Tender For Remodelling /Upgradation Of Irrigation Khul Malikpa Shakar Brok (Sdp) Under The Project Of Remodelling /Upgradation Irrigation Khul Sapi Lungma ,Shanchay Shakar Main ,Shagran ,Malikpa Brok Shakardoo ,Khangltak -Tsokbar Sandoo And Shakar Ro
Tender Overview
Project Description
Tender for Remodelling /Upgradation Of Irrigation Khul Malikpa Shakar Brok (Sdp) Under The Project Of Remodelling /Upgradation Irrigation Khul Sapi Lungma ,Shanchay Shakar Main ,Shagran ,Malikpa Brok Shakardoo ,Khangltak -Tsokbar Sandoo And Shakar Rong
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by manual means over areas (exceeding 30cm in depth ,1.5m in weadth as well as 10 sqm on plan ) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m ,as directed by Engineer -in-charge |
| 2 | All Kind of Soil 80% |
| 3 | Ordinary Rock 20% |
| 4 | Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 1 Mtr |
| 5 | All Kind of Soil 80% |
| 6 | Ordinary Rock 20% |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4(1cement:2corse sand (Zone-III) derived from natural:4 graded stone 20mm nominal size derived from natural source Crushed. |
| 8 | Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level excluding cost of form work and including curing complete.. |
| 9 | Dumping/filling of stone in horizontal on level excluding cost of stone |
| 10 | Cement concrete flooring 40mm thick 1:2:4(1cement: 2 Coarse sand: 4 graded stone agg.) finished with a floating coat of net cement slurry, but excluding the cost of nosing of step etc. comlepte 40mm thick with 20mm size stone agg. |
| 11 | Centering and shuttering incld.strutting propping etc. and removal of from for wall any thickness incld. Attached pilaster, buttresses plinth and string coarse ect walls of any thickness |
| 12 | Carriage of material from source to site of work including loding un loading and stacking complete |
| 13 | (ii)Stone by an avg lead of 25 Km by MT and 300 Mtr by Head load |
| 14 | (ii) Sand /Stone aggregate by an avg lead of 25 Km by MT and 300 Mtr by Head load |
| 15 | (ii) Cement by an avg lead of 95 Km by MT and 300 Mtr by Head load |
| 16 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m |
| 17 | Disposal of excavated eavailable earth from cutting, lead upto 2Km by MT and 500 mtr by head load including loading unloading and stacking etc complete. |
| 18 | Dewatering /diversion of nallah during the excavation of work at head work Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender