Tender For Restoration Of Damaged Water Supply Scheme Of Chamba Pumping Due To Natural Calamity On Dated 16.09.2025 Under New Tehri Division
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Sep 2026
13 days left
EMD
2.45 Lakhs
Bank guarantee accepted
Document Fee
4720
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Tehri Garhwal → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Restoration Of Damaged Water Supply Scheme Of Chamba Pumping Due To Natural Calamity On Dated 16.09.2025 Under New Tehri Division
BOQ
| Sl. No. | Item Description |
| 1 | Slip clearance (by manual means) of boulders only including disposal complete as directed by the Engineer-in-charge. |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manualmeans in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a leadof 50 m.For All kind of soil |
| 3 | Providing of all materials, Carting from site store to site of work, Loweringinto trenches with true to alignment, Laying of MSERW Pipes grade Yst210, confirming to IS: 1978 - 1982, jointing by electric welding processwith proper grade of eletrodes suitable for jointing of water supply pipelines (Ador, L&T or equivalent electrodes) by cutting of pipes and makingrequired bends by welding, completion of work with hydrostatic testing of pipe line etc complete and including Pipe Material Laboratory test reports. |
| 4 | 200 mm dia 7.9 thickness MSERW pipe |
| 5 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of allmaterial, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction. Structural design and drawing etc. complete |
| 6 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc.complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction |
| 7 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)GI wire 8 gauge BWG |
| 8 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204(For height upto 5 m |
| 9 | Nominal mix 1:2:4 (Hand mixed) M 20 |
| 10 | Cement Concrete (PCC M-30) Pavement:- Constructionof Un-reinforced,Cement concretepavement, thicknessas per design,over a prepeared sub base with 43 grade cementor anyother type PCC GradeM-30,coar seand fineaggre gates conforming to IS:383, maximum size of coarseaggregatenot exceeding25mm,mixed ina concretemixer of not less then0.2cumcapacityandappropriateweigh batcherusingapprovedmixdesign, laid inapprovedfixedsideformwork (Steelchannel, layingandfixingofwedges,steelplates includinglevelling theformwork,asperdrawing),spreadingtheconcretewithshovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concreteslabsfor14days,usingcuringcompound wherespecifiedandwater finishingtolinesandgradeasperdrawingsand technical specifications. |
| 11 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction. Structural design and drawing etc. complete |
| 12 | Brick masonry in cement mortar 1:4 |
| 13 | Supplying and installing following size of perforatedHot Dipped Galvanised Iron cable tray \\"Cross member\\" (galvanisation not less than 50 microns)with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with two numbers GI Suspenders i/c base of suitable size GI angle, GI bolts & nuts, fastner etc as required |
| 14 | by truck for pipe,steel& cement from rishikesh |
| 15 | provision for sign board |
| 16 | SITC OF WILO MAKE CENTRIFUGAL PUMP, MOTOR, AND CONTROL PANEL CUM STARTER WITH COMPLETE E&M WORKS AT CHAMBA PUMPING SCHEME. |
| 17 | SUPPLY INSTALLATION TESTING & COMMISSINONING OF ENGERY EFFICIENT ELECTRIC DRIVEN HORIZONTAL CENTRIFUGAL CLEAR WATER KSB/WILO OR EQUIVALENT MAKE PUMP CAPABLE OF DELIVERING 1000 LPM DISCHARGE AGAINST HEAD OF 440 METER |
| 18 | SUPPLY INSTALLATION TESTING & COMMISSINONING OF BCH/CROMPTON/ABB OR EQUIVALENT MAKE INDUCTION MOTOR TEFC 2900 RPM OPERATING AT 415+- 10 % VOLT 3 PHASE, 132 KW, IE3 SUITABLE FOR ABOVE PUMP |
| 19 | Supply of MS channel fabricated heavy duty base plate with foundation bolt suitable for mounting above pump and motor. |
| 20 | Supply of coupling set, coupling guard and rubber bush, suitable for above pump and motor. |
| 21 | Supply of dust and verming proof cubicol type floor mountaining type control panel made out of 14SWG sheet steel having bush bar chamber with copper bush bar comprising of following.MAIN INCOMINGINCOMING : 01 NO630 Amp /415Volt ACB/MCCBOUT GOING : 02 NOS400 Amp MCCB- 2 Nos & 125 Amp MCCB-1 No(i) 0-1000 Amp meter with CT\\" & selector switch- 01 No.(ii) Frequency meter- 01 No.(iii) KWH meter-01 No.(iv) Phase indication lamp-01 set(v) Power factor meter-01 No.(vi) IDMT relay-01 No. |
| 22 | SITC of fully automatic starter with ATS type push button operated suitable to above pump motor set. |
| 23 | Power wiring |
| 24 | Supply of copper conductor cable Single core Mutli run 120 sq. mm ( Havels/Finolex) including LT jointing material such as copper Lugs, tape, gland etc as per requirement. |
| 25 | Jointing material such as lugs, tapes, as per required. |
| 26 | Complte double earthing with material such as earth plate, earth strips, coal and salt etc required as per . |
| 27 | MAIN PIPING AND VALVES:(A) SUCTION SIDECID/F sluice valve 250mm with hand wheel P.N. 1.6 (Kirlosker / VAG)/ OR EQUIVALENT MAKEMSDF Bend 250 mm dia 90 degree, 4.8 mm wall thickness.MSDF Taper 250 mm dia size of pump inlet 7.1 mm wall thickness.Supply of MS ERW pipe 250 mm dia 10 mtr. Long, 4.8 mm wall thickness.Blind Flage 250 mm size. |
| 28 | (B) DELIVERY SIDE AND BYPASS ARRANGMENT:- |
| 29 | 200 mm dia delivery line with common header with 200 mm size ASA 600 sluice valve KBL/WJ OR EQUIVALENT make and MSDF 90 degree bend in each pump set.1-CS D/F Sluice valve 200 mm with hand wheel class 600 ASA. : 02 nos2- CS D/F non return valve 200 mm class 600 ASA. : 01 nos3- MS D/F Taper 200 X 100 mm dia size of pump outlet 7.1mm wall thickness. : 02 nos4- MS flanged \\"Tee\\" 200X200X200 mm 7.1mm wall thickness: 02 NO5- MS A/F radial \\"Tee\\" 200X200X200 mm 7.1mm wall thickness. : 02 NO6- MS Blind flanged 200mm 34 mm wall thickness 01 No.7- MSDF Distance piece 200mm dia 1.5mtr. Long 7.1mm wall thickness. 01 No.8- MSDF Distance piece 200mm dia 3mtr. Long 7.1mm wall thickness. 01 No.9- Necessary MS Bolts, Nuts, washers, packing required for fixing of above \\"W\\" make high tensile ( Lump Sump) |
| 30 | GAUGES: |
| 31 | 1- Supply of 200 mm dia Pressure gauge with control cock & fittings. 0-70 kg per cm squire.2- Supply of 150 mm dia with compound gauge with control cock & fittings. 0-70 kg per cm squire. 02 No |
| 32 | Supply of Fire extinguisher (6 Kg.) Co2 ABC type, class C |
| 33 | Supply of Rubber resistance sheet size 1X2X0.015m |
| 34 | Supply of following tools required for maintenace of pumping plants.(i) DE spanner set 12 Pieces: 1 Set.(ii) Ring spanner set 12 Pieces: 1 Set.(iii) Screw driver 200/250/300 mm size:3 Nos.(iv) Insulated Plier 200/250 mm size: 2 No.(v) Hammer 2 Kg: 1 No.(vi) Water pump plier 250 mm size: 1 No.(vii) Line tester: 1 No.(viii) Pipe wrench 300/350 mm size- 2 Nos.(ix) Screw wrench 300 mm size- 1 No.(x) Bearing Puller-1 No.(xi) Crimpling tool (Hydraulic type)-1 No.(xii) Digital Tong tester - 1 No. |
| 35 | CARTGAE AT SITE (LUM SUM) |
| 36 | INSTALLATION AND COMMISSIONING OF PUMPING PLANTS WITH ACCESSORIES INSIDE THE PUMP HOUSE WITH ALL CIVIL WORKS SUCH AS MAKING OF RCC FOUNDATIONS, EYE BOLT, REQUIRED NUT BOLT WASHER, CHAMPION PACKING COMPLETE AS PER REQUIREMENT CABLE TRENCHES COVER ETC. INCLUDING INSTALLATION & TESTING WORKS COMPLETE. |
| 37 | DISMANTLING OF ALL THE EXISTING SYSTEM ONE BY ONE IN SUCH A WAY THAT WHEN SITC OF ONE SET IS COMPLETED THAN OTHER SET IS DISMANTLED BY ENSURING NO OR MINIMUM DISTURBANCE IN CURRENT WATER SUPPLY. |
| 38 | TESTING ALL EQUIPMENT & MATERIALS AT MANUFACTURERS END DURING MANUFACTURING BY TPI AGENCY INCLUDING ALL EXPENSES |
| 39 | PAINTING OF ENTIRE INSTALLATION |
| 40 | Environmental and Safety Measures in Design & ConstructionEnvironment Monitoring (Pre-construction Stage) |
| 41 | Ambient Air Quality (PM,M2.5, PM10, Sox, NOx, CO) |
| 42 | Surface Water quality (IS 2294) |
| 43 | Noise Levels (Day time and night time noise level (max, min & Leq levels) |
| 44 | Environment Monitoring (construction Stage) |
| 45 | Ambient Air Quality (PM,PM2.5, PM10, Sox, NOx, CO) |
| 46 | Surface Water quality (IS 2294) |
| 47 | Noise Levels (Day time and night time noise level (max, min & Leq levels) |
| 48 | Water Sprinkling to suppress dust |
| 49 | Provision of Mobile Toilets at Work Site including maintenance till Construction Period |
| 50 | (i) Supply and commissioning of mobile toilets on wheel/ prefab toilet (2 units each Toilet and Bathroom) with proper water supply and drainage system, electric supply and safe access at work site locations |
| 51 | (ii) Maintenance: Daily cleaning twice a day by engaging one permanent helper |
| 52 | (iii) Painting at every six months |
| 53 | Environmental Protection, Safety, IEC and Social & Environmental Trainings |
| 54 | ESMP and OHS Training at site (1 day) |
| 55 | Labour Laws Training at site (1 day) |
| 56 | Training on sensitization on Gender issues including SEA/SH Provisions |
| 57 | GRC meeting/ stakeholder meeting |
| 58 | community Meetings/Public Consultations & Community Health and Safety Training |
| 59 | Awareness Training for HIV/AIDS and other STDs |
| 60 | Project Information boards as per as per direction of Engineering Encharge |
| 61 | Potable water quality Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 27, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 28, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysSep 29, 2026
Bid Opening Date
Technical bids will be opened and evaluated.