY/REPCO), Pressure Plate (MAKE : CEEKAY/REPCO), Withdral Bearing (MAKE : SKF/ CEEKAY) or as approved by GE/ Engineer-in-Charge and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed. |
| 7 | M&L to taking out Front/Rear Wheels Complete from EICHER 10.70/10.75, Cleaning, Polishing & Overhauling of Brake System (2x4 No. of Wheels) by providing New Wheel Cylinder Kit, Brake Shoe, Brake Liner, Brake Pipes Complete (MAKE : TVS/ RANE/ BOSCH), Cleaning & Polishing of Wheel Drum, Greasing of Front and Rear Wheels Bearing, Taking out Tyres, Tubes of Each Wheels, Cleaning of Each Wheels/ Disc/ Rims and applying Two Coats of Anti-corrosive Paint after obtaining a Smooth Surface, Re-assembling of Wheels and Re-fixing All Parts including Wheel Alignment from Authorised Workshop, Testing on Completion, complete all as as specified and as directed. |
| 8 | M&L for repairing/Servicing carefully of Water Pump alongwith Waterbody Assembly with necessary Accessories for EICHER 10.70/10.75, repalcing Unserviceable Parts with existing shape/size, re-fitting the same, Testing on completion, complete all as specified and as directed. |
| 9 | M&L for brake Master Cylinder Kit suitable for EICHER 10.70/10.75 including Taking out existing Leakage Brake Master Cylinder Kit from the Vehicle, complete all as specified and as directed. MAKE : TVS or as approved |
| 10 | M&L for cabin Desh Board suitable for EICHER 10.70/10.75 complete as per existing Size and Shape including dismantaling existing broken/ scrached Desh Board carefully with all Accessories and Fittings, complete all as specified and as directed. MAKE : EICHER or as approved |
| 11 | M&L for Cabin Roof Clothes/Rexin (as approved) suitable for EICHER 10.70/10.75including removing existing Cabin Roof Clothes/Rexin, complete all as specified and as directed. NOTE : Clothes/Rexin sample and colour will be decided by Engineer-in-Charge. |
| 12 | M&L for front Wind Glass (as approved/ as per existing Size/Shape) suitable for EICHER 10.75, Checking/Servicing of Locking System and Minor Repairing of Opening/Closing of Window Glass including Taking down/out unserviceable Front Wind Glass by Inner Board/Cover, complete all as specified and as directed. MAKE : EICHER or as approved. |
| 13 | M&L for Plastic Grill Bonnet Central Assembly (as approved) suitable for EICHER 10.70/10.75 as per existing Shape and Size Opening including dismantaling existing broken Plastic Grill Bonnet Central Assembly, complete all as specified and as directed. MAKE : EICHER or as approved |
| 14 | M&L for Seat Covers (as approved/ as per existing) suitable for EICHER 10.70/10.75 and fixing properly including Taking down wornout upholstry from Vehicle, complete all as specified and as directed. NOTE: Seat Covers will be as approved by GE/Engineer-in-Charge. |
| 15 | M&L for foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes and other Auxiliaries suitable for EICHER 10.75 including removing existing Seat Covers, Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes, etc., complete all as specified and as directed.MAKE : KK/LUCAS/TATA GENUINE |
| 16 | M&L for Side Indicator Assembly (Front) with Cover and Lamps of appropriate Wattage (as approved/ as per existing Size/Shape) suitable for EICHER 10.70/10.75 including Taking down/out unserviceable Front Side Indicator Assembly, complete all as specified and as directed. MAKE : KK/LUCAS or as approved |
| 17 | M&L for Tail Light Assembly Complete (Brake Light/ Side Indicator Light/ Parking Light) with Lamps of appropriate Wattage and suitable for EICHER 10.70/10.75, testing on Completion including Taking down/out Unserviceable Tail Light Assembly, complete all as specified and as directed. MAKE : KK/LUCAS/TATA GENUINE |
| 18 | M&L for Window Inner Cover as per existing Shape and Size including Checking/ Servicing of Locking System and Minor Repair of Opening /Closing of Window Glass for EICHER 10.70/10.75 including removing/taking out Unserviceable Window Inner Cover, complete all as specified and as directed. MAKE : EICHER or as approved by GE. |
| 19 | M&L for Window Door Handle with Key & Lock - 1 No., without Key - 1 No. suitable for EICHER 10.70/10.75 as per existing Size and Shape including dismantaling existing broken Window Door Handle carefully, complete all as specified and as directed.MAKE : EICHER or as approved by GE. |
| 20 | M&L for Window Rear View Mirror (as approved/ as per existing) suitable for EICHER 10.70/10.75 including Taking down existing Window Rear View Mirror, complete all as as specified and as directed. MAKE : NEO GOLD or as approved approved by GE |
| 21 | S&F Air Filter (as approved/ as per existing) suitable for EICHER 10.70/10.75 including taking down existing Air Filter, complete all as as specified and as directed. MAKE : MICO/ELOFIC/ LEYPART |
| 22 | S&F Diesel Filter (as approved/ as per existing) suitable for EICHER 10.70/10.75 including Taking down existing Diesel Filter, complete all as as specified and as directed. MAKE : ELOFIC/ LEYPART/ MICO |
| 23 | S&F Oil Filter (as approved/ as per existing) suitable for EICHER 10.70/10.75 including taking down existing Oil Filter, complete all as as specified and as directed. MAKE : MICO/ELOFIC/LEYPART |
| 24 | M&L for Fuel Gauge and Meter including Wiring System, suitable for EICHER10.70/10.75, Testing on Completion including removing existing Fuel Gauge and Meter, complete all as specified and as directed.MAKE : EICHER or as approved by GE. |
| 25 | M&L for temperature Gauge and Meter including Wiring System, suitable for EICHER 10.70/10.75, Testing on Completion including removing existing Fuel Gauge and Meter, complete all as specified and as directed.MAKE : EICHER or as approved by GE. |
| 26 | REPAIRS TO TATA Xenon 3.0L-:M&L for taking out carefully Diesel Engine from TATA Xenon 3.0 , Opening/ dismantlling Head Assembly Complete of Diesel Engine, Piston, Piston Rings, Connecting Rod and Crank Shaft, etc. complete in all respect and carry out the Machine Work, Re-metaling, Grinding, Polishing of Crank Shaft and Lapping, Housing, Reaming and Making Valve Seat of Head and Other Component of Head Assembly Standard size of worn out Spares as required, Replacement of Parts and Re-assembling after fitting of Parts, fitting of Diesel Engine after found Serviceable into the Vehicle, applying Two Coats of Aluminium Paint after making surface Smooth and applying One Coat of Primer on Exhaust Pipe from Exhaust Valves to Silencer Assembly and Testing after Completion (after Running of Engine minimum 8-10 Hours on Static Run) On Full Load, complete all as specified and as directed. NOTE-: Spares Parts required for overhauling of Diesel Engine shall be measured and paid under relevant item here-in-after. |
| 27 | M&L for Denting Work where needed on Complete Vehicle TATA Xenon 3.0L, Removing Old Paint by scraping, cleaning with Caustic Soda and making surfaces Even and Smooth by applying Putty, Rubbing, Cutting, Polishing all as required and applying One Coat of Primer and Two Coats of NC Paint by Spray Painting in separate Booth (Workshop) as per existing Paint/Shape by preventing Non Painting Parts (as ordered by Engineer-in-Charge) including application Two Coats of Anti Corrosive Black Paint to Flooring both sides of Wheel Mud Guard under Courage, Writing Vehicle BA No., Firm Name, complete all as specified and as directed. NOTE-: Colour of Paint & Writing Vehicle BA No. & Firm Name will be decided by Engineer-in-Charge. |
| 28 | M&L for Opening Alternator from TATA Xenon 3.0L for Servicing /Overhauling (at Contractor’s Workshop) including Replacement of Carbon Bushes, Armature Winding and Bush Bearing, Re-assembling and fixing to Vehicle including Testing, complete all as specified and as directed. MAKE : Siemens AG/ Cummins or as approved |
| 29 | M&L for Opening Self Starter from TATA Xenon 3.0L for Servicing/Overhauling at Contractor’s Workshop including replacement of worn out Pinoin, Varnish of Coil, Replacement of Solenoid Switch, Carbon Bush, Armature Winding and re-assembling with Engine, complete all as specified and as directed. MAKE : MICO/LUCAS or equivalent as recommended by Manufacturers. |
| 30 | M&L for Opening/Dismantaling Suspension System (Complete) from the TATA Xenon 3.0L and replacement of Front Suspension Complete, Anti-Roll Bars, Rear Suspension complete, Shock Absorbers with necessary Nut, Bolts, Washers, etc. complete all as specified and as directed. MAKE : TATA Xenon or as approved by GE. |
| 31 | M&L for Opening Complete Window with Inner Flap, Locking, Opening (Outer and Inner) Arrangements, Servicing and Minor Repairs for Opening and Closing of Window Mirror including replacement of Locking Button, Window Opening Handle from Inner and Outer Side, Window Mirror up and down Handle for TATA Xenon and re-fixing of all Parts, Testing on completion, complete all as specified and as directed. NOTE : New Parts will be as per existing One and as approved by GE/ Engineer-in-Charge. |
| 32 | M&L for Repairing/Servicing carefully of Water Pump alongwith Waterbody Assembly with necessary Accessories for TATA Xenon 3.0L, repalcing Unserviceable Parts with existing shape/ size, re-fitting the same, Testing on completion, complete all as specified and as directed. |
| 33 | M&L for taking down the existing Clutch System from TATA Xenon 3.0L, Replacement of Clutch Plate (MAKE : REPCO/ TATA GENUINE), Pressure Plate (MAKE : REPCO/ TATA GENUINE), Withdral Bearing (MAKE : SKF/ REPCO/ TATA GENUINE) or as approved by GE/ Engineer-in-Charge and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed. |
| 34 | M&L for taking down Complete Gear Box from TATA Xenon 3.0L by Opening, Dismantall-ing, Taking Out All Parts, Cleaning of Serviceable Parts with Petrol, Replacement of Unserviceable Parts, Re-assembling Gear Box and Re-fixing to Vehicle, Testing on completion for the smooth functioning of shifting of all Forward and Reverse Gear, complete all as specified and as directed. MAKE : MARUTI GENUINE/ZF or as approved |
| 35 | M&L for Taking down Complete Steering System from TATA Xenon 3.0Lby Opening/ Dismantalling, Taking Out All Parts, Cleaning of Serviceable Parts and Replace-ment of Unserviceable Parts (Steering Column, Tie Rod, Spindles, Universal Joints, Pitman Arm, Steering Gear Box Assembly, Drag Link Assembly) and Re-assembling and fixing to Vehicle and Testing on completion, complete all as as specified and as directed. MAKE : MARUTI GENUINE/RANE/ZF or as approved |
| 36 | M&L for Taking out Front/Rear Wheels Complete from TATA Xenon 3.0L, Cleaning, Polishing & Overhauling of Brake System (of 2x2 No. of Wheels) by providing new Wheel Cylinder Kit, Brake Shoe, Brake Liner, Brake Pipes Complete (MAKE : TVS/BOSCH/TATA GENUINE), Cleaning & Polishing of Wheel Drum, Greasing of Front and Rear Wheels Bearing, Taking out Tyres, Tubes of Each Wheels, Cleaning of Each Wheels/Disc/Rims and applying Two Coats of Anti-corrosive Paint after obtaining a Smooth Surface, Re-assembling of Wheels and Re-fixing all Parts including Wheel Alignment from Authorised Workshop, Testing on Completion, complete all as as specified and as directed. |
| 37 | M&L for Brake Master Cylinder Kit suitable for TATA Xenon 3.0L including Taking out existing Leakage Brake Master Cylinder Kit from the Vehicle, complete all as specified and as directed. MAKE : TVS/ TATA GENUINE or as approved |
| 38 | M&L for Seat Covers (as approved/ as per existing) suitable for TATA Xenon 3.0Land fixing properly including Taking down wornout upholstry from Vehicle, complete all as specified and as directed. NOTE : Seat Covers will be as approved by GE/Engineer-in-Charge. |
| 39 | M&L for Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes and other Auxiliaries suitable for TATA Xenon 3.0Lincluding removing existing Seat Covers, Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes, etc., complete all as specified and as directed.MAKE : KK/LUCAS/TATA GENUINE |
| 40 | M&Lfor Side Indicator Assembly (Front) with Cover and Lamps of appropriate Wattage (as approved/ as per existing Size/Shape) suitable for TATA Xenon 3.0Lincluding Taking down/out unserviceable Front Side Indicator Assembly, complete all as specified and as directed. MAKE : LUCAS or as approved. |
| 41 | M&L for Tail Light Assembly Complete (Brake Light/ Side Indicator Light/ Parking Light) with Lamps of appropriate Wattage and suitable for TATA Xenon, Testing on Completion including Taking down/out Unserviceable Tail Light Assembly, complete all as specified and as directed. MAKE : KK/LUCAS/TATA GENUINE |
| 42 | M&L for Window Rear View Mirror (as approved/ as per existing) suitable for TATA Xenon 3.0L including Taking down existing Window Rear View Mirror, complete all as as specified and as directed. MAKE : NEO GOLD/TATA GENUINE or as approved. |
| 43 | S&F Air Filter (as approved/ as per existing) suitable for TATA Xenon 3.0L including Taking down existing Air Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO/ TATA |
| 44 | S&F Diesel Filter (as approved/ as per existing) suitable for TATA Xenon 3.0L including Taking down existing Diesel Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO/ TATA |
| 45 | S&F Oil Filter (as approved/ as per existing) suitable for TATA Xenon 3.0L including Taking down existing Oil Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO/ TATA |
| 46 | S&F Alternator (as approved/ as per existing), 12 Volt suitable for TATA xenon 3.0L including removing existing Alternator, complete all as specified and as directed.MAKE : LUCAS/ MICO or as approved |
| 47 | M&L Temperature Gauge and Meter including Wiring System, suitable for TATA Xenon 3.0L, Testing on Completion including removing existing Fuel Gauge and Meter, complete all as specified and as directed.MAKE : TATA or as approved. |
| 48 | Supply only Bearing Set for Connecting Rod (as approved/ as per existing) suitable for Diesel Engine of TATA Xenon 3.0L, complete all as specified. MAKE : GOETZE/IPL/TATA GENUINE/USHA or as approved. |
| 49 | Supply only Connecting Rod Bush Set (as approved/ as per existing) suitable for Diesel Engine of TATA Xenon 3.0L, complete all as specified. MAKE : GOETZE/IPL/TATA GENUINE/USHA or as approved. |
| 50 | Supply only Oil Pump Gear (as approved/ as per existing) suitable for Diesel Engine of TATA Xenon 3.0L, complete all as specified. MAKE : GOETZE/IPL/TATA GENUINE/USHA or as approved. |
| 51 | Supply only Piston Ring Standard (as approved/ as per existing) suitable for Diesel Engine of TATA Xenon 3.0L , complete all as specified. MAKE : GOETZE/IPL/TATA GENUINE/USHA or as approved. |
| 52 | Supply only V Belt Cogged (as approved/ as per existing) suitable for Diesel Engine of TATA Xenon, complete all as specified. MAKE : GOETZE/IPL/TATA GENUINE/USHA or as approved. |
| 53 | REPAIRS TO MARUTI GYPSY KING HARD TOP 4X-:M&L for taking out carefully Diesel Engine from Maruti Gypsy dismantlling Head Assembly Complete of Diesel Engine, Piston, Piston Rings, Connecting Rod and Crank Shaft, etc. complete in all respect and carry out the Machine Work, Re-metaling, Grinding, Polishing of Crank Shaft and Lapping, Housing, Reaming and Making Valve Seat of Head and Other Component of Head Assembly Standard size of worn out Spares as required, Replacement of Parts and Re-assembling after fitting of Parts, fitting of Diesel Engine after found Serviceable into the Vehicle, applying Two Coats of Aluminium Paint after making Surface Smooth and applying One Coat of Primer on Exhaust Pipe from Exhaust Valves to Silencer Assembly and Testing after Completion (after Running of Engine minimum 8-10 Hours on Static Run) On Full Load, complete all as specified and as directed. NOTE: Spares Parts required for overhauling of Diesel Engine shall be measured and paid under relevant item here-in-after. |
| 54 | M&L for Denting Work where needed on Complete Vehicle Maruti Gypsy, Removing Old Paint by scraping, cleaning with Caustic Soda and making surfaces Even and Smooth by applying Putty, Rubbing, Cutting, Polishing all as required and applying One Coat of Primer and Two Coats of NC Paint by Spray Painting in separate Booth (Workshop) as per existing Paint/Shape by preventing Non Painting Parts (as ordered by Engineer-in-Charge) including application Two Coats of Anti Corrosive Black Paint to Flooring both sides of Wheel Mud Guard under Courage, Writing Vehicle BA No., Firm Name, complete all as specified and as directed. NOTE : Colour of Paint & Writing Vehicle BA No. & Firm Name will be decided by Engineer-in-Charge. |
| 55 | M&L for Opening Self Starter from Maruti Gypsy for Servicing/Overhauling at Contractor’s Workshop including replacement of worn out Pinoin, Varnish of Coil, Replacement of Solenoid Switch, Carbon Bush, Armature Winding and re-assembling with Engine, complete all as specified and as directed. MAKE : MICO/LUCAS or equivalent as recommended by Manufacturers. |
| 56 | M&L for Opening Complete Window with Inner Flap, Locking, Opening (Outer and Inner) Arrangements, Servicing and Minor Repairs for Opening and Closing of Window Mirror including replacement of Locking Button, Window Opening Handle from Inner and Outer Side, Window Mirror up and down Handle for Maruti Gypsy and re-fixing of all Parts, Testing on completion, complete all as specified and as directed. NOTE : New Parts shall be as per existing One and as approved by GE/ Engineer-in-Charge. |
| 57 | M&L for repairing/Servicing carefully of Water Pump alongwith Waterbody Assembly with necessary Accessories for Maruti Gypsy, repalcing Unserviceable Parts with existing shape/ size, re-fitting the same, Testing on completion, complete all as specified and as directed. |
| 58 | M&L for Taking down the existing Clutch System from Maruti Gypsy, Replacement of Clutch Plate (MAKE : REPCO/ MARUTI GENUINE), Pressure Plate (MAKE : REPCO/ MARUTI GENUINE), Withdral Bearing (MAKE : SKF/ REPCO/ MARUTI GENUINE) or as approved by GE/ Engineer-in-Charge and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed. |
| 59 | M&L for Taking down Complete Gear Box from Maruti Gypsy by Opening, Dismantaling, Taking Out All Parts, Cleaning of Serviceable Parts with Petrol, Replacement of Unserviceable Parts, Re-assembling Gear Box and Re-fixing to Vehicle, Testing on completion for the smooth functioning of shifting of all Forward and Reverse Gear, complete all as specified and as directed. MAKE : MARUTI GENUINE/ZF or as approved |
| 60 | M&L for Taking down Complete Steering System from Maruti Gypsy by Opening/ Dismantalling, Taking Out All Parts, Cleaning of Serviceable Parts and Replace-ment of Unserviceable Parts (Steering Column, Tie Rod, Spindles, Universal Joints, Pitman Arm, Steering Gear Box Assembly, Drag Link Assembly) and Re-assembling and fixing to Vehicle and Testing on completion, complete all as as specified and as directed. MAKE : MARUTI GENUINE/RANE/ZF or as approved |
| 61 | M&L for Taking out Front/Rear Wheels Complete from Maruti Gypsy, Cleaning, Polishing & Overhauling of Brake System (of 4X4 No. of Wheels) by providing new Wheel Cylinder Kit, Brake Shoe, Brake Liner, Brake Pipes Complete (MAKE : TVS/BOSCH/MARUTI GENUINE), Cleaning & Polishing of Wheel Drum, Greasing of Front and Rear Wheels Bearing, Taking out Tyres, Tubes of Each Wheels, Cleaning of Each Wheels/Disc/Rims and applying Two Coats of Anti-corrosive Paint after obtaining a Smooth Surface, Re-assembling of Wheels and Re-fixing all Parts including Wheel Alignment from Authorised Workshop, Testing on Completion, complete all as as specified and as directed. |
| 62 | M&L for Brake Master Cylinder Kit suitable for Maruti Gypsy including Taking out existing Leakage Brake Master Cylinder Kit from the Vehicle, complete all as specified and as directed. MAKE : TVS/ MARUTI GENUINE or as approved |
| 63 | M&L for Seat Covers (as approved/ as per existing) suitable for Maruti Gypsy and fixing properly including Taking down wornout upholstry from Vehicle, complete all as specified and as directed. NOTE : Seat Covers will be as approved by GE/Engineer-in-Charge. |
| 64 | M&L for Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes and other Auxiliaries suitable for Maruti Gypsy including removing existing Seat Covers, Foot Mats, Steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes, etc., complete all as specified and as directed.MAKE : KK/LUCAS/MARUTI GENUINE |
| 65 | M&L for Side Indicator Assembly (Front) with Cover and Lamps of appropriate Wattage (as approved/ as per existing Size/Shape) suitable for Maruti Gypsy including Taking down/out unserviceable Front Side Indicator Assembly, complete all as specified and as directed. MAKE : LUCAS or as approved |
| 66 | M&L for Window Rear View Mirror (as approved/ as per existing) suitable for Maruti Gypsy including Taking down existing Window Rear View Mirror, complete all as as specified and as directed. MAKE : NEO GOLD/MARUTI GENUINE or as approved. |
| 67 | S&F Air Filter (as approved/ as per existing) suitable for Maruti Gypsy including Taking down existing Air Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO |
| 68 | S&F Fuel Filter (as approved/ as per existing) suitable for Maruti Gypsy including Taking down existing Fuel Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO |
| 69 | S&F Oil Filter (as approved/ as per existing) suitable for Maruti Gypsy including Taking down existing Oil Filter, complete all as as specified and as directed. MAKE : LEYPART/ MICO/ TATA |
| 70 | M&L Fuel Gauge and Meter including Wiring System, suitable for Maruti Gypsy, Testing on Completion including removing existing Fuel Gauge and Meter, complete all as specified and as directed.MAKE :MARUTI or as approved |
| 71 | Supply only V Belt Cogged (as approved/ as per existing) suitable for Diesel Engine of Maruti Gypsy, complete all as specified. MAKE : GOETZE/IPL/MARUTI GENUINE/USHA or as approved Please Enable Macros to View BoQ information |
| 72 | Supply only V Belt Cogged (as approved/ as per existing) suitable for Diesel Engine of Maruti Gypsy, complete all as specified. MAKE : GOETZE/IPL/MARUTI GENUINE/USHA or as approved Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 31, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 14, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysSep 16, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender