Tender For De-Stringing Of Existing Panther Conductor And Stringing And Supply Of Htls Conductor Along With All Accessories Of (I) 132Kv Sonabil-Depota Transmission Line, (Ii) 132Kv Sonabil-Ghoramari Transmission Line (Iii)132Kv Ghoramari- Depotatran
Tender Overview
Project Description
Tender for De-Stringing Of Existing Panther Conductor And Stringing And Supply Of Htls Conductor Along With All Accessories Of (I) 132Kv Sonabil-Depota Transmission Line, (Ii) 132Kv Sonabil-Ghoramari Transmission Line (Iii)132Kv Ghoramari- Depotatransmission Line
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 11-Sep-2026 | CORRIGENDUM-I | Technical Bid | 23-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Supply of HTLS Conductor as per specification requirements. |
| 2 | Single Suspension Hard ware fittings (Quantity included mandatory spares: 3 Nos) |
| 3 | Single Tension Hard ware fittings(Quantity included mandatory spares: 4 Nos) |
| 4 | Mid Span Joints(Quantity included mandatory spares: 1 No) |
| 5 | Repair Sleeves(Quantity included mandatory spares: 1 No) |
| 6 | Vibration Dampers(Quantity included mandatory spares: 6 Nos) |
| 7 | Double Tension hardware fittings(Quantity included mandatory spares: 1 No) |
| 8 | 90KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 9 | 70KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 10 | Double Suspension Hard ware fittings(Quantity included mandatory spares: 1 No) |
| 11 | Dead end assembly(Quantity included mandatory spares: 4 Nos) |
| 12 | Jumper Socket(Quantity included mandatory spares: 4 Nos) |
| 13 | Supply of HTLS Conductor as per specification requirements. |
| 14 | Single Suspension Hard ware fittings (Quantity included mandatory spares: 3 Nos) |
| 15 | Single Tension Hard ware fittings(Quantity included mandatory spares: 4 Nos) |
| 16 | Mid Span Joints(Quantity included mandatory spares: 1 No) |
| 17 | Repair Sleeves(Quantity included mandatory spares: 1 No) |
| 18 | Vibration Dampers(Quantity included mandatory spares: 6 Nos) |
| 19 | Double Tension hardware fittings(Quantity included mandatory spares: 1 No) |
| 20 | 90KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 21 | 70KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 22 | Double Suspension Hard ware fittings(Quantity included mandatory spares: 1 No) |
| 23 | Dead end assembly(Quantity included mandatory spares: 4 Nos) |
| 24 | Jumper Socket(Quantity included mandatory spares: 4 Nos) |
| 25 | Preliminary survey including measurement of vertical clearance at maximum sag point, identification and replacement or repairirng of damaged stubs, tower members and earthing and collection of all required documents required for obtaining statutory permission from railways, highway Authorities and other Government bodies as per requirement. |
| 26 | De-stringing of ACSR panther conductor of existing 132kV Sonabil-Depota line, re-rolling on empty drum, removing of hardware fittings, insulators and accessories, loading and unloading, transportation it to AEGCL store. Length Per Ckt = 17.73KMTotal Ckt Km or total de-stringing required is = 17.73 Km X 3 Ph = 53.19 Km |
| 27 | Paving, stringing,tensioning, Clamping, jointing etc of HTLS conductor with non metallic core using tension pullar machine as per specification requirements in all the phases including hoisting of insulators, fittings of all necessary hardware & accessories i.e fittings, armour rods, vibration damper, supervision of installation and stringing etc. Length Per Ckt = 17.73KMTotal Ckt Km or total stringing required is = 17.73 Km X 3 Ph = 53.19 Km |
| 28 | Dismantling of existing clamps, connectors and accessories from gantry to the Bus bar at the terminal Bay of respective Sub-Station (both ends) and reconnection with HTLS compatible connectors, conductor and clamps both supply and erection complete. |
| 29 | Supply of HTLS Conductor as per specification requirements. |
| 30 | Single Suspension Hard ware fittings (Quantity included mandatory spares: 2 Nos) |
| 31 | Single Tension Hard ware fittings(Quantity included mandatory spares: 4 Nos) |
| 32 | Mid Span Joints(Quantity included mandatory spares: 1 No) |
| 33 | Repair Sleeves(Quantity included mandatory spares: 1 No) |
| 34 | Vibration Dampers(Quantity included mandatory spares: 4 Nos) |
| 35 | Double Tension hardware fittings(Quantity included mandatory spares: 1 No) |
| 36 | 90KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 37 | 70KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 38 | Double Suspension Hard ware fittings(Quantity included mandatory spares: 1 No) |
| 39 | Dead end assembly(Quantity included mandatory spares: 4 Nos) |
| 40 | Jumper Socket(Quantity included mandatory spares: 4 Nos) |
| 41 | Supply of HTLS Conductor as per specification requirements. |
| 42 | Single Suspension Hard ware fittings (Quantity included mandatory spares: 2 Nos) |
| 43 | Single Tension Hard ware fittings(Quantity included mandatory spares: 4 Nos) |
| 44 | Mid Span Joints(Quantity included mandatory spares: 1 No) |
| 45 | Repair Sleeves(Quantity included mandatory spares: 1 No) |
| 46 | Vibration Dampers(Quantity included mandatory spares: 4 Nos) |
| 47 | Double Tension hardware fittings(Quantity included mandatory spares: 1 No) |
| 48 | 90KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 49 | 70KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 50 | Double Suspension Hard ware fittings(Quantity included mandatory spares: 1 No) |
| 51 | Dead end assembly(Quantity included mandatory spares: 4 Nos) |
| 52 | Jumper Socket(Quantity included mandatory spares: 4 Nos) |
| 53 | Preliminary survey including measurement of vertical clearance at maximum sag point, identification and replacement or repairirng of damaged stubs, tower members and earthing and collection of all required documents required for obtaining statutory permission from railways, highway Authorities and other Government bodies as per requirement. |
| 54 | De-stringing of ACSR panther conductor of existing 132kV Sonabil-Ghoramari line, re-rolling on empty drum, removing of hardware fittings, insulators and accessories, loading and unloading, transportation it to AEGCL store. Length Per Ckt= 8.96 KMTotal Ckt Km or total de-stringing required is = 8.96 Km X 3 Ph = 26.88 Km |
| 55 | Paving, stringing,tensioning, Clamping, jointing etc of HTLS conductor with non metallic core using tension pullar machine as per specification requirements in all the phases including hoisting of insulators, fittings of all necessary hardware & accessories i.e fittings, armour rods, vibration damper, supervision of installation and stringing etc. Length Per Ckt= 8.96 KMTotal Ckt Km or total stringing required is = 8.96 Km X 3 Ph = 21.69 Km |
| 56 | Dismantling of existing clamps, connectors and accessories from gantry to the Bus bar at the terminal Bay of respective Sub-Station (both ends) and reconnection with HTLS compatible connectors, conductor and clamps both supply and erection complete. |
| 57 | Supply of HTLS Conductor as per specification requirements. |
| 58 | Single Suspension Hard ware fittings (Quantity included mandatory spares: 3 Nos) |
| 59 | Single Tension Hard ware fittings(Quantity included mandatory spares: 4 Nos) |
| 60 | Mid Span Joints(Quantity included mandatory spares: 1 No) |
| 61 | Repair Sleeves(Quantity included mandatory spares: 1 No) |
| 62 | Vibration Dampers(Quantity included mandatory spares: 5 Nos) |
| 63 | Double Tension hardware fittings(Quantity included mandatory spares: 1 No) |
| 64 | 90KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 65 | 70KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 66 | Double Suspension Hard ware fittings(Quantity included mandatory spares: 1 No) |
| 67 | Dead end assembly(Quantity included mandatory spares: 4 Nos) |
| 68 | Jumper Socket(Quantity included mandatory spares: 4 Nos) |
| 69 | Supply of HTLS Conductor as per specification requirements. |
| 70 | Single Suspension Hard ware fittings (Quantity included mandatory spares: 3 Nos) |
| 71 | Single Tension Hard ware fittings(Quantity included mandatory spares: 4 Nos) |
| 72 | Mid Span Joints(Quantity included mandatory spares: 1 No) |
| 73 | Repair Sleeves(Quantity included mandatory spares: 1 No) |
| 74 | Vibration Dampers(Quantity included mandatory spares: 5 Nos) |
| 75 | Double Tension hardware fittings(Quantity included mandatory spares: 1 No) |
| 76 | 90KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 77 | 70KN Disc insulator (Minimum Creepage Distance shall be 320 mm) |
| 78 | Double Suspension Hard ware fittings(Quantity included mandatory spares: 1 No) |
| 79 | Dead end assembly(Quantity included mandatory spares: 4 Nos) |
| 80 | Jumper Socket(Quantity included mandatory spares: 4 Nos) |
| 81 | Preliminary survey including measurement of vertical clearance at maximum sag point, identification and replacement or repairirng of damaged stubs, tower members and earthing and collection of all required documents required for obtaining statutory permission from railways, highway Authorities and other Government bodies as per requirement. |
| 82 | De-stringing of ACSR panther conductor of existing 132kV Depota-Ghoramari line, re-rolling on empty drum,removing of hardware fittings,insulators and accessories, loading and unloading, transportation it to AEGCL store. Length Per Ckt = 14.297KM.Total Ckt Km or total de-stringing required is = 14.297 Km X 3 Ph = 42.891 Km |
| 83 | Paving, stringing,tensioning, Clamping, jointing etc of HTLS conductor with non metallic core using tension pullar machine as per specification requirements in all the phases including hoisting of insulators, fittings of all necessary hardware & accessories i.e fittings, armour rods, vibration damper, supervision of installation and stringing etc.Length Per Ckt = 14.297KM.Total Ckt Km or total stringing required is = 14.297 Km X 3 Ph = 42.891 Km |
| 84 | Dismantling of existing clamps, connectors and accessories from gantry to the Bus bar at the terminal Bay of respective Sub-Station (both ends) and reconnection with HTLS compatible connectors, conductor and clamps both supply and erection complete. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender