Tender For Water Supply Work In Athoor Block Of Dindigul District.- Deepening Of Existing Bore Well With Motor ,Pipeline At Karunkulam Puthamadu In Palayankottai H/O Palayankottai.
Tender Overview
Project Description
Tender For Water Supply Work In Athoor Block Of Dindigul District.- Deepening Of Existing Bore Well With Motor ,Pipeline At Karunkulam Puthamadu In Palayankottai H/O Palayankottai.- 2 Drilling Of 6\ Dia Vertical Bore Well In Hard Rock Area As Per The Recommendation Of Hydrogeology Including The Rig Transportation Inserting Of Casting Pipe And Flushing Etc., Complete. 3 Supply Of 200Mm Pvc Casing Pipe Rs As Per Is 12818/2010 4 Supply Of New 7.5Hp Submersible Pumpset With Panel Board Having Duty Of 50Lpm X 225 M Head With Isi Make 5 40Mm Upvc Column Pipe 6 40Mm Gi Hex Nipple 7 40Mm Gi Coupling 8 40Mm Gi Elbow 9 40Mm Gm Gatevalve 10 40Mm Gi Union 11 40Mm M.S Clampset 12 Solvent Cement 13 Supply Of 4.0 Sqm Sub - Cable 14 63Mm Pvc Pipe 6Ksc 15 63Mm Pvc Coupler 16 63Mm Pvc Tee 17 63Mm Pvc Bend 18 Sintex Tank 1000 Liter 19 Errection Of Sunbersible Pumpset Into Boe Well Including Fixing And Joining Cable With Proper Clamps Into The Level To Required Depth And Also Fixing The Riser Pipe To Required Depth Panel Board Fitting, Valve Fitting And Constrol Equipment Fitting, Twin 20 Labour Charges Providing Of Eb Service Main Arrangement From Eb Post To Pump Room And Fitting Service Pipe Eb Board Wiring Comple Including 7/20 Pvc Overhead Wiring Main Fuse Unit Gi Wire And All Meterials Fixing Complete. 21 Construction Of Padastal Including All Cost And Conveyance Of All Charges Etc... 22 Providing Of Bore Well Pit Protection Arrangements Using 8\ Ms Pipe Fitting Complete Or Handpump Body Bottam Fixing Charges 23 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 08-Sep-2026 | Date change | Date | 16-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Name of the work : 1.Deepening of Existing bore well with Motor ,Pipeline at Karunkulam Puthamadu in Palayankottai H/o Palayankottai.Estimate amount : Rs. 4.50 Lakhs |
| 2 | Drilling of 6\\" dia vertical bore well in hard rock area as per the recommendation of hydrogeology including the rig transportation inserting of casting pipe and flushing etc., complete. |
| 3 | Supply of 200mm PVC Casing pipe Rs As per Is 12818/2010 |
| 4 | Supply of New 7.5HP submersible pumpset with panel board having duty of 50LPM X 225 M Head with ISI make |
| 5 | 40mm UPVC Column pipe |
| 6 | 40mm GI hex Nipple |
| 7 | 40mm GI coupling |
| 8 | 40mm GI Elbow |
| 9 | 40mm GM Gatevalve |
| 10 | 40mm GI Union |
| 11 | 40mm M.S clampset |
| 12 | Solvent cement |
| 13 | Supply of 4.0 sqm sub - cable |
| 14 | 63mm PVC pipe 6ksc |
| 15 | 63mm PVC Coupler |
| 16 | 63mm PVC TEE |
| 17 | 63mm PVC Bend |
| 18 | Sintex tank 1000 liter |
| 19 | Errection of sunbersible Pumpset into boe well including fixing and joining cable with proper clamps into the level to required depth and also fixing the riser pipe to required depth panel board fitting, valve fitting and constrol equipment fitting, twin |
| 20 | Labour charges Providing of EB service main arrangement from EB post to pump room and fitting service pipe EB board wiring comple including 7/20 PVC overhead wiring main fuse unit GI wire and all meterials fixing complete. |
| 21 | Construction of Padastal including all Cost and Conveyance of all Charges etc... |
| 22 | Providing of bore well pit protection arrangements using 8\\" MS pipe fitting complete or Handpump body bottam fixing charges |
| 23 | Earth work excavation hard stiff clay and hard rock earth and pipe laying , jointing and refilling the trench with excavation soils |
| 24 | Laying of the pipe line and jointing to Proper gradient and all labour charges etc. |
| 25 | Provision for Name board |
| 26 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender