Bids Are invited for Facility Management Services - Lumpsum Based - Emergency Maintenance Contract For Utility Department; O M Of Mechanical Work; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Work Assistance For Day T
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - Emergency Maintenance Contract For Utility Department; O M Of Mechanical Work; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Work Assistance For Day To Day Regular Maintenance Of Compressors, Dryers And Allied Equipments. , Work Assistance For Day To Day Regular Maintenance Of Water Block And Allied Equipments. , Work Assistance For Inspection Of Water Line / Fire Hydrant Line / Fire Fighting Network/ Sprinkler Pipe Lines / Compressed Air Line. , Work Assistance For Chemical Dosing , Work Assistance For Misc. Jobs , Assistance For Store Activities , Area Sweeping, Cleaning Of Equipments, Trenches. , Assistance Fitter (Sw) , Assistance Welder (Sw) , Assistance Rigger (Sw) , Assistance Usw , Alignment Of Pump And Motor , Pump Suction Strainer Cleaning , Cleaning Of Hot Well Sump Of Cooling Tower I , Cleaning Of Hot Well Sump Of Cooling Tower I(E) / I(Ee) , Cleaning Cooling Tower Basin (Per Cell) , Cleaning Of Cooling Tower Deck And Strainer , Preventive Maintenance Of All Equipments Of Swtp/Wwtp , Overhauling Of Sewerage Pump/ Sludge Pump Of Swtp Of Township , Overhauling Of Sewerage Pump/ Sludge Pump Of Swtp Of Cisf , Overhauling Of Feed Water Pump / Zero Discharge Pump , Preventive Maintenance Of All Pumps Of Zero Discharge And Holding Pool /All Pumps Of Feed Water, Lime Dosing And Alum Regeneration , Repair/ Replacement Of Foot Valve Of Holding Pool Pump/Feed Pump Of Df Plant , Repair/ Replacement Of Foot Valve Of Zero Discharge Pump , Preventive Maintenance Of All Equipments Of Incinerator , Replacement Of Pipe Up To 50 Mm Dia , Replacement Of Pipe More Than 50 Mm Upto 150 Mm , Replacement Of Pipe More Than 150 Mm Up To 300 Mm Dia , Dismantling Of Pipe More Than 50 Mm Upto 150 Mm , Repair Of Pipe More Than 50 Mm Up To 150 Mm Dia , Repair Of Pipe More Than 150 Mm Up To 300 Mm Dia , Repair Of Pipe More Than 50 Mm Up To 150 Mm Dia , Repair Of Pipe More Than 150 Mm Up To 300 Mm Dia , Repair Of Pipe Above Ground More Than 12 Mr Height , Excavation Of Earth , Valve Erection Upto 50 Mm , Valve Erection More Than 50 Mm To 100Mm , Valve Erection More Than 100 Mm To 200 Mm , Valve Erection More Than 200 Mm , Valve Repair More Than 50 Mm To 100Mm , Valve Repair More Than 100 Mm To 200 Mm , Valve Repair More Than 200 Mm , Replacement Of Foot Valve 8 In Water Block & Cisf Colony , Preventive Maintenance Of All Hfo Pumps Of Hfo Unloading Area( 8 Unloading Pumps & 1 Reclaiming Pump) , Preventtive Maintenance Of All Hfo And Ldo Pumps Of Hfo & Ldo Storage Tank Area , Unloading Of Hfo From Rake Of 66 Kl Wagons As Per Scope Of Work. , Preventive Maintenance Of Eot Crane , Grass Cutting
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Work Assistance for day to day regular maintenance of compressors, dryers and allied equipments. | Work Assistance for day to day regular maintenance of compressors, dryers and allied equipments. |
| 2 | Work Assistance for day to day regular maintenance of water block and allied equipments. | Work Assistance for day to day regular maintenance of water block and allied equipments. |
| 3 | Work assistance for inspection of water line / fire hydrant line / fire fighting network/ sprinkler pipe lines / compressed air line. | Work assistance for inspection of water line / fire hydrant line / fire fighting network/ sprinkler pipe lines / compressed air line. |
| 4 | Work assistance for Chemical dosing | Work assistance for Chemical dosing |
| 5 | Work assistance for Misc. jobs | Work assistance for Misc. jobs |
| 6 | Assistance for store activities | Assistance for store activities |
| 7 | Area Sweeping, cleaning of equipments, trenches. | Area Sweeping, cleaning of equipments, trenches. |
| 8 | Assistance fitter (SW) | Assistance fitter (SW) |
| 9 | Assistance welder (SW) | Assistance welder (SW) |
| 10 | Assistance rigger (SW) | Assistance rigger (SW) |
| 11 | Assistance USW | Assistance USW |
| 12 | Alignment of pump and motor | Alignment of pump and motor |
| 13 | Pump suction strainer cleaning | Pump suction strainer cleaning |
| 14 | Cleaning of hot well sump of cooling tower I | Cleaning of hot well sump of cooling tower I |
| 15 | Cleaning of hot well sump of cooling tower I(E) / I(EE) | Cleaning of hot well sump of cooling tower I(E) / I(EE) |
| 16 | Cleaning cooling tower basin (per cell) | Cleaning cooling tower basin (per cell) |
| 17 | Cleaning of cooling tower deck and strainer | Cleaning of cooling tower deck and strainer |
| 18 | Preventive maintenance of all equipments of SWTP/WWTP | Preventive maintenance of all equipments of SWTP/WWTP |
| 19 | Overhauling of sewerage pump/ sludge pump of SWTP of township | Overhauling of sewerage pump/ sludge pump of SWTP of township |
| 20 | Overhauling of sewerage pump/ sludge pump of SWTP of CISF | Overhauling of sewerage pump/ sludge pump of SWTP of CISF |
| 21 | Overhauling of feed water pump / zero discharge pump | Overhauling of feed water pump / zero discharge pump |
| 22 | Preventive maintenance of all pumps of zero discharge and holding pool /all pumps of feed water, lime dosing and alum regeneration | Preventive maintenance of all pumps of zero discharge and holding pool /all pumps of feed water, lime dosing and alum regeneration |
| 23 | Repair/ replacement of foot valve of holding pool pump/feed pump of DF plant | Repair/ replacement of foot valve of holding pool pump/feed pump of DF plant |
| 24 | Repair/ replacement of foot valve of zero discharge pump | Repair/ replacement of foot valve of zero discharge pump |
| 25 | Preventive maintenance of all equipments of incinerator | Preventive maintenance of all equipments of incinerator |
| 26 | Replacement of pipe up to 50 MM dia | Replacement of pipe up to 50 MM dia |
| 27 | Replacement of pipe more than 50 mm upto 150 mm | Replacement of pipe more than 50 mm upto 150 mm |
| 28 | Replacement of pipe more than 150 mm up to 300 mm dia | Replacement of pipe more than 150 mm up to 300 mm dia |
| 29 | Dismantling of pipe more than 50 mm upto 150 mm | Dismantling of pipe more than 50 mm upto 150 mm |
| 30 | Repair of pipe more than 50 mm up to 150 mm dia | Repair of pipe more than 50 mm up to 150 mm dia |
| 31 | Repair of pipe more than 150 mm up to 300 mm dia | Repair of pipe more than 150 mm up to 300 mm dia |
| 32 | Repair of pipe more than 50 mm up to 150 mm dia | Repair of pipe more than 50 mm up to 150 mm dia |
| 33 | Repair of pipe more than 150 mm up to 300 mm dia | Repair of pipe more than 150 mm up to 300 mm dia |
| 34 | REPAIR OF PIPE ABOVE GROUND MORE THAN 12 MR HEIGHT | REPAIR OF PIPE ABOVE GROUND MORE THAN 12 MR HEIGHT |
| 35 | EXCAVATION OF EARTH | EXCAVATION OF EARTH |
| 36 | VALVE ERECTION UPTO 50 MM | VALVE ERECTION UPTO 50 MM |
| 37 | VALVE ERECTION More than 50 MM TO 100MM | VALVE ERECTION More than 50 MM TO 100MM |
| 38 | VALVE ERECTION More than 100 MM TO 200 MM | VALVE ERECTION More than 100 MM TO 200 MM |
| 39 | VALVE ERECTION More than 200 MM | VALVE ERECTION More than 200 MM |
| 40 | VALVE REPAIR More than 50 MM TO 100MM | VALVE REPAIR More than 50 MM TO 100MM |
| 41 | VALVE REPAIR More than 100 MM TO 200 MM | VALVE REPAIR More than 100 MM TO 200 MM |
| 42 | VALVE REPAIR More than 200 MM | VALVE REPAIR More than 200 MM |
| 43 | Replacement of foot valve 8\\" in water block & CISF colony | Replacement of foot valve 8\\" in water block & CISF colony |
| 44 | Preventive maintenance of all HFO pumps of HFO unloading area( 8 unloading pumps & 1 reclaiming pump) | Preventive maintenance of all HFO pumps of HFO unloading area( 8 unloading pumps & 1 reclaiming pump) |
| 45 | Preventtive maintenance of all HFO and LDO pumps of HFO & LDO storage tank area | Preventtive maintenance of all HFO and LDO pumps of HFO & LDO storage tank area |
| 46 | Unloading of HFO from rake of 66 KL wagons as per scope of work. | Unloading of HFO from rake of 66 KL wagons as per scope of work. |
| 47 | Preventive maintenance of EOT crane | Preventive maintenance of EOT crane |
| 48 | Grass cutting | Grass cutting |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender