Defence Government Departments Closing in 20 days TDR #57231494

Bids Are invited for Custom Bid For Services - Ar M Of External Water Electrical Supply, Air Conditioners, Sub-Station, Submersible Motor, Mono-Block Pump, Evaporative Ductable Air Cooler, Electrical Fans Etc. At 28Th Bn Itbp For Fy 2026-27 - 3½ X 70

Issued by Government Departments · Rewari, Haryana
Tender Value
5.30 Lakhs
Estimated cost
Bid Submission
18 Sep 2026
20 days left
EMD
10617
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Rewari → Haryana
EMD Exemption
Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - Ar M Of External Water Electrical Supply, Air Conditioners, Sub-Station, Submersible Motor, Mono-Block Pump, Evaporative Ductable Air Cooler, Electrical Fans Etc. At 28Th Bn Itbp For Fy 2026-27 - 3½ X 70 Sq. Mm , 3½ X 185 Sq. Mm , 3½ X 400 Sq. Mm , Servicing And Commissioning Of 1.5 Tr Window Type Air Conditioner, Including Cleaning Of Air Filters, Condenser And Evaporator Coils, Checking Of Electrical Connections, Tightening Of Terminals, Lubrication Of Blower Motor (If Required), Checking Of Thermostat And Controls, Testing Of Cooling Performance, Minor Adjustments, And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Servicing And Commissioning Of 1.5 Tr Wall Mounted Split Type Air Conditioner, Including Cleaning Of Indoor And Outdoor Units, Air Filters, Condenser And Evaporator Coils, Checking Of Refrigerant Line And Insulation, Tightening Of Electrical Connections, Checking Of Thermostat, Controls And Drain Line, Testing Of Cooling Performance, Minor Adjustments, And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Servicing And Commissioning Of 2.0 Tr Split/Cassette Type Air Conditioner, Including Cleaning Of Indoor And Outdoor Units, Air Filters, Condenser And Evaporator Coils, Checking Of Refrigerant Lines And Insulation, Tightening Of Electrical Connections, Checking Of Thermostat, Controls And Drain Line, Testing Of Cooling Performance, Minor Adjustments, And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Filling Of Refrigerant Gas R-22/32 In Air Conditioner Units, Including Leak Detection, Minor Leak Rectification (If Required), Vacuuming, Charging Of Gas Up To Required Pressure, Testing Of Cooling Performance And All Labour, Tools & Tackles Complete As Per Direction Of Engineer-In-Charge. , Providing And Fixing Of 50 Mfd Capacitor Suitable For 1.5 Tr & 2.0 Tr Window/Split Type Air Conditioner Units, Including Dismantling Of Defective Capacitor, Supplying And Fixing New Capacitor Of Approved Make, Proper Jointing And Insulating Of Connections, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Servicing Of Rewinding Of Outdoor Unit Fan Motor (Blower/ Condenser Fan Motor) Of 1.5 Tr & 2.0 Tr Capacity Window/Split Type Air Conditioners, Including Dismantling, Rewinding With Super Enamelled Copper Wire Of Appropriate Gauge, Insulation, Varnishing, Reassembling, Testing, And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, And Cost Of New Enamelled Copper Wire. The Salvage/Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Providing And Servicing Of Rewinding Of Indoor Unit Fan Motor (Blower Motor) Of 1.5 Tr & 2.0 Tr Capacity Split Type Air Conditioners, Including Dismantling, Rewinding With Super Enamelled Copper Wire Of Appropriate Gauge, Insulation, Varnishing, Reassembling, Testing, And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, And Cost Of New Super Enamelled Copper Wire. The Salvage/ Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Providing And Fixing Of Printed Circuit Board (Pcb) Suitable For 1.5 Tr Split/ Window Type Air Conditioner, Including Dismantling Of Defective Pcb, Supplying And Fixing New Pcb Of Acceptable Make, Proper Connection Of Wiring, Programming/Configuration (If Required), Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Fixing Of Printed Circuit Board (Pcb) Suitable For 2.0 Tr Split Type Air Conditioner, Including Dismantling Of Defective Pcb, Supplying And Fixing New Pcb Of Compatible Make, Proper Connection Of Wiring, Programming/Configuration (If Required), Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Fixing Aluminium Protection Jali For Outdoor Unit Of 1.5 Tr / 2.0 Tr Window/Split Type Air Conditioner, Including Fabrication Of Aluminium Mesh With Suitable Frame, Cutting, Bending, Fixing With Screws/Cl S, Proper Alignment, And Ensuring Adequate Ventilation, Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Replacement Of Compressor For 1.5 Tr Split/Window Type Air Conditioner, Including Dismantling Of Defective Compressor, Supplying And Fixing New Compressor Of Approved Make And Suitable Capacity, Replacement Of Necessary Components Such As Filter Drier, Charging Of Refrigerant Gas, Brazing Of Joints, Leak Testing, Vacuuming, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Replacement Of Compressor For 2.0 Tr Split Type Air Conditioner, Including Dismantling Of Defective Compressor, Supplying And Fixing New Compressor Of Approved Make And Suitable Capacity, Replacement Of Filter Drier, Brazing Of Joints, Vacuuming, Charging Of Refrigerant Gas, Leak Testing, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Fixing Of Pvc Fan Blade In Outdoor Unit Of Window/Split Type Air Conditioner Units, Including Dismantling Of Damaged Blade, Supplying And Fixing New Pvc Fan Blade Of Suitable Size And Make, Proper Alignment, Tightening, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Fixing Of Room Temperature Sensor With Coil Casing In Split/Window Type Air Conditioner Units, Including Dismantling Of Defective Sensor, Supplying And Fixing New Sensor Of Compatible Make, Proper Connection, Placement In Coil Area, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Repair Of Swing System Of Indoor Unit Of Split Type Air Conditioners, Including Repair/ Replacement Of Swing Motor, Swing Fins (Louvers), Locks, Linkages And Other Associated Components, Dismantling, Refixing, Alignment, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Rewinding, Maintenance And Servicing Of 10 Hp Submersible/Monoblock Pump Set, Including Dismantling, Rewinding Of Stator With Super Enamelled Copper Wire Of Appropriate Gauge, Insulation, Varnishing, Reassembling, Replacement Of Minor Worn-Out Parts (Bushes, Seals, Gaskets If Required), Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables, And Cost Of New Super Enamelled Copper Wire. The Salvage/Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Rewinding, Maintenance And Servicing Of 7.5 Hp Monoblock/Submersible Motor, Including Dismantling, Rewinding Of Stator With Super Enamelled Copper Wire Of Suitable Gauge, Insulation, Varnishing, Reassembling, Replacement Of Minor Worn-Out Parts (Bearings, Bushes, Seals, Gaskets If Required), Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables, And Cost Of New Super Enamelled Copper Wire. The Salvage/Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Rewinding, Maintenance And Servicing Of 3 Hp Monoblock Motor, Including Dismantling, Rewinding Of Stator With Super Enamelled Copper Wire Of Suitable Gauge, Insulation, Varnishing, Reassembling, Replacement Of Minor Worn-Out Parts (Bearings, Bushes, Seals, Gaskets If Required), Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables, And Cost Of New Super Enamelled Copper Wire. The Salvage/Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Rewinding Of 2 Hp, 3-Phase Motor Of Industrial Evaporative Ductable Air Cooler, Including Dismantling, Rewinding With Super Enamelled Copper Wire Of Suitable Gauge, Insulation, Varnishing, Reassembling, And Servicing Of Complete Air Cooler Including Cleaning Of Cooling Pads, Checking Of Pump, Fan/Blower, Belt (If Any), Bearings, Electrical Connections, Lubrication, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables, And Cost Of New Super Enamelled Copper Wire. The Salvage/ Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Rewinding Of Motor Of Electrical Ceiling Fan, Including Dismantling Of Fan Motor, Cleaning, Rewinding Of Stator Winding With New Super Enamelled Copper Wire Of Appropriate Gauge, Insulation Treatment, Varnishing And Oven Drying As Required, Reassembling, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables And Cost Of New Super Enamelled Copper Wire. The Salvage/Buyback Value Of The Burnt/Old Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Providing And Fixing Of 3.0 To 3.25 Mfd Capacitor In Ceiling/Exhaust/Wall Fan, Including Dismantling Of Defective Capacitor, Supplying And Fixing New Capacitor Of Approved Make, Proper Jointing And Insulating Of Connections, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, And Cost Of New Capacitor Of Approved Make. The Salvage/Buyback Value Of The Old/Burnt/Unserviceable Capacitor Recovered During Replacement Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Locating And Identifying Fault In Underground Armoured Power Cable Using Suitable Cable Fault Locating Equipment (Cable Route Tracer, Surge Generator / Thumper And Acoustic Pin-Pointing Detector), Including Mobilisation Of Equipment And Operator To Site, Pre-Location Of Fault Zone, Tracing Of Exact Fault Position Along Cable Route, Pin-Pointing And Marking On Ground For Excavation, De-Mobilisation Of Equipment On Completion Complete In All Respects As Per Direction Of Engineer-In-Charge. Excavation / Earthwork, Cutting And Removal Of Damaged Cable Portion, And Cable Jointing Shall Be Measured And Paid Separately. , Locating And Identifying Additional Fault In Underground Armoured Power Cable During The Same Mobilisation / Visit, Cable Fault Locating Equipment Already Deployed At Site (Cable Route Tracer, Surge Generator / Thumper And Acoustic Pin-Pointing Detector), Including Pre-Location Of Fault Zone, Tracing Of Exact Fault Position Along Cable Route, Pin-Pointing And Marking On Ground For Excavation, Complete In All Respects As Per Direction Of Engineer-In-Charge. Excavation / Earthwork, Cutting And Removal Of Damaged Cable Portion, And Cable Jointing Shall Be Measured And Paid Separately. , Dehydration And Filtration Of Transformer Oil Of 500 Kva Transformer Using High Vacuum Oil Filtration Plant, Including Heating, Removal Of Moisture, Sludge And Impurities, Improvement Of Dielectric Strength (Bdv), Testing Before And After Filtration, And Making The Transformer Oil Suitable For Operation, Complete In All Respects As Per Direction Of Engineer-In-Charge. , Providing And Fixing Of Silica Gel Breather (Filter/Cap) Complete With Silica Gel Crystals For 500 Kva Transformer, Including Dismantling Of Old/Damaged Breather, Supplying And Fixing New Breather Assembly, Filling Of Fresh Silica Gel, Cleaning/Replacement Of Oil Cup, Proper Sealing, Checking Of Air Passage, And Testing Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Servicing And Repairing Of Vacuum Circuit Breaker (Vcb) Panel Associated With 500 Kva Transformer, Including Cleaning Of Insulators And Contacts, Checking And Tightening Of All Electrical Connections, Servicing Of Operating Mechanism, Lubrication Of Moving Parts, Checking Of Vacuum Interrupter Condition, Testing Of Control Circuit, Replacement Of Minor Worn-Out Parts (Springs, Coils, Auxiliary Contacts If Required), And Testing & Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Servicing Of Air Circuit Breaker (Acb) Installed In Lt Panel Associated With Transformer, Including Cleaning Of Contacts And Arc Chutes, Checking And Tightening Of All Electrical Connections, Servicing Of Operating Mechanism, Lubrication Of Moving Parts, Checking Of Trip Unit And Control Circuit, And Testing & Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Servicing, Checking, Calibration And Repair Of Apfc (Automatic Power Factor Correction) Panel Including Cleaning Of Contacts, Checking Of Relay, Contactors, Capacitor Banks Etc. Complete. , Providing And Laying Insulating Rubber Mat Of Suitable Thickness (As Per Voltage Level, Is:15652) In Substation / Lt Panel Room, Having Anti-Skid Surface, Including Cutting To Size, Placing In Position And Ensuring Proper Insulation Safety Complete As Required. , Replacement Of Heavy Duty Durable Honeycomb Pad Cooling Media, 100 Mm Thick, For Evaporative Ductable Cooler, Including Dismantling And Removal Of Existing Unserviceable Cooling Media, Supplying, Fitting, Fixing And Commissioning Of New Honeycomb Cooling Pads Complete In All Respects, As Approved By The Engineer-In-Charge. Including Disposal Of Unserviceable Material Outside The Premises As Directed, For One Complete Cooler. , Replacement Of Defective Water Circulation Pump In Evaporative Ductable Air Cooler With New Approved Quality Pump Of Suitable Capacity, Including Removal Of Old Pump, Connection To Existing Electrical And Water Circulation System, Testing And Commissioning Complete (With Buyback Option) In All Respects To The Satisfaction Of The Engineer-In-Charge. , Replacement Of Bearing And Repair Of Shaft Of Electrical Ceiling Fan, Including Dismantling Of Fan Motor Assembly, Removing Defective/Worn Bearing(S), Cleaning Of Bearing Housing, Pressing/ Fitting New Ball Bearing(S) Of Suitable Size And Make, Straightening Or Replacement Of Shaft If Required, Replacement Of Seals If Found Defective, Greasing, Reassembling, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables, New Ball Bearing(S), Grease And Seals As Required. , Repair And Servicing Of Gearbox Of 11 Kv Vcb Of Crompton Make Including Greasing And Rectification Of Alignment, Repair Of Ratchet (Garari) Etc. As Per Direction Of Engineer In Charge. , Providing And Installation Of Vcb Dc Power Pack Unit 220V To 110V Dc (With Buyback Option) As Per Direction Of Engineer In Charge. , Providing & Installation Of Current Relay Cgi 14C (With Buyback Option) As Per Direction Of Engineer In Charge. , Servicing Of Oltc Type 500 Kva Transformers Including Oil Dehydration And Filtration As Per Direction Of Engineer In Charge. , Providing And Filling Transformer Oil Or Insulating Oil During Dehydration Process In Existing 500 Kva Transformer Including All Charges. , Providing And Installation Of Suitable Digital/Analog Ere Meter Of Reputed Make (Ae Or Equivalent), Flush Mounting Type, Suitable For Measurement Of Ac Current In The Lt Panel, Complete With Necessary Ct Connection, Selector Switch, Auxiliary Wiring, Terminals, Mounting Accessories And All Other Required Accessories, Including Testing And Commissioning, Complete In All Respects (With Buyback Option) As Required And To The Satisfaction Of The Engineer-In-Charge. , Providing And Installation Of Suitable Digital/Analog Voltage Meter Of Reputed Make (Ae Or Equivalent), Flush Mounting Type, Suitable For Measurement Of Ac Voltage In The Lt Panel, Complete With Necessary Selector Switch, Auxiliary Wiring, Terminals, Mounting Accessories And All Other Required Accessories, Including Testing And Commissioning, Complete In All Respects (With Buyback Option) As Required And To The Satisfaction Of The Engineer-In-Charge. , Providing And Installation Of Led Type Phase Indicator Lights Of Suitable Voltage Rating, Reputed Make, Complete With Suitable Mounting Arrangement, Indicating The Availability Of R-Phase (Red), Y-Phase (Yellow) And B-Phase (Blue) Supply, Including Necessary Wiring, Terminals, Connectors And All Other Accessories Required For Proper Operation, Testing And Commissioning, Complete In All Respects (With Buyback Option) As Required And To The Satisfaction Of The Engineer-In-Charge. (R-Phase - 15 Nos , Y-Phase - 05 Nos And B-Phase - 05 Nos).

BOQ

Sl. No. Item TitleItem Description
13½ X 70 sq. mm3½ X 70 sq. mm
23½ X 185 sq. mm3½ X 185 sq. mm
33½ X 400 sq. mm3½ X 400 sq. mm
4Servicing and commissioning of 1.5 TR window type air conditioner, including cleaning of air filters, condenser and evaporator coils, checking of electrical connections, tightening of terminals, lubrication of blower motor (if required), checking of thermostat and controls, testing of cooling performance, minor adjustments, and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Servicing and commissioning of 1.5 TR window type air conditioner, including cleaning of air filters, condenser and evaporator coils, checking of electrical connections, tightening of terminals, lubrication of blower motor (if required), checking of thermostat and controls, testing of cooling performance, minor adjustments, and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
5Servicing and commissioning of 1.5 TR wall mounted split type air conditioner, including cleaning of indoor and outdoor units, air filters, condenser and evaporator coils, checking of refrigerant line and insulation, tightening of electrical connections, checking of thermostat, controls and drain line, testing of cooling performance, minor adjustments, and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Servicing and commissioning of 1.5 TR wall mounted split type air conditioner, including cleaning of indoor and outdoor units, air filters, condenser and evaporator coils, checking of refrigerant line and insulation, tightening of electrical connections, checking of thermostat, controls and drain line, testing of cooling performance, minor adjustments, and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
6Servicing and commissioning of 2.0 TR Split/Cassette type air conditioner, including cleaning of indoor and outdoor units, air filters, condenser and evaporator coils, checking of refrigerant lines and insulation, tightening of electrical connections, checking of thermostat, controls and drain line, testing of cooling performance, minor adjustments, and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Servicing and commissioning of 2.0 TR Split/Cassette type air conditioner, including cleaning of indoor and outdoor units, air filters, condenser and evaporator coils, checking of refrigerant lines and insulation, tightening of electrical connections, checking of thermostat, controls and drain line, testing of cooling performance, minor adjustments, and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
7Providing and filling of refrigerant gas R-22/32 in air conditioner units, including leak detection, minor leak rectification (if required), vacuuming, charging of gas up to required pressure, testing of cooling performance and all labour, tools & tackles complete as per direction of Engineer-in-Charge.Providing and filling of refrigerant gas R-22/32 in air conditioner units, including leak detection, minor leak rectification (if required), vacuuming, charging of gas up to required pressure, testing of cooling performance and all labour, tools & tackles complete as per direction of Engineer-in-Charge.
8Providing and fixing of 50 MFD capacitor suitable for 1.5 TR & 2.0 TR Window/Split type air conditioner units, including dismantling of defective capacitor, supplying and fixing new capacitor of approved make, proper jointing and insulating of connections, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Providing and fixing of 50 MFD capacitor suitable for 1.5 TR & 2.0 TR Window/Split type air conditioner units, including dismantling of defective capacitor, supplying and fixing new capacitor of approved make, proper jointing and insulating of connections, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
9Providing and servicing of rewinding of outdoor unit fan motor (blower/ condenser fan motor) of 1.5 TR & 2.0 TR capacity Window/Split type air conditioners, including dismantling, rewinding with super enamelled copper wire of appropriate gauge, insulation, varnishing, reassembling, testing, and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, and cost of new enamelled copper wire. The salvage/buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.Providing and servicing of rewinding of outdoor unit fan motor (blower/ condenser fan motor) of 1.5 TR & 2.0 TR capacity Window/Split type air conditioners, including dismantling, rewinding with super enamelled copper wire of appropriate gauge, insulation, varnishing, reassembling, testing, and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, and cost of new enamelled copper wire. The salvage/buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.
10Providing and servicing of rewinding of indoor unit fan motor (blower motor) of 1.5 TR & 2.0 TR capacity Split type air conditioners, including dismantling, rewinding with super enamelled copper wire of appropriate gauge, insulation, varnishing, reassembling, testing, and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, and cost of new super enamelled copper wire. The salvage/ buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.Providing and servicing of rewinding of indoor unit fan motor (blower motor) of 1.5 TR & 2.0 TR capacity Split type air conditioners, including dismantling, rewinding with super enamelled copper wire of appropriate gauge, insulation, varnishing, reassembling, testing, and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, and cost of new super enamelled copper wire. The salvage/ buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.
11Providing and fixing of Printed Circuit Board (PCB) suitable for 1.5 TR Split/ Window type air conditioner, including dismantling of defective PCB, supplying and fixing new PCB of acceptable make, proper connection of wiring, programming/configuration (if required), testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Providing and fixing of Printed Circuit Board (PCB) suitable for 1.5 TR Split/ Window type air conditioner, including dismantling of defective PCB, supplying and fixing new PCB of acceptable make, proper connection of wiring, programming/configuration (if required), testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
12Providing and fixing of Printed Circuit Board (PCB) suitable for 2.0 TR split type air conditioner, including dismantling of defective PCB, supplying and fixing new PCB of compatible make, proper connection of wiring, programming/configuration (if required), testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Providing and fixing of Printed Circuit Board (PCB) suitable for 2.0 TR split type air conditioner, including dismantling of defective PCB, supplying and fixing new PCB of compatible make, proper connection of wiring, programming/configuration (if required), testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
13Providing and fixing aluminium protection jali for outdoor unit of 1.5 TR / 2.0 TR window/split type air conditioner, including fabrication of aluminium mesh with suitable frame, cutting, bending, fixing with screws/clamps, proper alignment, and ensuring adequate ventilation, complete in all respects, to the satisfaction of Engineer-in-Charge.Providing and fixing aluminium protection jali for outdoor unit of 1.5 TR / 2.0 TR window/split type air conditioner, including fabrication of aluminium mesh with suitable frame, cutting, bending, fixing with screws/clamps, proper alignment, and ensuring adequate ventilation, complete in all respects, to the satisfaction of Engineer-in-Charge.
14Providing and replacement of compressor for 1.5 TR Split/Window type air conditioner, including dismantling of defective compressor, supplying and fixing new compressor of approved make and suitable capacity, replacement of necessary components such as filter drier, charging of refrigerant gas, brazing of joints, leak testing, vacuuming, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Providing and replacement of compressor for 1.5 TR Split/Window type air conditioner, including dismantling of defective compressor, supplying and fixing new compressor of approved make and suitable capacity, replacement of necessary components such as filter drier, charging of refrigerant gas, brazing of joints, leak testing, vacuuming, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
15Providing and replacement of compressor for 2.0 TR split type air conditioner, including dismantling of defective compressor, supplying and fixing new compressor of approved make and suitable capacity, replacement of filter drier, brazing of joints, vacuuming, charging of refrigerant gas, leak testing, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Providing and replacement of compressor for 2.0 TR split type air conditioner, including dismantling of defective compressor, supplying and fixing new compressor of approved make and suitable capacity, replacement of filter drier, brazing of joints, vacuuming, charging of refrigerant gas, leak testing, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
16Providing and fixing of PVC fan blade in outdoor unit of Window/Split type air conditioner units, including dismantling of damaged blade, supplying and fixing new PVC fan blade of suitable size and make, proper alignment, tightening, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Providing and fixing of PVC fan blade in outdoor unit of Window/Split type air conditioner units, including dismantling of damaged blade, supplying and fixing new PVC fan blade of suitable size and make, proper alignment, tightening, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
17Providing and fixing of room temperature sensor with coil casing in Split/Window type air conditioner units, including dismantling of defective sensor, supplying and fixing new sensor of compatible make, proper connection, placement in coil area, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Providing and fixing of room temperature sensor with coil casing in Split/Window type air conditioner units, including dismantling of defective sensor, supplying and fixing new sensor of compatible make, proper connection, placement in coil area, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
18Repair of swing system of indoor unit of split type air conditioners, including repair/ replacement of swing motor, swing fins (louvers), locks, linkages and other associated components, dismantling, refixing, alignment, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.Repair of swing system of indoor unit of split type air conditioners, including repair/ replacement of swing motor, swing fins (louvers), locks, linkages and other associated components, dismantling, refixing, alignment, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.
19Rewinding, maintenance and servicing of 10 HP submersible/Monoblock pump set, including dismantling, rewinding of stator with super enamelled copper wire of appropriate gauge, insulation, varnishing, reassembling, replacement of minor worn-out parts (bushes, seals, gaskets if required), testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables, and cost of new super enamelled copper wire. The salvage/buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.Rewinding, maintenance and servicing of 10 HP submersible/Monoblock pump set, including dismantling, rewinding of stator with super enamelled copper wire of appropriate gauge, insulation, varnishing, reassembling, replacement of minor worn-out parts (bushes, seals, gaskets if required), testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables, and cost of new super enamelled copper wire. The salvage/buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.
20Rewinding, maintenance and servicing of 7.5 HP monoblock/Submersible motor, including dismantling, rewinding of stator with super enamelled copper wire of suitable gauge, insulation, varnishing, reassembling, replacement of minor worn-out parts (bearings, bushes, seals, gaskets if required), testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables, and cost of new super enamelled copper wire. The salvage/buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.Rewinding, maintenance and servicing of 7.5 HP monoblock/Submersible motor, including dismantling, rewinding of stator with super enamelled copper wire of suitable gauge, insulation, varnishing, reassembling, replacement of minor worn-out parts (bearings, bushes, seals, gaskets if required), testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables, and cost of new super enamelled copper wire. The salvage/buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.
21Rewinding, maintenance and servicing of 3 HP monoblock motor, including dismantling, rewinding of stator with super enamelled copper wire of suitable gauge, insulation, varnishing, reassembling, replacement of minor worn-out parts (bearings, bushes, seals, gaskets if required), testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables, and cost of new super enamelled copper wire. The salvage/buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.Rewinding, maintenance and servicing of 3 HP monoblock motor, including dismantling, rewinding of stator with super enamelled copper wire of suitable gauge, insulation, varnishing, reassembling, replacement of minor worn-out parts (bearings, bushes, seals, gaskets if required), testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables, and cost of new super enamelled copper wire. The salvage/buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.
22Rewinding of 2 HP, 3-phase motor of industrial evaporative ductable air cooler, including dismantling, rewinding with super enamelled copper wire of suitable gauge, insulation, varnishing, reassembling, and servicing of complete air cooler including cleaning of cooling pads, checking of pump, fan/blower, belt (if any), bearings, electrical connections, lubrication, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables, and cost of new super enamelled copper wire. The salvage/ buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.Rewinding of 2 HP, 3-phase motor of industrial evaporative ductable air cooler, including dismantling, rewinding with super enamelled copper wire of suitable gauge, insulation, varnishing, reassembling, and servicing of complete air cooler including cleaning of cooling pads, checking of pump, fan/blower, belt (if any), bearings, electrical connections, lubrication, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables, and cost of new super enamelled copper wire. The salvage/ buyback value of the burnt copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.
23Rewinding of motor of electrical ceiling fan, including dismantling of fan motor, cleaning, rewinding of stator winding with new super enamelled copper wire of appropriate gauge, insulation treatment, varnishing and oven drying as required, reassembling, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables and cost of new super enamelled copper wire. The salvage/buyback value of the burnt/old copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.Rewinding of motor of electrical ceiling fan, including dismantling of fan motor, cleaning, rewinding of stator winding with new super enamelled copper wire of appropriate gauge, insulation treatment, varnishing and oven drying as required, reassembling, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables and cost of new super enamelled copper wire. The salvage/buyback value of the burnt/old copper wire recovered during rewinding shall be adjusted and the net rate quoted shall be after deducting such buyback value.
24Providing and fixing of 3.0 to 3.25 MFD capacitor in ceiling/exhaust/wall fan, including dismantling of defective capacitor, supplying and fixing new capacitor of approved make, proper jointing and insulating of connections, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, and cost of new capacitor of approved make. The salvage/buyback value of the old/burnt/unserviceable capacitor recovered during replacement shall be adjusted and the net rate quoted shall be after deducting such buyback value.Providing and fixing of 3.0 to 3.25 MFD capacitor in ceiling/exhaust/wall fan, including dismantling of defective capacitor, supplying and fixing new capacitor of approved make, proper jointing and insulating of connections, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, and cost of new capacitor of approved make. The salvage/buyback value of the old/burnt/unserviceable capacitor recovered during replacement shall be adjusted and the net rate quoted shall be after deducting such buyback value.
25Locating and identifying fault in underground armoured power cable using suitable cable fault locating equipment (cable route tracer, surge generator / thumper and acoustic pin-pointing detector), including mobilisation of equipment and operator to site, pre-location of fault zone, tracing of exact fault position along cable route, pin-pointing and marking on ground for excavation, de-mobilisation of equipment on completion complete in all respects as per direction of Engineer-in-Charge. Excavation / earthwork, cutting and removal of damaged cable portion, and cable jointing shall be measured and paid separately.Locating and identifying fault in underground armoured power cable using suitable cable fault locating equipment (cable route tracer, surge generator / thumper and acoustic pin-pointing detector), including mobilisation of equipment and operator to site, pre-location of fault zone, tracing of exact fault position along cable route, pin-pointing and marking on ground for excavation, de-mobilisation of equipment on completion complete in all respects as per direction of Engineer-in-Charge. Excavation / earthwork, cutting and removal of damaged cable portion, and cable jointing shall be measured and paid separately.
26Locating and identifying additional fault in underground armoured power cable during the same mobilisation / visit, cable fault locating equipment already deployed at site (cable route tracer, surge generator / thumper and acoustic pin-pointing detector), including pre-location of fault zone, tracing of exact fault position along cable route, pin-pointing and marking on ground for excavation, complete in all respects as per direction of Engineer-in-Charge. Excavation / earthwork, cutting and removal of damaged cable portion, and cable jointing shall be measured and paid separately.Locating and identifying additional fault in underground armoured power cable during the same mobilisation / visit, cable fault locating equipment already deployed at site (cable route tracer, surge generator / thumper and acoustic pin-pointing detector), including pre-location of fault zone, tracing of exact fault position along cable route, pin-pointing and marking on ground for excavation, complete in all respects as per direction of Engineer-in-Charge. Excavation / earthwork, cutting and removal of damaged cable portion, and cable jointing shall be measured and paid separately.
27\\"Dehydration and filtration of transformer oil of 500 kVA transformer using high vacuum oil filtration plant, including heating, removal of moisture, sludge and impurities, improvement of dielectric strength (BDV), testing before and after filtration, and making the transformer oil suitable for operation, complete in all respects as per direction of Engineer-in-Charge.\\"\\"Dehydration and filtration of transformer oil of 500 kVA transformer using high vacuum oil filtration plant, including heating, removal of moisture, sludge and impurities, improvement of dielectric strength (BDV), testing before and after filtration, and making the transformer oil suitable for operation, complete in all respects as per direction of Engineer-in-Charge.\\"
28\\"Providing and fixing of silica gel breather (filter/cap) complete with silica gel crystals for 500 kVA transformer, including dismantling of old/damaged breather, supplying and fixing new breather assembly, filling of fresh silica gel, cleaning/replacement of oil cup, proper sealing, checking of air passage, and testing complete in all respects, to the satisfaction of Engineer-in-Charge.\\"\\"Providing and fixing of silica gel breather (filter/cap) complete with silica gel crystals for 500 kVA transformer, including dismantling of old/damaged breather, supplying and fixing new breather assembly, filling of fresh silica gel, cleaning/replacement of oil cup, proper sealing, checking of air passage, and testing complete in all respects, to the satisfaction of Engineer-in-Charge.\\"
29\\"Servicing and repairing of Vacuum Circuit Breaker (VCB) panel associated with 500 kVA transformer, including cleaning of insulators and contacts, checking and tightening of all electrical connections, servicing of operating mechanism, lubrication of moving parts, checking of vacuum interrupter condition, testing of control circuit, replacement of minor worn-out parts (springs, coils, auxiliary contacts if required), and testing & commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.\\"\\"Servicing and repairing of Vacuum Circuit Breaker (VCB) panel associated with 500 kVA transformer, including cleaning of insulators and contacts, checking and tightening of all electrical connections, servicing of operating mechanism, lubrication of moving parts, checking of vacuum interrupter condition, testing of control circuit, replacement of minor worn-out parts (springs, coils, auxiliary contacts if required), and testing & commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.\\"
30\\"Servicing of Air Circuit Breaker (ACB) installed in LT panel associated with transformer, including cleaning of contacts and arc chutes, checking and tightening of all electrical connections, servicing of operating mechanism, lubrication of moving parts, checking of trip unit and control circuit, and testing & commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.\\"\\"Servicing of Air Circuit Breaker (ACB) installed in LT panel associated with transformer, including cleaning of contacts and arc chutes, checking and tightening of all electrical connections, servicing of operating mechanism, lubrication of moving parts, checking of trip unit and control circuit, and testing & commissioning complete in all respects, to the satisfaction of Engineer-in-Charge.\\"
31\\"Servicing, checking, calibration and repair of APFC (Automatic Power Factor Correction) panel including cleaning of contacts, checking of relay, contactors, capacitor banks etc. complete.\\"Servicing, checking, calibration and repair of APFC (Automatic Power Factor Correction) panel including cleaning of contacts, checking of relay, contactors, capacitor banks etc. complete.
32\\"Providing and laying insulating rubber mat of suitable thickness (as per voltage level, IS:15652) in substation / LT panel room, having anti-skid surface, including cutting to size, placing in position and ensuring proper insulation safety complete as required.\\"\\"Providing and laying insulating rubber mat of suitable thickness (as per voltage level, IS:15652) in substation / LT panel room, having anti-skid surface, including cutting to size, placing in position and ensuring proper insulation safety complete as required.\\"
33\\"Replacement of heavy duty durable honeycomb pad cooling media, 100 mm thick, for evaporative ductable cooler, including dismantling and removal of existing unserviceable cooling media, supplying, fitting, fixing and commissioning of new honeycomb cooling pads complete in all respects, as approved by the Engineer-in-Charge. Including disposal of unserviceable material outside the premises as directed, for one complete cooler.\\"\\"Replacement of heavy duty durable honeycomb pad cooling media, 100 mm thick, for evaporative ductable cooler, including dismantling and removal of existing unserviceable cooling media, supplying, fitting, fixing and commissioning of new honeycomb cooling pads complete in all respects, as approved by the Engineer-in-Charge. Including disposal of unserviceable material outside the premises as directed, for one complete cooler.\\"
34\\"Replacement of defective water circulation pump in evaporative ductable air cooler with new approved quality pump of suitable capacity, including removal of old pump, connection to existing electrical and water circulation system, testing and commissioning complete (with buyback option) in all respects to the satisfaction of the Engineer-in-Charge.\\"\\"Replacement of defective water circulation pump in evaporative ductable air cooler with new approved quality pump of suitable capacity, including removal of old pump, connection to existing electrical and water circulation system, testing and commissioning complete (with buyback option) in all respects to the satisfaction of the Engineer-in-Charge.\\"
35Replacement of bearing and repair of shaft of electrical ceiling fan, including dismantling of fan motor assembly, removing defective/worn bearing(s), cleaning of bearing housing, pressing/ fitting new ball bearing(s) of suitable size and make, straightening or replacement of shaft if required, replacement of seals if found defective, greasing, reassembling, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables, new ball bearing(s), grease and seals as required.Replacement of bearing and repair of shaft of electrical ceiling fan, including dismantling of fan motor assembly, removing defective/worn bearing(s), cleaning of bearing housing, pressing/ fitting new ball bearing(s) of suitable size and make, straightening or replacement of shaft if required, replacement of seals if found defective, greasing, reassembling, testing and commissioning complete in all respects, to the satisfaction of Engineer-in-Charge. The rate includes cost of labour, tools & tackles, consumables, new ball bearing(s), grease and seals as required.
36Repair and servicing of Gearbox of 11 kV VCB of CROMPTON Make including Greasing and rectification of alignment, repair of ratchet (Garari) etc. as per direction of engineer in charge.Repair and servicing of Gearbox of 11 kV VCB of CROMPTON Make including Greasing and rectification of alignment, repair of ratchet (Garari) etc. as per direction of engineer in charge.
37Providing and installation of VCB DC Power Pack Unit 220V to 110V DC (with buyback option) as per direction of engineer in charge.Providing and installation of VCB DC Power Pack Unit 220V to 110V DC (with buyback option) as per direction of engineer in charge.
38Providing & installation of Current Relay CGI 14c (with buyback option) as per direction of engineer in charge.Providing & installation of Current Relay CGI 14c (with buyback option) as per direction of engineer in charge.
39Servicing of OLTC Type 500 KVA Transformers including oil dehydration and filtration as per direction of engineer in charge.Servicing of OLTC Type 500 KVA Transformers including oil dehydration and filtration as per direction of engineer in charge.
40Providing and filling Transformer oil or insulating oil during dehydration process in existing 500 kva transformer including all charges.Providing and filling Transformer oil or insulating oil during dehydration process in existing 500 kva transformer including all charges.
41Providing and installation of suitable digital/analog Ampere Meter of reputed make (AE or equivalent), flush mounting type, suitable for measurement of AC current in the LT panel, complete with necessary CT connection, selector switch, auxiliary wiring, terminals, mounting accessories and all other required accessories, including testing and commissioning, complete in all respects (with buyback option) as required and to the satisfaction of the Engineer-in-Charge.Providing and installation of suitable digital/analog Ampere Meter of reputed make (AE or equivalent), flush mounting type, suitable for measurement of AC current in the LT panel, complete with necessary CT connection, selector switch, auxiliary wiring, terminals, mounting accessories and all other required accessories, including testing and commissioning, complete in all respects (with buyback option) as required and to the satisfaction of the Engineer-in-Charge.
42Providing and installation of suitable digital/analog Voltage Meter of reputed make (AE or equivalent), flush mounting type, suitable for measurement of AC voltage in the LT panel, complete with necessary selector switch, auxiliary wiring, terminals, mounting accessories and all other required accessories, including testing and commissioning, complete in all respects (with buyback option) as required and to the satisfaction of the Engineer-in-Charge.Providing and installation of suitable digital/analog Voltage Meter of reputed make (AE or equivalent), flush mounting type, suitable for measurement of AC voltage in the LT panel, complete with necessary selector switch, auxiliary wiring, terminals, mounting accessories and all other required accessories, including testing and commissioning, complete in all respects (with buyback option) as required and to the satisfaction of the Engineer-in-Charge.
43Providing and installation of LED type Phase Indicator Lights of suitable voltage rating, reputed make, complete with suitable mounting arrangement, indicating the availability of R-Phase (Red), Y-Phase (Yellow) and B-Phase (Blue) supply, including necessary wiring, terminals, connectors and all other accessories required for proper operation, testing and commissioning, complete in all respects (with buyback option) as required and to the satisfaction of the Engineer-in-Charge. (R-Phase - 15 Nos , Y-Phase - 05 Nos and B-Phase - 05 Nos).Providing and installation of LED type Phase Indicator Lights of suitable voltage rating, reputed make, complete with suitable mounting arrangement, indicating the availability of R-Phase (Red), Y-Phase (Yellow) and B-Phase (Blue) supply, including necessary wiring, terminals, connectors and all other accessories required for proper operation, testing and commissioning, complete in all respects (with buyback option) as required and to the satisfaction of the Engineer-in-Charge. (R-Phase - 15 Nos , Y-Phase - 05 Nos and B-Phase - 05 Nos).

AI Tender Summary

OUR REF NO 57231494
AUTHORITY Government Departments
TENDER VALUE 5.30 Lakhs
LAST DATE 18-09-2026
Authority
Authority Name Indo Tibetan Border Police
Work Description Bids Are invited for Custom Bid For Services - Ar M Of External Water Electrical Supply, Air Conditioners, Sub-Station, Submersible Motor, Mono-Block Pump, Evaporative Ductable Air Cooler, Electrical Fans Etc. At 28Th Bn Itbp For Fy 2026-27 - 3½ X 70 Sq. Mm , 3½ X 185 Sq. Mm , 3½ X 400 Sq. Mm , Servicing And Commissioning Of 1.5 Tr Window Type Air Conditioner, Including Cleaning Of Air Filters, Condenser And Evaporator Coils, Checking Of Electrical Connections, Tightening Of Terminals, Lubrication Of Blower Motor (If Required), Checking Of Thermostat And Controls, Testing Of Cooling Performance, Minor Adjustments, And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Servicing And Commissioning Of 1.5 Tr Wall Mounted Split Type Air Conditioner, Including Cleaning Of Indoor And Outdoor Units, Air Filters, Condenser And Evaporator Coils, Checking Of Refrigerant Line And Insulation, Tightening Of Electrical Connections, Checking Of Thermostat, Controls And Drain Line, Testing Of Cooling Performance, Minor Adjustments, And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Servicing And Commissioning Of 2.0 Tr Split/Cassette Type Air Conditioner, Including Cleaning Of Indoor And Outdoor Units, Air Filters, Condenser And Evaporator Coils, Checking Of Refrigerant Lines And Insulation, Tightening Of Electrical Connections, Checking Of Thermostat, Controls And Drain Line, Testing Of Cooling Performance, Minor Adjustments, And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Filling Of Refrigerant Gas R-22/32 In Air Conditioner Units, Including Leak Detection, Minor Leak Rectification (If Required), Vacuuming, Charging Of Gas Up To Required Pressure, Testing Of Cooling Performance And All Labour, Tools & Tackles Complete As Per Direction Of Engineer-In-Charge. , Providing And Fixing Of 50 Mfd Capacitor Suitable For 1.5 Tr & 2.0 Tr Window/Split Type Air Conditioner Units, Including Dismantling Of Defective Capacitor, Supplying And Fixing New Capacitor Of Approved Make, Proper Jointing And Insulating Of Connections, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Servicing Of Rewinding Of Outdoor Unit Fan Motor (Blower/ Condenser Fan Motor) Of 1.5 Tr & 2.0 Tr Capacity Window/Split Type Air Conditioners, Including Dismantling, Rewinding With Super Enamelled Copper Wire Of Appropriate Gauge, Insulation, Varnishing, Reassembling, Testing, And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, And Cost Of New Enamelled Copper Wire. The Salvage/Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Providing And Servicing Of Rewinding Of Indoor Unit Fan Motor (Blower Motor) Of 1.5 Tr & 2.0 Tr Capacity Split Type Air Conditioners, Including Dismantling, Rewinding With Super Enamelled Copper Wire Of Appropriate Gauge, Insulation, Varnishing, Reassembling, Testing, And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, And Cost Of New Super Enamelled Copper Wire. The Salvage/ Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Providing And Fixing Of Printed Circuit Board (Pcb) Suitable For 1.5 Tr Split/ Window Type Air Conditioner, Including Dismantling Of Defective Pcb, Supplying And Fixing New Pcb Of Acceptable Make, Proper Connection Of Wiring, Programming/Configuration (If Required), Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Fixing Of Printed Circuit Board (Pcb) Suitable For 2.0 Tr Split Type Air Conditioner, Including Dismantling Of Defective Pcb, Supplying And Fixing New Pcb Of Compatible Make, Proper Connection Of Wiring, Programming/Configuration (If Required), Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Fixing Aluminium Protection Jali For Outdoor Unit Of 1.5 Tr / 2.0 Tr Window/Split Type Air Conditioner, Including Fabrication Of Aluminium Mesh With Suitable Frame, Cutting, Bending, Fixing With Screws/Cl S, Proper Alignment, And Ensuring Adequate Ventilation, Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Replacement Of Compressor For 1.5 Tr Split/Window Type Air Conditioner, Including Dismantling Of Defective Compressor, Supplying And Fixing New Compressor Of Approved Make And Suitable Capacity, Replacement Of Necessary Components Such As Filter Drier, Charging Of Refrigerant Gas, Brazing Of Joints, Leak Testing, Vacuuming, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Replacement Of Compressor For 2.0 Tr Split Type Air Conditioner, Including Dismantling Of Defective Compressor, Supplying And Fixing New Compressor Of Approved Make And Suitable Capacity, Replacement Of Filter Drier, Brazing Of Joints, Vacuuming, Charging Of Refrigerant Gas, Leak Testing, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Fixing Of Pvc Fan Blade In Outdoor Unit Of Window/Split Type Air Conditioner Units, Including Dismantling Of Damaged Blade, Supplying And Fixing New Pvc Fan Blade Of Suitable Size And Make, Proper Alignment, Tightening, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Providing And Fixing Of Room Temperature Sensor With Coil Casing In Split/Window Type Air Conditioner Units, Including Dismantling Of Defective Sensor, Supplying And Fixing New Sensor Of Compatible Make, Proper Connection, Placement In Coil Area, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Repair Of Swing System Of Indoor Unit Of Split Type Air Conditioners, Including Repair/ Replacement Of Swing Motor, Swing Fins (Louvers), Locks, Linkages And Other Associated Components, Dismantling, Refixing, Alignment, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Rewinding, Maintenance And Servicing Of 10 Hp Submersible/Monoblock Pump Set, Including Dismantling, Rewinding Of Stator With Super Enamelled Copper Wire Of Appropriate Gauge, Insulation, Varnishing, Reassembling, Replacement Of Minor Worn-Out Parts (Bushes, Seals, Gaskets If Required), Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables, And Cost Of New Super Enamelled Copper Wire. The Salvage/Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Rewinding, Maintenance And Servicing Of 7.5 Hp Monoblock/Submersible Motor, Including Dismantling, Rewinding Of Stator With Super Enamelled Copper Wire Of Suitable Gauge, Insulation, Varnishing, Reassembling, Replacement Of Minor Worn-Out Parts (Bearings, Bushes, Seals, Gaskets If Required), Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables, And Cost Of New Super Enamelled Copper Wire. The Salvage/Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Rewinding, Maintenance And Servicing Of 3 Hp Monoblock Motor, Including Dismantling, Rewinding Of Stator With Super Enamelled Copper Wire Of Suitable Gauge, Insulation, Varnishing, Reassembling, Replacement Of Minor Worn-Out Parts (Bearings, Bushes, Seals, Gaskets If Required), Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables, And Cost Of New Super Enamelled Copper Wire. The Salvage/Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Rewinding Of 2 Hp, 3-Phase Motor Of Industrial Evaporative Ductable Air Cooler, Including Dismantling, Rewinding With Super Enamelled Copper Wire Of Suitable Gauge, Insulation, Varnishing, Reassembling, And Servicing Of Complete Air Cooler Including Cleaning Of Cooling Pads, Checking Of Pump, Fan/Blower, Belt (If Any), Bearings, Electrical Connections, Lubrication, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables, And Cost Of New Super Enamelled Copper Wire. The Salvage/ Buyback Value Of The Burnt Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Rewinding Of Motor Of Electrical Ceiling Fan, Including Dismantling Of Fan Motor, Cleaning, Rewinding Of Stator Winding With New Super Enamelled Copper Wire Of Appropriate Gauge, Insulation Treatment, Varnishing And Oven Drying As Required, Reassembling, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables And Cost Of New Super Enamelled Copper Wire. The Salvage/Buyback Value Of The Burnt/Old Copper Wire Recovered During Rewinding Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Providing And Fixing Of 3.0 To 3.25 Mfd Capacitor In Ceiling/Exhaust/Wall Fan, Including Dismantling Of Defective Capacitor, Supplying And Fixing New Capacitor Of Approved Make, Proper Jointing And Insulating Of Connections, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, And Cost Of New Capacitor Of Approved Make. The Salvage/Buyback Value Of The Old/Burnt/Unserviceable Capacitor Recovered During Replacement Shall Be Adjusted And The Net Rate Quoted Shall Be After Deducting Such Buyback Value. , Locating And Identifying Fault In Underground Armoured Power Cable Using Suitable Cable Fault Locating Equipment (Cable Route Tracer, Surge Generator / Thumper And Acoustic Pin-Pointing Detector), Including Mobilisation Of Equipment And Operator To Site, Pre-Location Of Fault Zone, Tracing Of Exact Fault Position Along Cable Route, Pin-Pointing And Marking On Ground For Excavation, De-Mobilisation Of Equipment On Completion Complete In All Respects As Per Direction Of Engineer-In-Charge. Excavation / Earthwork, Cutting And Removal Of Damaged Cable Portion, And Cable Jointing Shall Be Measured And Paid Separately. , Locating And Identifying Additional Fault In Underground Armoured Power Cable During The Same Mobilisation / Visit, Cable Fault Locating Equipment Already Deployed At Site (Cable Route Tracer, Surge Generator / Thumper And Acoustic Pin-Pointing Detector), Including Pre-Location Of Fault Zone, Tracing Of Exact Fault Position Along Cable Route, Pin-Pointing And Marking On Ground For Excavation, Complete In All Respects As Per Direction Of Engineer-In-Charge. Excavation / Earthwork, Cutting And Removal Of Damaged Cable Portion, And Cable Jointing Shall Be Measured And Paid Separately. , Dehydration And Filtration Of Transformer Oil Of 500 Kva Transformer Using High Vacuum Oil Filtration Plant, Including Heating, Removal Of Moisture, Sludge And Impurities, Improvement Of Dielectric Strength (Bdv), Testing Before And After Filtration, And Making The Transformer Oil Suitable For Operation, Complete In All Respects As Per Direction Of Engineer-In-Charge. , Providing And Fixing Of Silica Gel Breather (Filter/Cap) Complete With Silica Gel Crystals For 500 Kva Transformer, Including Dismantling Of Old/Damaged Breather, Supplying And Fixing New Breather Assembly, Filling Of Fresh Silica Gel, Cleaning/Replacement Of Oil Cup, Proper Sealing, Checking Of Air Passage, And Testing Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Servicing And Repairing Of Vacuum Circuit Breaker (Vcb) Panel Associated With 500 Kva Transformer, Including Cleaning Of Insulators And Contacts, Checking And Tightening Of All Electrical Connections, Servicing Of Operating Mechanism, Lubrication Of Moving Parts, Checking Of Vacuum Interrupter Condition, Testing Of Control Circuit, Replacement Of Minor Worn-Out Parts (Springs, Coils, Auxiliary Contacts If Required), And Testing & Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Servicing Of Air Circuit Breaker (Acb) Installed In Lt Panel Associated With Transformer, Including Cleaning Of Contacts And Arc Chutes, Checking And Tightening Of All Electrical Connections, Servicing Of Operating Mechanism, Lubrication Of Moving Parts, Checking Of Trip Unit And Control Circuit, And Testing & Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. , Servicing, Checking, Calibration And Repair Of Apfc (Automatic Power Factor Correction) Panel Including Cleaning Of Contacts, Checking Of Relay, Contactors, Capacitor Banks Etc. Complete. , Providing And Laying Insulating Rubber Mat Of Suitable Thickness (As Per Voltage Level, Is:15652) In Substation / Lt Panel Room, Having Anti-Skid Surface, Including Cutting To Size, Placing In Position And Ensuring Proper Insulation Safety Complete As Required. , Replacement Of Heavy Duty Durable Honeycomb Pad Cooling Media, 100 Mm Thick, For Evaporative Ductable Cooler, Including Dismantling And Removal Of Existing Unserviceable Cooling Media, Supplying, Fitting, Fixing And Commissioning Of New Honeycomb Cooling Pads Complete In All Respects, As Approved By The Engineer-In-Charge. Including Disposal Of Unserviceable Material Outside The Premises As Directed, For One Complete Cooler. , Replacement Of Defective Water Circulation Pump In Evaporative Ductable Air Cooler With New Approved Quality Pump Of Suitable Capacity, Including Removal Of Old Pump, Connection To Existing Electrical And Water Circulation System, Testing And Commissioning Complete (With Buyback Option) In All Respects To The Satisfaction Of The Engineer-In-Charge. , Replacement Of Bearing And Repair Of Shaft Of Electrical Ceiling Fan, Including Dismantling Of Fan Motor Assembly, Removing Defective/Worn Bearing(S), Cleaning Of Bearing Housing, Pressing/ Fitting New Ball Bearing(S) Of Suitable Size And Make, Straightening Or Replacement Of Shaft If Required, Replacement Of Seals If Found Defective, Greasing, Reassembling, Testing And Commissioning Complete In All Respects, To The Satisfaction Of Engineer-In-Charge. The Rate Includes Cost Of Labour, Tools & Tackles, Consumables, New Ball Bearing(S), Grease And Seals As Required. , Repair And Servicing Of Gearbox Of 11 Kv Vcb Of Crompton Make Including Greasing And Rectification Of Alignment, Repair Of Ratchet (Garari) Etc. As Per Direction Of Engineer In Charge. , Providing And Installation Of Vcb Dc Power Pack Unit 220V To 110V Dc (With Buyback Option) As Per Direction Of Engineer In Charge. , Providing & Installation Of Current Relay Cgi 14C (With Buyback Option) As Per Direction Of Engineer In Charge. , Servicing Of Oltc Type 500 Kva Transformers Including Oil Dehydration And Filtration As Per Direction Of Engineer In Charge. , Providing And Filling Transformer Oil Or Insulating Oil During Dehydration Process In Existing 500 Kva Transformer Including All Charges. , Providing And Installation Of Suitable Digital/Analog Ere Meter Of Reputed Make (Ae Or Equivalent), Flush Mounting Type, Suitable For Measurement Of Ac Current In The Lt Panel, Complete With Necessary Ct Connection, Selector Switch, Auxiliary Wiring, Terminals, Mounting Accessories And All Other Required Accessories, Including Testing And Commissioning, Complete In All Respects (With Buyback Option) As Required And To The Satisfaction Of The Engineer-In-Charge. , Providing And Installation Of Suitable Digital/Analog Voltage Meter Of Reputed Make (Ae Or Equivalent), Flush Mounting Type, Suitable For Measurement Of Ac Voltage In The Lt Panel, Complete With Necessary Selector Switch, Auxiliary Wiring, Terminals, Mounting Accessories And All Other Required Accessories, Including Testing And Commissioning, Complete In All Respects (With Buyback Option) As Required And To The Satisfaction Of The Engineer-In-Charge. , Providing And Installation Of Led Type Phase Indicator Lights Of Suitable Voltage Rating, Reputed Make, Complete With Suitable Mounting Arrangement, Indicating The Availability Of R-Phase (Red), Y-Phase (Yellow) And B-Phase (Blue) Supply, Including Necessary Wiring, Terminals, Connectors And All Other Accessories Required For Proper Operation, Testing And Commissioning, Complete In All Respects (With Buyback Option) As Required And To The Satisfaction Of The Engineer-In-Charge. (R-Phase - 15 Nos , Y-Phase - 05 Nos And B-Phase - 05 Nos).
Basic Detail
Tender No GEM/2026/B/7970898
Bidding Type Tender
Location
City Rewari
State Haryana
Key Dates
Publish Date 28 Aug 2026
Submission Date 18 Sep 2026
Open Date 18 Sep 2026
Finance
Tender Value 5.30 Lakhs
Tender Fee Ref. Documents
EMD 10617
Exemption Available
Document List
979939ec-1b05-4844-8669-022822f1dd2c.pdf
1787901496.pdf
1787901517.pdf
1787901620.pdf
1787901672.pdf
1787901773.pdf
1787903785.xlsx

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 28, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Sep 18, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 20 days

Tender Documents

Download All (ZIP) ↓
pdf

979939ec-1b05-4844-8669-022822f1dd2c.pdf

pdf

1787901496.pdf

pdf

1787901517.pdf

pdf

1787901620.pdf

pdf

1787901672.pdf

pdf

1787901773.pdf

xlsx

1787903785.xlsx

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders