Tender For Middleware Cloud Infrastructure (Design And Implementation Of Cloud Infrastructure And Managed Services For Integration Middleware Platform.)
Tender Overview
Project Description
Tender for Middleware Cloud Infrastructure (Design And Implementation Of Cloud Infrastructure And Managed Services For Integration Middleware Platform.)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 05-Sep-2026 | Corrigendum to the tender Notice issued under eNIT 05 of 2026- Revision of Dates | Date | 25-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Middleware Cloud Infrastructure |
| 2 | Cloud Compute — Application + Middleware Server VM, Windows Server (Production) [Primary] |
| 3 | Cloud Compute — Application + Middleware Server VM, Windows Server (Production) [Secondary] |
| 4 | Cloud Compute — Application + Middleware Server VM, Windows Server (UAT) |
| 5 | Cloud Compute — Memory Optimized VM with RDBMS (Production) |
| 6 | Cloud Compute — Memory Optimized VM with RDBMS (UAT) |
| 7 | SSD/Block Disk — Application Server VM (Production) [500 GB] |
| 8 | SSD/Block Disk — Application Server VM (UAT) [100 GB] |
| 9 | SSD/Block Disk — Database Server VM (Production) [512 GB] |
| 10 | SSD/Block Disk — Database Server VM (UAT) [256 GB] |
| 11 | SSD/Block Disk — Bastion/Jump Host VM (Production) [50 GB] |
| 12 | Object Storage (Production) — standalone managed object storage; minimum 3 TB, geographically separate Indian region, versioning enabled, per Section 3, Clause 3.3 — Qty: 30 units (of 100GB) |
| 13 | Networking — WAF / Firewall / Load Balancer / IPs / DNS |
| 14 | Data Backup — 30-day minimum retention, geographically separate Indian region |
| 15 | Cloud Platform Support Subscription — 24x7 platform-level support tier from the cloud provider, commensurate with production SLA |
| 16 | MSP Managed Operations — shared-pool, SLA-based operations per Clause 3.8 and Annexure B |
| 17 | Bastion/Jump Host — 1 VM, 2vCPU/4GB, MFA-enforced, hardened. Shared for Production and UAT management access |
| 18 | VPN Gateway — site-to-site, supporting multiple concurrent tunnels (billing and metering systems, and MDM/HES if confirmed necessary at HLD/LLD) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 14 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender