Drinking Water Supply and Sanitation Government Departments Closing in 2 days TDR #57228708

Tender For Repair & Restoration Of Damaged 8 Water Supply Schemes Due To Deviya Aapda In Year 2025-2026 In Block Sahaspur & Doiwala

Issued by Government Departments · Dehradun, Uttarakhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
17 Sep 2026
2 days left
EMD
2.80 Lakhs
Bank guarantee accepted
Document Fee
4720
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Dehradun → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Repair & Restoration Of Damaged 8 Water Supply Schemes Due To Deviya Aapda In Year 2025-2026 In Block Sahaspur & Doiwala

BOQ

Name of Work:- Repair & Restoration of Damaged 8 Water Supply Schemes due to Deviya Aapda in year 2025-2026 in Block Sahaspur & Doiwala
Sl. No. Item Description
1AAMWALA W/S SCHEME
2Supply of all materials, labour & T&P etc to construct of following works as per type design and drawings complete :- Intake chamber for spring (0.60x0.60) M.
3Intake Chamber (0.60x0.60) M.
4Dismantling & Relaying of following dia.screwed and socketed G.I. pipes specials and fitting including taking out of dismantled G.I pipes and specials from trenches and stacking then properly with in 50m but excluding the cost of earth works.
5100 mm Dia
6150 mm Dia
7Providing, Supply and Carting, laying jointing fixing and testing of G.I. screwed pipe with spcials in trenched (including cost of jointing materials like white lead, hemp and oil etc.) testing of pipe (medium quality) including cutting and threading etc. complete
8100 mm Dia
9150 mm Dia
10Excavation of earth for pipe line in trenches with lift up to 1.50 M. & lead up to 30 M. including refilling, watering, ramming, of excavated earth into the trenches and removal of surplus earth up to a distance of 60 M. form trenches including supply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shingle bajri & boulders and 25% will be in medium rocks.For New Pipe Line
11Soil mixed with boulders and bajri.
12Protection works of the above items
13R.R. 1:6
14R.R. Dry
15P.C.C (1:4:8)
16P.C.C (1:2:4) With cement and sand ,20mm stone grit including supply all material labour T&P.
17Wire cretes Size (3.0x1.50x1.50)m with GI wire confirming to IS : 280 & IS : 4826 in 150x150 mesh laid with stone boulder as per specification (GI wire guage B.W.G).
18Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.
19Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
20Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
21Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
22Centering and shuttering including strutting, propping etc. and removal of form for : -
23Foundations, footings, bases of columns, etc. for mass concrete
24Columns, Pillars, Piers, Abutments, Posts and Strut
25KANDOLI (NIMMI RIVER) W/S Scheme
26Supply of all materials, labour & T&P etc to construct of following works as per type design and drawings complete :-.
27S.C.C. CURM ROUGHENING FILTER (1.0X1.0M)
28Dismantling & Relaying of following dia.screwed and socketed G.I. pipes specials and fitting including taking out of dismantled G.I pipes and specials from trenches and stacking then properly with in 50m but excluding the cost of earth works.
29100 mm Dia
30Providing, Supply and Carting, laying jointing fixing and testing of G.I. screwed pipe with spcials in trenched (including cost of jointing materials like white lead, hemp and oil etc.) testing of pipe (medium quality) including cutting and threading etc. complete
31100 mm Dia
32Excavation of earth for pipe line in trenches with lift up to 1.50 M. & lead up to 30 M. including refilling, watering, ramming, of excavated earth into the trenches and removal of surplus earth up to a distance of 60 M. form trenches including supply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shingle bajri & boulders and 25% will be in medium rocks.For New Pipe Line
33Soil mixed with boulders & bajri
34Protection works of the above items
35R.R. 1:6
36R.R. Dry
37P.C.C (1:4:8)
38P.C.C (1:2:4) With cement and sand ,20mm stone grit including supply all material labour T&P.
39Wire cretes Size (3.0x1.50x1.50)m with GI wire confirming to IS : 280 & IS : 4826 in 150x150 mesh laid with stone boulder as per specification (GI wire guage B.W.G).
40Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.
41Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
42Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
43Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
44Centering and shuttering including strutting, propping etc. and removal of form for : -
45Foundations, footings, bases of columns, etc. for mass concrete
46Columns, Pillars, Piers, Abutments, Posts and Strut
47KANDOLI (SWAJAL) W/S Scheme
48Supply of all materials, labour & T&P etc to construct of following works as per type design and drawings complete :- .
49French well (350 mm dia)
50Cross wall
51Dismantling & Relaying of following dia.screwed and socketed G.I. pipes specials and fitting including taking out of dismantled G.I pipes and specials from trenches and stacking then properly with in 50m but excluding the cost of earth works.
5265 mm dia
5380 mm dia
54100 mm dia
55Providing, Supply and Carting, laying jointing fixing and testing of G.I. screwed pipe with spcials in trenched (including cost of jointing materials like white lead, hemp and oil etc.) testing of pipe (medium quality) including cutting and threading etc. complete
5665 mm dia
5780 mm dia
58100 mm dia
59Excavation of earth for pipe line in trenches with lift up to 1.50 M. & lead up to 30 M. including refilling, watering, ramming, of excavated earth into the trenches and removal of surplus earth up to a distance of 60 M. form trenches including supply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shingle bajri & boulders and 25% will be in medium rocks.For New Pipe Line
60Soil mixed with boulders & bajri
61Protection works of the above items
62R.R. 1:6
63R.R.Dry
64P.C.C (1:4:8)
65P.C.C (1:2:4) With cement and sand ,20mm stone grit including supply all material labour T&P.
66Wire cretes Size (3.0x1.50x1.50)m with GI wire confirming to IS : 280 & IS : 4826 in 150x150 mesh laid with stone boulder as per specification (GI wire guage B.W.G).
67Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.
68Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
69Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
70Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
71Centering and shuttering including strutting, propping etc. and removal of form for : -
72Foundations, footings, bases of columns, etc. for mass concrete
73Columns, Pillars, Piers, Abutments, Posts and Strut
74KANDOLI (MALDUNG) W/S Scheme
75Supply of all materials, labour & T&P etc to construct of following works as per type design and drawings complete :-
76French well (350 mm dia)
77Cross wall
78Dismantling & Relaying of following dia.screwed and socketed G.I. pipes specials and fitting including taking out of dismantled G.I pipes and specials from trenches and stacking then properly with in 50m but excluding the cost of earth works.
79150 mm Dia
80Providing, Supply and Carting, laying jointing fixing and testing of G.I. screwed pipe with spcials in trenched (including cost of jointing materials like white lead, hemp and oil etc.) testing of pipe (medium quality) including cutting and threading etc. complete
81150 mm Dia
82Excavation of earth for pipe line in trenches with lift up to 1.50 M. & lead up to 30 M. including refilling, watering, ramming, of excavated earth into the trenches and removal of surplus earth up to a distance of 60 M. form trenches including supply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shingle bajri & boulders and 25% will be in medium rocks.For New Pipe Line
83Soil mixed with boulders & bajri
84Protection works of the above items
85R.R. 1:6
86R.R. Dry
87P.C.C (1:4:8)
88P.C.C (1:2:4) With cement and sand ,20mm stone grit including supply all material labour T&P.
89Wire cretes Size (3.0x1.50x1.50)m with GI wire confirming to IS : 280 & IS : 4826 in 150x150 mesh laid with stone boulder as per specification (GI wire guage B.W.G).
90Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.
91Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
92Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
93Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
94Centering and shuttering including strutting, propping etc. and removal of form for : -
95Foundations, footings, bases of columns, etc. for mass concrete
96Columns, Pillars, Piers, Abutments, Posts and Strut
97Naugaun Manduwala W/S scheme
98Supply of all materials, labour & T&P etc. and construct following works as per type design and drawings complete :-
99French well for gadhera (350mm dia)
100Relaying and Dismantling of following dia.screwed and socketed G.I. pipes specials and fitting including taking out of dismantled G.I pipes and specials from trenches and stacking then properly with in 50m but excluding the cost of earth works.
101100 mm Dia
102Providing, Supply and Carting, laying jointing fixing and testing of G.I. screwed pipe with spcials in trenched (including cost of jointing materials like white lead, hemp and oil etc.) testing of pipe (medium quality) including cutting and threading etc. complete
103100 mm Dia
104Excavation of earth for pipe line in trenches with lift up to 1.50 M. & lead up to 30 M. including refilling, watering, ramming, of excavated earth into the trenches and removal of surplus earth up to a distance of 60 M. form trenches including supply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shingle bajri & boulders and 25% will be in medium rocks.For New Pipe Line
105(a) Soil mixed with boulders & bajri
106(b) Soil mixed with Medium Rocks.
107Protection works of the above items
108R.R. 1:6
109R.R. dry
110Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.
111P.C.C (1:4:8) With cement and sand , stone grit including supply all material labour T&P.
112P.C.C (1:2:4) With cement and sand ,20mm stone grit including supply all material labour T&P.
113Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
114Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
115Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
116Centering and shuttering including strutting, propping etc. and removal of form fo
117Foundations, footings, bases of columns, etc. for mass concrete
118Columns, Pillars, Piers, Abutments, Posts and Strut
119BHANWALA W/S Scheme
120Supply of all materials, labour & T&P etc. and construct of SCC cum roughening filter as per type design and drawings complete :-
121(1.00 x 1.00 ) m
122Relaying and Dismantling of following dia.screwed and socketed G.I. pipes specials and fitting including taking out of dismantled G.I pipes and specials from trenches and stacking then properly with in 50m but excluding the cost of earth works.
123150 mm Dia
124Providing, Supply and Carting, laying jointing fixing and testing of G.I. screwed pipe with spcials in trenched (including cost of jointing materials like white lead, hemp and oil etc.) testing of pipe (medium quality) including cutting and threading etc. complete
125150 mm Dia
126Excavation of earth for pipe line in trenches with lift up to 1.50 M. & lead up to 30 M. including refilling, watering, ramming, of excavated earth into the trenches and removal of surplus earth up to a distance of 60 M. form trenches including supply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shingle bajri & boulders and 25% will be in medium rocks.For New Pipe Line
127(a) Soil mixed with boulders & bajri
128(b) Soil mixed with Medium Rocks.
129Protection works of the above items
130R.R. 1:6
131R.R. dry
132Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.
133P.C.C (1:4:8) With cement and sand , stone grit including supply all material labour T&P.
134P.C.C (1:2:4) With cement and sand ,20mm stone grit including supply all material labour T&P.
135Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
136Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
137Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
138Centering and shuttering including strutting, propping etc. and removal of form fo
139Foundations, footings, bases of columns, etc. for mass concrete
140Columns, Pillars, Piers, Abutments, Posts and Strut
141KHAIRI KHURD W/S Scheme
142Providing of all materials, Carting from site store to site of work, Lowering into trenches with true to alignment, Laying & Jointing of full lenght S&S Centrifugally Cast (Spun) Ductile Iron Pipes confirming to IS : 8329/2000 including supply of 'EPDM' rubber gaskets confirming to IS: 5382-1985 with testing of pipe line complete.
143150 mm Dia
144Excavation of earth for pipe line in trenches with lift up to 1.50 M. & lead up to 30 M. including refilling, watering, ramming, of excavated earth into the trenches and removal of surplus earth up to a distance of 60 M. form trenches including supply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shingle bajri & boulders and 25% will be in medium rocks.For New Pipe Line
145(a) Soil mixed with boulders & bajri
146Provision for making payment to P.W.D./Irrigation/Gram Panchayat & other department for the reinstatement of road.
147Cement concrete road
148KANSWALI KOTHARI W/S Scheme
149Supply of all materials, labour & T&P etc. and construct following works as per type design and drawings complete :-
150French well for gadhera (350mm dia)
151Relaying and Dismantling of following dia.screwed and socketed G.I. pipes specials and fitting including taking out of dismantled G.I pipes and specials from trenches and stacking then properly with in 50m but excluding the cost of earth works.
152100 mm Dia
153Providing, Supply and Carting, laying jointing fixing and testing of G.I. screwed pipe with spcials in trenched (including cost of jointing materials like white lead, hemp and oil etc.) testing of pipe (medium quality) including cutting and threading etc. complete
154100 mm Dia
155Excavation of earth for pipe line in trenches with lift up to 1.50 M. & lead up to 30 M. including refilling, watering, ramming, of excavated earth into the trenches and removal of surplus earth up to a distance of 60 M. form trenches including supply of labour, T&P etc. all complete (Assuming that 90% pipe line is laid in trenches. It is estimated that 75% excavation will be in soil mixed with shingle bajri & boulders and 25% will be in medium rocks.For New Pipe Line
156(a) Soil mixed with boulders & bajri
157(b) Soil mixed with Medium Rocks.
158Protection works of the above items
159R.R. 1:6
160R.R. dry
161Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.
162P.C.C (1:4:8) With cement and sand , stone grit including supply all material labour T&P.
163P.C.C (1:2:4) With cement and sand ,20mm stone grit including supply all material labour T&P.
164Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
165Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
166Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
167Centering and shuttering including strutting, propping etc. and removal of form for-
168Foundations, footings, bases of columns, etc. for mass concrete
169Columns, Pillars, Piers, Abutments, Posts and Strut
170Environment Monitoring (Pre-construction Stage)
171Ambient Air Quality (PM2.5, PM10, SOX, NOX, CO)
172Surface Water quality (IS 2294)
173Noise Levels (Day time and night time noise level (max, min & Leqlevels)
174Environment Monitoring (Construction Stage)
175Ambient Air Quality (PM2.5, PM10, SOX, NOX, CO)
176Surface Water quality (IS 2294)
177Noise Levels (Day time and night time noise level (max, min &Leq levels)
178Provision of Mobile Toilets at Work Site including maintenance till Construction Period
179(i) Supply and commissioning of mobile toilets on wheel/ prefab toilet (2 units each Toilet and bathroom) with proper water supply and drainage system, electric supply and safe access at work site locations
180(ii) Maintenance: Daily cleaning twice a day by engaging one permanent helper
181(iii) Painting at every six months
182Environmental Protection, Safety, IEC and Social & Environmental Trainings
183ESMP and OHS Training at site (1 day)
184Labour Laws Training at site (1 day)
185Training on sensitization on Gender issues including SEA/SH Provisions
186GRC meeting / stakeholder meeting
187Community Meetings/Public Consultations & Community Health and Safety Training
188Awareness Training for HIV/AIDS and other STDs
189Project Information boards as per as per direction of Engineering Encharge
190Potable water quality Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57228708
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 17-09-2026
Authority
Authority Name Drinking Water And Sanitation Department
Work Description Tender for Repair & Restoration Of Damaged 8 Water Supply Schemes Due To Deviya Aapda In Year 2025-2026 In Block Sahaspur & Doiwala
Basic Detail
Tender No Letter No. 2882/NIVIDA/181 Dated 24.08.2026
Bidding Type Tender
Location
City Dehradun
State Uttarakhand
Key Dates
Publish Date 27 Aug 2026
Submission Date 17 Sep 2026
Open Date 17 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee 4720
EMD 2.80 Lakhs
Exemption Not Available
Document List
895dd81e-18a4-4f7f-85cb-985679f6c97f.html
Bid_Document_compressed.pdf
BOQ_117200.xls
Tendernotice_1 (22).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 27, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 17, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Sep 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
html

895dd81e-18a4-4f7f-85cb-985679f6c97f.html

pdf

Bid_Document_compressed.pdf

xls

BOQ_117200.xls

pdf

Tendernotice_1 (22).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders