Tender For Strengthening The Road From Katchupalli Panickanur Road To Devanur-Kollapalayam Road Km 0/0-1/8 Head Of Koran Atti Panchayat In Konganpauram Block At Salem District
Tender Value
98.45 Lakhs
Estimated cost
Bid Submission
17 Sep 2026
1 days left
EMD
99000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Salem → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Strengthening The Road From Katchupalli Panickanur Road To Devanur-Kollapalayam Road Km 0/0-1/8 Head Of Koran Atti Panchayat In Konganpauram Block At Salem District
BOQ
| Sl. No. | Item Description |
| 1 | Strengthening the road from Katchupalli panickanur road to Devanur-Kollapalayam road KM 0/0-1/8 H/O Koranampatti. |
| 2 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc.,complete. |
| 3 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m |
| 4 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other inc idental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. |
| 5 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 6 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 7 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 8 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 |
| 9 | Road Marking With Hot Applied Thermoplastic Compound With reflectorising glass beads on bituminous surface. providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 Gms Per Sqm Area, thickness of 2.5 mm is exclusive of surface applied glass beads as per irc:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification no.803 |
| 10 | Provision for Kilo Metre Stone - Nos |
| 11 | Provision for Hecta Metre Stone - Nos |
| 12 | Provision for Cautionary Sign board charges (60cm equilateral triangle) |
| 13 | Provision for Retaining wall as per sub estimate @ CH 0m,660m,810m |
| 14 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B. |
| 15 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. |
| 16 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc.. |
| 17 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. |
| 18 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, |
| 19 | provision for Wheepholes 100mm dia PVC Pipe |
| 20 | Provision for 3m span Culvert as per sub estimate @ CH 300m |
| 21 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20B. |
| 22 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. |
| 23 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc..., |
| 24 | Deck slab bottom |
| 25 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. |
| 26 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. |
| 27 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works..etc…, |
| 28 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 29 | Gravel filling between body wall inclding cost and convenyance of Gravel labour for filling watering and compacting etc.,complete complying with standard specification and as directed by the deportmental officer. |
| 30 | Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m |
| 31 | For the First Year from the date of completion of work |
| 32 | For the Second Year from the date of completion of work |
| 33 | For the Third Year from the date of completion of work |
| 34 | For the Fourth Year from the date of completion of work |
| 35 | For the Fifth Year from the date of completion of work |
| 36 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 29, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 17, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 daySep 17, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender