Contract for Development of Gati Shakti Multi-Modal Cargo Terminal (GCT) at Magarwara (MGW) Station Entirely on Railway Land

Issued by Government Departments · Lucknow, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Sep 2026
18 days left
EMD
1.60 Crore
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Lucknow → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Contract For Development Of Gati Shakti Multi-Modal Cargo Terminal (Gct) At Magarwara (Mgw) Station Entirely On Railway Land , - Description: - The Advertised Value Is An Indicative Figure, Just To Emphasize That The Bidding Parameter To Be Filled By The Bidder Is In Terms Of Percentage Of Tc/Tac And This Value Is Neither The Estimated Cost Of Project Nor The Actual Amount Of Tc/Tac. The Percentage Of Tc/Tac To Be Quoted By The Bidder Is Not Related, In Any Way, To The Cost Of Construction Of Gct. Cost Ofconstruction Is To Be Borne Completely By The Gcto And Shall Not Be Paid/Reimbursed In Any Form By The Railways To The Gcto. As Part Of Financial Bid (Packet B), Bidders Will Be Required To Quote Only One Figure, Which Is The Percentage In Share Of Terminal Charge And Terminal Access Charge(Tc/Tac), Which They Will Claim From The Railway For All Traffic Handled At The Terminal. Bidders Can Choose To Quote A Positive Number, 0 (Nil), Or Even A Negative Number As Their Percentage Share Quote In The Financial Bid. Eligible Bidder Asking For The Minimum % Share Or Claiming Least Share Of Tc/Tac Will Be Awarded Contract, Where The Quoted % Rates Will Be Evaluated As Follows:- 1.If A Bidder Quotes 100%, It Shall Mean In Effect That Bidder Claims To Be Allocated 100% Of The Tc And Tac Amount And Ir Will Retain Nil Share Of The Ta/Tac. 2.If A Bidder Quotes 1-99% E.G. 10%, It Shall Mean, In Effect, That Bidder Claims To Be Allocated 10% Of The Tc/Tac Amount, As Gcto Share; And Remaining 90% Being Allocated To The Ir. 3.If A Bidder Quotes 0 (Nil)%, It Shall Mean In Effect That Bidder Claims To Be Allocated Nil Share In Tc/Tac Amount, As Gcto Share. 4. If A Bidder Quotes In Negative, E.G. (-)30%, It Means That Entire 100% Of Tc And /Or Tac Will Be Retained By Ir. Over And Above, The Gcto Will Pay An Amount Equivalent To 30% Of Tc And / Or Tac To Ir. 5.Thus, If Five Bids Are Received With Quotes 100%, 30%, 0%, -20% And -40%; In Such Cases, -40% Is The Minimum Bid, And This Bidder Shall Be Awarded The Contract. Bidders May Please Refer To Annexure Xii Of Tender Document For Detailed Instructions For Submitting Financial Offer (Packet B).

AI Tender Summary

OUR REF NO 57236225
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 28-09-2026
Authority
Authority Name Northern Railway
Work Description Tender for Contract For Development Of Gati Shakti Multi-Modal Cargo Terminal (Gct) At Magarwara (Mgw) Station Entirely On Railway Land , - Description: - The Advertised Value Is An Indicative Figure, Just To Emphasize That The Bidding Parameter To Be Filled By The Bidder Is In Terms Of Percentage Of Tc/Tac And This Value Is Neither The Estimated Cost Of Project Nor The Actual Amount Of Tc/Tac. The Percentage Of Tc/Tac To Be Quoted By The Bidder Is Not Related, In Any Way, To The Cost Of Construction Of Gct. Cost Ofconstruction Is To Be Borne Completely By The Gcto And Shall Not Be Paid/Reimbursed In Any Form By The Railways To The Gcto. As Part Of Financial Bid (Packet B), Bidders Will Be Required To Quote Only One Figure, Which Is The Percentage In Share Of Terminal Charge And Terminal Access Charge(Tc/Tac), Which They Will Claim From The Railway For All Traffic Handled At The Terminal. Bidders Can Choose To Quote A Positive Number, 0 (Nil), Or Even A Negative Number As Their Percentage Share Quote In The Financial Bid. Eligible Bidder Asking For The Minimum % Share Or Claiming Least Share Of Tc/Tac Will Be Awarded Contract, Where The Quoted % Rates Will Be Evaluated As Follows:- 1.If A Bidder Quotes 100%, It Shall Mean In Effect That Bidder Claims To Be Allocated 100% Of The Tc And Tac Amount And Ir Will Retain Nil Share Of The Ta/Tac. 2.If A Bidder Quotes 1-99% E.G. 10%, It Shall Mean, In Effect, That Bidder Claims To Be Allocated 10% Of The Tc/Tac Amount, As Gcto Share; And Remaining 90% Being Allocated To The Ir. 3.If A Bidder Quotes 0 (Nil)%, It Shall Mean In Effect That Bidder Claims To Be Allocated Nil Share In Tc/Tac Amount, As Gcto Share. 4. If A Bidder Quotes In Negative, E.G. (-)30%, It Means That Entire 100% Of Tc And /Or Tac Will Be Retained By Ir. Over And Above, The Gcto Will Pay An Amount Equivalent To 30% Of Tc And / Or Tac To Ir. 5.Thus, If Five Bids Are Received With Quotes 100%, 30%, 0%, -20% And -40%; In Such Cases, -40% Is The Minimum Bid, And This Bidder Shall Be Awarded The Contract. Bidders May Please Refer To Annexure Xii Of Tender Document For Detailed Instructions For Submitting Financial Offer (Packet B).
Basic Detail
Tender No LKO_GCTSch2_MGW_MGW2026
Bidding Type Tender
Location
City Lucknow
State Uttar Pradesh
Key Dates
Publish Date 27 Aug 2026
Submission Date 28 Sep 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1.60 Crore
Exemption Not Available
Document List
AnnexureIApprovedGADofGCTatMGW.pdf
AnnexureIIITRDEstimate.pdf
AnnexureIITrackestimate.pdf
AnnexureIVAandIVBSignalEstimate.pdf
AnnexureIXElectronicInmotionweighbridge.pdf
AnnexureVGoodsWharfandDrainage.pdf
AnnexureVIAandVIBApproachRoadalongwithExtensionofRUB.pdf
AnnexureVII-RailwayBuildingComplex.pdf
AnnexureVIIIElectricalEstimate.pdf
AnnexureXIandXIADeclaration.pdf
AnnexureXIIInstructionsforsubmittingFinancialOffer.pdf
AnnexureXIIIRBletterreagrdingLevyofTCTAC_1.pdf
AnnexureXPollutionguidelineRBLetter.pdf
BankMandate-1.pdf
f0f0b373-55af-4626-a504-cce14dd24604.pdf
MGWTenderDocument_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 27, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
pdf

AnnexureIApprovedGADofGCTatMGW.pdf

pdf

AnnexureIIITRDEstimate.pdf

pdf

AnnexureIITrackestimate.pdf

pdf

AnnexureIVAandIVBSignalEstimate.pdf

pdf

AnnexureIXElectronicInmotionweighbridge.pdf

pdf

AnnexureVGoodsWharfandDrainage.pdf

pdf

AnnexureVIAandVIBApproachRoadalongwithExtensionofRUB.pdf

pdf

AnnexureVII-RailwayBuildingComplex.pdf

pdf

AnnexureVIIIElectricalEstimate.pdf

pdf

AnnexureXIandXIADeclaration.pdf

pdf

AnnexureXIIInstructionsforsubmittingFinancialOffer.pdf

pdf

AnnexureXIIIRBletterreagrdingLevyofTCTAC_1.pdf

pdf

AnnexureXPollutionguidelineRBLetter.pdf

pdf

BankMandate-1.pdf

pdf

f0f0b373-55af-4626-a504-cce14dd24604.pdf

pdf

MGWTenderDocument_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders