Tender For Tirupathur District Sfc (Dp) 2026-27 Construction Of New 60000 Litre Oht 12.M At Lambadi Vattam In Pachal Panchayat Jolarpet Block Package No.23
Tender Value
27 Lakhs
Estimated cost
Bid Submission
10 Sep 2026
10 days left
EMD
54000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Tirupathur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Tirupathur District Sfc (Dp) 2026-27 Construction Of New 60000 Litre Oht 12.M At Lambadi Vattam In Pachal Panchayat Jolarpet Block Package No.23
BOQ
| Sl. No. | Item Description |
| 1 | Constrution of New 60000 liters OHT 12.0m at Lambadi vattam in Pachal |
| 2 | Earthwork excavation Hard stiff clay blcak cotton, hard red earth, shales, murram, etc.SS 20B |
| 3 | 1st depth |
| 4 | 2nd depth |
| 5 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification. |
| 6 | Cement concrete 1:4:8 using 40mm HBGS for leveling course |
| 7 | RCC using M30 grade mix using 20mm HBGS and 10mm HBS excludig the cost of reinforcemet, centering and shuttering but including the cost of mixing placing vibrating of concrete curing and finishing etc, complete as directed by the officers. |
| 8 | below 1.50mfrom GL |
| 9 | Upto GL. |
| 10 | Above GL. And upto 4.50 m. ht. |
| 11 | Above GL. And upto 4.50 m. ht. |
| 12 | Above 4.50m. And upto 7.32 m. ht. from GL. |
| 13 | Above 7.32 m. and upto 10.98 m. ht. from GL. |
| 14 | Above 10.98 m. and upto 14.64 m. ht. from GL. |
| 15 | Above 14.64 m. and upto 18.30 m. ht. from GL. |
| 16 | centering for soffits of RCC members or plane surfaces including shuttering, strutting to centering and providing supports etc completefor the following members using MS sheets of size 90 cm x 60 cm BG 10 gauge stiffened with welded M.S angles of size 25x25x3mm laid over silver oak (country wood) joist of size 10x6.5 cm (spaced @ about 90 cm c/c ) and supported by casurina props of 10 to 13 cm dia ( spaced at 75cm C/C ) and as directed by the officers |
| 17 | Square surface: |
| 18 | columns below GL and above GL. Upto 3.30 m. ht. |
| 19 | columns above 3.30m to 4.30m height from GL |
| 20 | columns above 4.30m to upto 5.30m height from GL |
| 21 | columns above 5.30m to upto 6.30m height from GL |
| 22 | columns above 6.30m upto 7.30m height from ground level |
| 23 | columns above 7.30m upto 8.30m height from ground level |
| 24 | columns above 8.30m upto 9.30m height from ground level |
| 25 | columns above 9.30m upto 10.30m height from ground level |
| 26 | columns above 10.30m upto 11.30m height from ground level |
| 27 | columns above 11.30m upto 11.40m height from ground level |
| 28 | Plane surfaces |
| 29 | below ground leavelupto 3.30m height above ground level |
| 30 | from GL to upto 3.30m height above ground level braces at 2.875m abovea ground level |
| 31 | from 3.31 to 4.30m |
| 32 | from 5.30m to 6.30m height above ground level |
| 33 | from 6.31m to 7.30m height above ground level |
| 34 | from 8.30m to 9.30m height above ground level |
| 35 | from 9.31m to 10.30m height above ground level |
| 36 | from 11.30m to 12.30m height above ground level |
| 37 | Curved surface |
| 38 | upto 3.30m height (from floor slab) |
| 39 | from 3.30m to 4.30m height(from floor slab) |
| 40 | Supplying fabricating and placing in position of RTS steel rods for reinforcement for various members including cost of steel and binding wire for all RCC works as directed by the officers |
| 41 | Painting two coats using ready mixed Plastic Emulsion paint inlcuding priming coat and cost and conveyance of paint and all labour charges etc complete |
| 42 | pipe line arrangement |
| 43 | for Inlet arrangements |
| 44 | 65mm dia GI pipes |
| 45 | 65mm dia GI couplings |
| 46 | 65mm dia GI elbow |
| 47 | 65mm dia flange set |
| 48 | 75mm pvc threaded coupler |
| 49 | for outlet arrangements |
| 50 | 65mm dia GI pipes |
| 51 | 65mm dia GI couplings |
| 52 | 65mm dia GI elbow |
| 53 | 65mm dia flange set |
| 54 | 65mm GM gate valve |
| 55 | 75mm pvc threaded coupler |
| 56 | for scour arrangements |
| 57 | 65mm dia GI pipes |
| 58 | 65mm dia GI couplings |
| 59 | 65mm dia GI elbow |
| 60 | 65mm dia flange set |
| 61 | 65mm GM gate valve |
| 62 | 90mm pvc threaded coupler |
| 63 | for over arrangements |
| 64 | 65mm dia GI pipes |
| 65 | 65mm dia GI couplings |
| 66 | 65mm dia GI elbow |
| 67 | 65mm dia flange set |
| 68 | 90mm pvc threaded coupler |
| 69 | Rubber insertion sheet |
| 70 | Bolts and nuts |
| 71 | 65mm GI pipe- cutting |
| 72 | 65mm GI pipe- threading |
| 73 | Labour charges for lifting, positioning GI pipes in vertical direction and providing inter connection with service reservoir |
| 74 | Fabrication, supply, delivery and fixing of outside MS ladder 45cm clear wide made out of 50mm x 50mm x 6mm MS angle for both sides and for s teps at 30cm C/C welded ;joint etc for 1st staging from ground level to first level brace ,( weight 4.50 KG/M) second and third staging upto floor slab and 4th staging from floor slab to roof top supply and delivery , fixing of 32mm GI pipes, medium for hand rails from 1st stage to 4th stage. RCC M30 grade mix for landing slabs - 5Nos. ( ground level - 1No. and above ground level - 4 Nos.) supply and fixing of 32mm GI pipes medium for hands raise for the landing slab. supply and fixing MS base plate of 100mm x 100mm x 6mm thick for anchor fastener bolt for fixing of hand rails at landing slab and MS ladder, providing locking arrangements with two coats of approved enemel paint over one coat of red axide paint as per approved type design and as directed by the officers |
| 75 | supply, delivery and fixin;g in position of CI manhole cover and frame of size 60x60cm on roof slab and as directed by the officers. The Manhole frame and cover should be of light duty and conforming to IS 1726/1974. |
| 76 | RCC 1:1.5:3 ( one cement,one and half sand and three 20mm size HBG stone ) for the RCC inside ladder including the cost of reinforcement fabrication centering and shuttering , cost of mixing placing of concrete vibrate curing , finising etc complete including fixing of RCC ladder etc, complete as directed by the officers. |
| 77 | Hand rail roof sub estimate |
| 78 | soak pit |
| 79 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil of foundation. |
| 80 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance with labour charges etc., |
| 81 | Supply and erection of centring including all labour charges etc. |
| 82 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance with labour charges etc., |
| 83 | Supply and filling of 225mm Size metal from approved quarry including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification |
| 84 | Supply and filling of 20mm Size metal from approved quarry including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification |
| 85 | Supply of 0.60 m dia Cement Ringsincluding cost and conveyance etc |
| 86 | Supply of 0.60 m dia Cement Cover slab including cost and conveyance etc |
| 87 | Supply of pvc pipe 90mm dia including necessary joint for inspection chamber to the soak pit etc. |
| 88 | Pipe line |
| 89 | 75 mm PVC 4KSC |
| 90 | 75 mm bend |
| 91 | 75 mmTee |
| 92 | 75mm PVC Gate Value |
| 93 | Earth work excavation and depositing on bank with initial lead and lift in all soil (1m x0.60m x0.90m) |
| 94 | Laying and jointing the PVC pipes & specials into trench |
| 95 | Refilling the trench with excavated after laying the pipe |
| 96 | Provision for colorination kit |
| 97 | Compound Wall |
| 98 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete. |
| 99 | Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 100 | Rein forcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor |
| 101 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle BELOW |
| 102 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle ABOVE |
| 103 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. |
| 104 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 105 | Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 106 | Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc., complete. |
| 107 | Supply and fixing of Grill Gate including all labour charges etc completed |
| 108 | Name Board charges |
| 109 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 28, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 10, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysSep 11, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender