Power Boards / Undertakings / PSU Closing in 4 days TDR #57240175

Tender For Tnpgcl - Mtps-I - (4 × 210Mw) - Mechanical -Ii Circle- Oil & Ash Handling Division - Bottom Ash Hopper -Iii & Iv - Outsourcing The Operation And Routine Maintenance, Break Down Maintenance Of Scrapper Feeders, Clinker Grinders, Hp/Lp Pipel

Issued by Boards / Undertakings / PSU · Salem, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
23 Sep 2026
4 days left
EMD
46100
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Salem → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Tnpgcl - Mtps-I - (4 × 210Mw) - Mechanical -Ii Circle- Oil & Ash Handling Division - Bottom Ash Hopper -Iii & Iv - Outsourcing The Operation And Routine Maintenance, Break Down Maintenance Of Scrapper Feeders, Clinker Grinders, Hp/Lp Pipelines, Valves, Mixing Apparatus Of Economiser Hoppers And Air Preheater Hoppers, Trenches, Cleaning And Clearing Of Spilled Ash From Bottom Ash Hopper To Ash Handling Pump House Sump, Including Consumables & T&Ps Etc., (Except Spares And Materials) For The Period Of 182 Days From The Date Of Taken Over Of The Site.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 09-Sep-2026 Corrigendum for BQR Technical Bid 23-Sep-2026
2 09-Sep-2026 Due date extension Date 23-Sep-2026

BOQ

Name of Work:- TNPGCL - MTPS-I - (4 × 210MW) - Mechanical -II circle- Oil & Ash handling Division – Bottom Ash Hopper -III & IV – Outsourcing the operation and routine maintenance, break down maintenance of scrapper feeders, clinker grinders, HP/LP pipelines, Valves, Mixing apparatus of Economiser hoppers and air preheater hoppers, trenches, cleaning and clearing of spilled ash from bottom ash hopper to ash handling pump house sump, including consumables & T&Ps etc., (Except spares and materials) for the period of 182 days from the date of taken over of the site.
Sl. No. Item Description
1Charges for carrying out round the clock shift operation and routine shift maintenance in Bottom Ash Hopper, Scrapper feeders, Clinker Grinders, HP/LP pipelines, Valves, Mixing apparatus of Economizer hoppers and air preheater hoppers and clearing of choke in Scrapper Feeders, Clinker Grinders, Mixing apparatus of Economizer hoppers and air preheater hoppers and also in trenches from bottom ash hopper to ash handling pump house sump for Unit-III (1 operation includes 3 shifts per day for Unit-III)
2Charges for carrying out round the clock shift operation and routine shift maintenance in Bottom Ash Hopper, Scrapper feeders, Clinker Grinders, HP/LP pipelines, Valves, Mixing apparatus of Economizer hoppers and air preheater hoppers and clearing of choke in Scrapper Feeders, Clinker Grinders, Mixing apparatus of Economizer hoppers and air preheater hoppers and also in trenches from bottom ash hopper to ash handling pump house sump for Unit-IV (1 operation includes 3 shifts per day for Unit-IV)
3Charges for dismantling of Scrapper feeder submerged wheel door frames, cleaning and inspection of bearings, shafts, oil seals if necessary for replacement of bearings old/new and reassembling after packing with gasket.
4Charges for Cutting, removal and renewal of complete set of worn out / eroded ‘U’ Clamps, ‘L’ bracket, Scrapper Chains and Scrapper Bars in scrapper feeder Reassembling of Scrapper bars ‘ L’ bracket, Scrapper Chains and ‘U’ Clamps, Self locking plate.
5Charges for renewal of wornout bearings/ main drive shaft` in scrapper feeder by dismantling gear box, gear coupling dissection of scrapper bar chain shackle removing main drive shaft from plumber block renewing the bearings and reassembling.
6Charges for dismantling of scrapper feeder, return idler wheel/ take up idler wheel new /old and removal of inspection of bearings, shafts, oil seals if necessary replacement of bearings old / new and reassembling.
7Charges for removing clinker grinder gear box top covers, cleaning the gear teeth, internals oil seals, renewal of bearings and drive pinion shaft and refilling oil.
8Charges for dismantling of clinker grinder bearing housing replacing the old/new bearings in driven and driver rollers and reassembling the same.
9Charges for dismantling of clinker grinder which this work involves removal of driven sprocket, gear wheels, bearing housing cover, bearing housing gland assembly, bearing housing base plate, clinker grinder drive and driven shaft with rollers, Apron plate and guide plates and seal water line in CG’s.
10Charges for replacement of wornout S.S liner plates, Scrapper bar guide plates etc., by removing scrapper bar, “U” links from scrapper feeder and reassembling after replacement of SS liner plate, scrapper bar guide plates. (Required quantity of SS plates will be supplied by TNPGCL)
11Charges for replacement of wornout M.S door plates, Bottom structure portion, supporting channels, slope plates, chute, M.S guide plates etc. (Required quantity of M.S plates, channels will be supplied by TNPGCL)
12Charges for assembling the clinker grinder which involves inspection of S.S. sleeve, apron plate and guide plate for wear and tear and replacement if necessary, assembling of drive / driven roller with shaft assembly, fixing of bearing housing base plate assembly, inspection of pressure ring and lantern ring for wear and tear and replacement if necessary, packing of graphite rope and fixing of gland by gland packing nut and tightening by sleeve lock nut, inspection of oil seal (inner) and bearings for wear and tear and replacement if necessary, fixing of bearing housing and tightening of lock nut, inspection of oil seal (outer) for wear and tear and replacement if necessary, fixing of bearing cover, assembling of driven sprocket and tightening by lock nut, assembling of gear wheels and tightening by nut, assembling of seal water line including consumables like diesel, cotton waste G.I. pipes and fittings for seal water line, etc. (Note: The required oil seals and gland rope supplied by contractor scope).
13Charges for loading and transporting of new materials from central stores/MTPS-I and unloading and at work site (LS) and vice-versa
14Charges for T&P and consumables Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57240175
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 23-09-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Tnpgcl - Mtps-I - (4 × 210Mw) - Mechanical -Ii Circle- Oil & Ash Handling Division - Bottom Ash Hopper -Iii & Iv - Outsourcing The Operation And Routine Maintenance, Break Down Maintenance Of Scrapper Feeders, Clinker Grinders, Hp/Lp Pipelines, Valves, Mixing Apparatus Of Economiser Hoppers And Air Preheater Hoppers, Trenches, Cleaning And Clearing Of Spilled Ash From Bottom Ash Hopper To Ash Handling Pump House Sump, Including Consumables & T&Ps Etc., (Except Spares And Materials) For The Period Of 182 Days From The Date Of Taken Over Of The Site.
Basic Detail
Tender No CE SE M II MTPS I O AHS OT 12 2026 2027
Bidding Type Tender
Location
City Salem
State Tamil Nadu
Key Dates
Publish Date 09 Sep 2026
Submission Date 23 Sep 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 46100
Exemption Available
Document List
BOQ_839818.xls
dade1eaa-4d8a-4cbd-ae7e-9becc6c01d1e.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 23, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 4 days
Sep 23, 2026
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 4 days
Sep 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_839818.xls

html

dade1eaa-4d8a-4cbd-ae7e-9becc6c01d1e.html

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders