Expression Of Interest For Empanelment Of Agency For Providing Skilled Man Power Services As And When And Where Required With All Equipments And Machineries (Out Sourcing) For Operation And Maintenance Of Urban Water Supply Scheme Under ?Peyjal Nischay Yo
Tender Overview
Project Description
Expression Of Interest For Empanelment Of Agency For Providing Skilled Man Power Services As And When And Where Required With All Equipments And Machineries (Out Sourcing) For Operation And Maintenance Of Urban Water Supply Scheme Under ?Peyjal Nischay Yojana? Of Nagar Panchayat Turki-Kurhani Under Urban Development Body (Nagar Panchayat Turki-Kurhani) In The District Of Muzaffarpur (Bihar)-A) Plumber (Welder) – 1 No B) Electrician- 1 No C) Fitter-Cum-Mechanic – 1 No D) Mason – 1 No E) Helper – 1 No. F) Operator- 1 No. Repairing Of Motor Pump Per Hp Repairing Of Starter Fsad ( Fully Automatic Star – Delta ) 415 V, 50 Hz I) Start Push Button Ii) Stop Push Button Iii) Volt Meter Iv) Ammeter V) Contractor Vi) Start Capacitor Vii) Running Capacitor Viii) Push To Volt Ix) Indicator X) Mcb Xi) Terminal Block Installation Of New Starter (Single/Three Phase Of Standard Brand Like Crompton /L&T /Bch Etc.) 1 Hp 2 Hp 3 Hp 5 Hp 7.5 Hp 10 Hp 17.5 Hp 20 Hp 25 Hp 30 Hp 40 Hp Repairing Of Stabilizer Restoration Of Rising Main/Delivery Main (Per Meter) Hdpe Pipe 63 Mm Hdpe Pipe 90 Mm Hdpe Pipe 110 Mm G.I. Pipes 50 Mm Dia G.I. Pipes 65 Mm Dia G.I. Pipes 80 Mm Dia Repairing Of Pump Chamber (Per Sq Feet) Leakage Detection & Repairing In Distribution Network (Per Leakage Point) Laying Of New Pipes In Water Distribution Network (Per Meter) Hdpe Pipe 40 Mm ( Pe 100 – Pn 08) Hdpe Pipe 50 Mm ( Pe 100 – Pn 08) Hdpe Pipe 63 Mm ( Pe 100 – Pn 10) Hdpe Pipe 75 Mm ( Pe 100 – Pn 10) Hdpe Pipe 90 Mm ( Pe 100 – Pn 10) Hdpe Pipe 110 Mm ( Pe 100 – Pn 10) Hdpe Pipe 125 Mm ( Pe 100 – Pn 10) Hdpe Pipe 140 Mm ( Pe 100 – Pn 10) Hdpe Pipe 160 Mm ( Pe 100 – Pn 10) Hdpe Pipe 180 Mm ( Pe 100 – Pn 10) Hdpe Pipe 200 Mm ( Pe 100 – Pn 10) Hdpe Pipe 225 Mm ( Pe 100 – Pn 10) G.I. Pipes 15 Mm Dia G.I. Pipes 20 Mm Dia G.I. Pipes 25 Mm Dia G.I. Pipes 32 Mm Dia G.I. Pipes 40 Mm Dia G.I. Pipes 50 Mm Dia G.I. Pipes 65 Mm Dia G.I. Pipes 80 Mm Dia Provision For Pcc Road Cutting & Its Restoration (Cum Meter) Ferrule Replacement (C.I. Brass Ferrule With Mouth Cover 15 Mm Nominal Dia 20 Mm Nominal Dia 25 Mm Nominal Dia House Connection/ Stand Post Repairing I) Providing And Laying Mdpe Pipe 20 Mm Dia Nominal Bore: 6M With Proper Position Including All Specials By Compression Fitting/Electrofusion All Complete. Ii) Providing & Fixing Gi Pipe Complete With Gi Fittings And Clamps All Complete -15 Mm Nominal Bore Iii) Brass Ferrule With Mouth Cover- 15 Mm Nominal Dia Iv) Female Adopter For Adjoining The Ferrule To Mdpe Pipe V) Female Adopter For Adjoining The Mdpe Pipe To Gi Pipe Vi) Hdpe Electrofusion Service Saddle Including All Complete Job As Per Direction Of E/I Vii) Brass Bib Cock Of Approved Quality: 15Mm Nominal Bore Viii) Plastic Bib Cock Approved Quality: 15Mm Nominal Bore Providing New House Connections From Water Supply Distribution Line All Complete As Per Standard Providing New House Connections From Water Supply Distribution Line All Complete As Per Standard Restoration Work Of Check Valve/Stop Valve/Gate Valve Repairing Of Gate Valve Chamber/Sluice Valve Chamber In Respect Of Distribution Network Repairing Of Oht/Pvc Tank (Per Litre Capacity) Cleaning Of Oht/Pvc Tank (Per 1000 Litre) Repairing Of Steel/Rcc Staging Structure Work (Per Kg Steel) Scada / Iot Repairing& Restoration Consumable Items Any Other (Please Specify) Rate For Major Repairing (Excluding Manpower Cost) A. Installation Of New Boring In Case Of Bore Failure And Networking With Raising Main B. Installation Work Of New Motor C. Installation Of New Oht/Pvc Tank D. Construction/Installation Of New Steel/Rcc Staging E. Extension Of Distribution Network Along With House Connection F. Restoration Of Damaged Pipeline More Than 100M Length During Natural Calamity G. Change Of Filter Media Of Irp As Per Manufactures Guideline H. Installation Of New Electric Transformer I. Any Other Major Work Related To Water Supply Scheme Not Mentioned Above. Equipment Rate Per Hour (Excluding Labour Cost)
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender