Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; As Per Scope Of Work And Atc; As Per Scope Of Work And Atc - Handling Of Pipes/Pipe Fittings From Central Store To Welding Shop. , Ha
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; As Per Scope Of Work And Atc; As Per Scope Of Work And Atc - Handling Of Pipes/Pipe Fittings From Central Store To Welding Shop. , Handling Of Structural Material/Lead Sheet From Central Store To Welding Shop. , Erection Of All Pipes/Pipe Fittings/Valves On Supports. , Welding Of Cs Pipe And Pipe Fittings Including Fit Up With/Without Consumable Insert, Root With Gtaw / Smaw / Open Root With/Without Purging And Completion Of Weld By Gtaw Or Smaw Process. (Bw/Nw) & Dpt Of Weld Joints. , Welding Of Cs Pipe And Pipe Fittings Including Fit Up, Root With Gtaw / Smaw With Or Without Purging And Completion Of Weld Joint By Gtaw Or Smaw Process. (Sw/Fw) & Dpt Of Weld Joints. , Welding Of Cs P-22 Pipe And Pipe Fittings Including Fit Up With/Without Consumable Insert, Root With Gtaw / Smaw / Open Root With/Without Purging, With/Without Preheating And Completion Of Weld By Gtaw Or Smaw Process (Bw/Nw) & Dpt Of Weld Joints. , Welding Of Cs P-22 Pipe And Pipe Fittings Including Fit Up Root With Gtaw / Smaw With/Without Preheating And Completion Of Weld By Gtaw Or Smaw Process. (Sw) & Dpt Of Weld Joints. , Welding Of Ss To Ss Pipe And Pipe Fittings Including Fit Up Of Joint With/Without Consumable Insert, Root With Gtaw / Smaw / Open Root With / Without Purging And Completion Of Weld By Gtaw Or Smaw Process. (Bw/Nw) & Dpt Of Weld Joint. , Welding Of Ss To Ss Pipe And Pipe Fittings Including Fit Up Of Joint, Root With Gtaw / Smaw / Open Root With / Without Purging And Completion Of Weld By Gtaw Or Smaw Process. (Sw/Fw) & Dpt Of Weld Joint. , Dismantling Of Pipes/Pipe Fittings/Valves Of All Ferrus Material By Gas Cutting/Grinding/Unbolting And Handling Of Scrap Upto Smw Shop. , Fabrication & Erection Of Permanent Pipe Supports/ Platform/ Ladder/Hand Railing/ Monkey Guard/ Shielding Flask/Lead Shielding Etc Through Welding/Bolting With The Departmental Material & Dpt Of Weld Joint If Required. , Fabrication & Erection Of Permanent Pipe Supports/ Platform/ Ladder/Hand Railing/ Monkey Guard/ Shielding Flask/Lead Shielding Etc Through Welding/Bolting Including The Supply Of Material ( Ms Chequered Plate, Ms Beam Ms Channel, Ms Angle Etc. ) Plate & Dpt Of Weld Joint If Required. , Fabrication Of Resin Fixation Drum With Departmental Material( Drum, Copper Tube & Wire Mesh) As Per Attached Drawing. , Dismantling Of Structural Steel Like Pipe Supports/ Platform/ Ladder/ Hand Railing/ Monkey Guard/ Shielding Flask With Lead Through Gas Cutting / Grinding/Unbolting And Handling Of Scrap Upto Smw Shop/ Central Store. , Plug Installation And Welding Of Hx Tubes & Dpt Of Weld Joints. , Fabrication And Installation Of Pipe Cl Set At Different Locations For On Line Leak Rectification. , Metal Built Up Upto 2 Mm Thickness By Welding (Gtaw/Smaw) & Dpt Of Weld Joints. , Pwht & Stress Relievieng Of Weld Joints. , Supply And Installation Of M10x110 Mm Hst Anchor Fasteners, Make Hilti Complete With All Tools, Tackles, And Incidental Materials Required For Proper Fixing. , Supply And Installation Of M12x125 Mm Hst4 Anchor Fasteners Make Hilti, Complete With All Tools, Tackles, And Incidental Materials Required For Proper Fixing. , Supply And Installation Of M16x 125 Mm Hst Anchor Fasteners Make Hilti, Complete With All Tools, Tackles, And Incidental Materials Required For Proper Fixing. , Supply And Installation Of M12 Pin Hammer Type Anchor Fasteners, Complete With All Tools, Tackles, And Incidental Materials Required For Proper Fixing. , Shifting/Transportation Of Stress Relieving Machine, To And From Naps Site. , Surface Painting Of Structure Steel, Pipes And Other Steel Components By Applying One Coat Of Red Oxide Metal Primer Followed By One Coat Of Synthetic Enamel Paint Of Required Shade(Green/ Blue/ Red/ White) With The Supply Of Of Red Oxide Primer And Paint. , Hot Dip Galvanising Of Fabricated Pipes, Structural Material And Supports As Per Requirement Confirming To Is 4759/2629 Inclusive Of Charges Towards Inspection And Transportation Charges For Delivery And Collection Of Material To/ From Galvanising Facility.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Handling of pipes/pipe fittings from central store to welding shop. | Handling of pipes/pipe fittings from central store to welding shop. |
| 2 | Handling of structural material/lead sheet from central store to welding shop. | Handling of structural material/lead sheet from central store to welding shop. |
| 3 | Erection of all pipes/pipe fittings/valves on supports. | Erection of all pipes/pipe fittings/valves on supports. |
| 4 | Welding of CS pipe and pipe fittings including fit up with/without consumable insert, root with GTAW / SMAW / Open root with/without purging and completion of weld by GTAW or SMAW process. (BW/NW) & DPT of weld joints. | Welding of CS pipe and pipe fittings including fit up with/without consumable insert, root with GTAW / SMAW / Open root with/without purging and completion of weld by GTAW or SMAW process. (BW/NW) & DPT of weld joints. |
| 5 | Welding of CS pipe and pipe fittings including fit up, root with GTAW / SMAW with or without purging and completion of weld joint by GTAW or SMAW process. (SW/FW) & DPT of weld joints. | Welding of CS pipe and pipe fittings including fit up, root with GTAW / SMAW with or without purging and completion of weld joint by GTAW or SMAW process. (SW/FW) & DPT of weld joints. |
| 6 | Welding of CS P-22 pipe and pipe fittings including fit up with/without consumable insert, root with GTAW / SMAW / Open root with/without purging, with/without preheating and completion of weld by GTAW or SMAW process (BW/NW) & DPT of weld joints. | Welding of CS P-22 pipe and pipe fittings including fit up with/without consumable insert, root with GTAW / SMAW / Open root with/without purging, with/without preheating and completion of weld by GTAW or SMAW process (BW/NW) & DPT of weld joints. |
| 7 | Welding of CS P-22 pipe and pipe fittings including fit up root with GTAW / SMAW with/without preheating and completion of weld by GTAW or SMAW process. (SW) & DPT of weld joints. | Welding of CS P-22 pipe and pipe fittings including fit up root with GTAW / SMAW with/without preheating and completion of weld by GTAW or SMAW process. (SW) & DPT of weld joints. |
| 8 | Welding of SS to SS pipe and pipe fittings including fit up of joint with/without consumable insert, root with GTAW / SMAW / Open root with / without purging and completion of weld by GTAW or SMAW process. (BW/NW) & DPT of weld joint. | Welding of SS to SS pipe and pipe fittings including fit up of joint with/without consumable insert, root with GTAW / SMAW / Open root with / without purging and completion of weld by GTAW or SMAW process. (BW/NW) & DPT of weld joint. |
| 9 | Welding of SS to SS pipe and pipe fittings including fit up of joint, root with GTAW / SMAW / Open root with / without purging and completion of weld by GTAW or SMAW process. (SW/FW) & DPT of weld joint. | Welding of SS to SS pipe and pipe fittings including fit up of joint, root with GTAW / SMAW / Open root with / without purging and completion of weld by GTAW or SMAW process. (SW/FW) & DPT of weld joint. |
| 10 | Dismantling of pipes/pipe fittings/valves of all ferrus material by gas cutting/grinding/unbolting and handling of scrap upto SMW shop. | Dismantling of pipes/pipe fittings/valves of all ferrus material by gas cutting/grinding/unbolting and handling of scrap upto SMW shop. |
| 11 | Fabrication & erection of permanent pipe supports/ Platform/ Ladder/Hand railing/ Monkey guard/ Shielding flask/Lead Shielding etc through welding/bolting with the departmental material & DPT of weld joint if required. | Fabrication & erection of permanent pipe supports/ Platform/ Ladder/Hand railing/ Monkey guard/ Shielding flask/Lead Shielding etc through welding/bolting with the departmental material & DPT of weld joint if required. |
| 12 | Fabrication & erection of permanent pipe supports/ Platform/ Ladder/Hand railing/ Monkey guard/ Shielding flask/Lead Shielding etc through welding/bolting including the supply of material ( MS Chequered plate, MS Beam MS Channel, MS Angle etc. ) Plate & DPT of weld joint if required. | Fabrication & erection of permanent pipe supports/ Platform/ Ladder/Hand railing/ Monkey guard/ Shielding flask/Lead Shielding etc through welding/bolting including the supply of material ( MS Chequered plate, MS Beam MS Channel, MS Angle etc. ) Plate & DPT of weld joint if required. |
| 13 | Fabrication of resin fixation drum with departmental material( drum, copper tube & wire Mesh) as per attached drawing. | Fabrication of resin fixation drum with departmental material( drum, copper tube & wire Mesh) as per attached drawing. |
| 14 | Dismantling of structural steel like Pipe supports/ Platform/ Ladder/ Hand railing/ Monkey guard/ Shielding flask with lead through gas cutting / grinding/unbolting and handling of scrap upto SMW shop/ Central Store. | Dismantling of structural steel like Pipe supports/ Platform/ Ladder/ Hand railing/ Monkey guard/ Shielding flask with lead through gas cutting / grinding/unbolting and handling of scrap upto SMW shop/ Central Store. |
| 15 | Plug installation and welding of HX tubes & DPT of weld joints. | Plug installation and welding of HX tubes & DPT of weld joints. |
| 16 | Fabrication and installation of pipe clamp set at different locations for on line leak rectification. | Fabrication and installation of pipe clamp set at different locations for on line leak rectification. |
| 17 | Metal built up upto 2 mm thickness by welding (GTAW/SMAW) & DPT of weld joints. | Metal built up upto 2 mm thickness by welding (GTAW/SMAW) & DPT of weld joints. |
| 18 | PWHT & stress relievieng of weld joints. | PWHT & stress relievieng of weld joints. |
| 19 | Supply and installation of M10X110 mm HST anchor fasteners, Make HILTI complete with all tools, tackles, and incidental materials required for proper fixing. | Supply and installation of M10X110 mm HST anchor fasteners, Make HILTI complete with all tools, tackles, and incidental materials required for proper fixing. |
| 20 | Supply and installation of M12X125 mm HST4 anchor fasteners Make HILTI, complete with all tools, tackles, and incidental materials required for proper fixing. | Supply and installation of M12X125 mm HST4 anchor fasteners Make HILTI, complete with all tools, tackles, and incidental materials required for proper fixing. |
| 21 | Supply and installation of M16X 125 mm HST anchor fasteners make HILTI, complete with all tools, tackles, and incidental materials required for proper fixing. | Supply and installation of M16X 125 mm HST anchor fasteners make HILTI, complete with all tools, tackles, and incidental materials required for proper fixing. |
| 22 | Supply and installation of M12 pin hammer type anchor fasteners, complete with all tools, tackles, and incidental materials required for proper fixing. | Supply and installation of M12 pin hammer type anchor fasteners, complete with all tools, tackles, and incidental materials required for proper fixing. |
| 23 | Shifting/transportation of Stress Relieving machine, to and from NAPS site. | Shifting/transportation of Stress Relieving machine, to and from NAPS site. |
| 24 | Surface Painting of structure steel, pipes and other steel components by applying one coat of red oxide metal primer followed by one coat of synthetic enamel paint of required shade(Green/ Blue/ Red/ White) with the supply of of red oxide primer and paint. | Surface Painting of structure steel, pipes and other steel components by applying one coat of red oxide metal primer followed by one coat of synthetic enamel paint of required shade(Green/ Blue/ Red/ White) with the supply of of red oxide primer and paint. |
| 25 | Hot dip galvanising of fabricated pipes, structural material and supports as per requirement confirming to IS 4759/2629 inclusive of charges towards inspection and transportation charges for delivery and collection of material to/ from Galvanising Facility. | Hot dip galvanising of fabricated pipes, structural material and supports as per requirement confirming to IS 4759/2629 inclusive of charges towards inspection and transportation charges for delivery and collection of material to/ from Galvanising Facility. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender