Tender For Manning, Operation And Comprehensive Maintenance For Solar Photo Volt Aic (Spv) Power Plant Of Capacity 5 Mw At Mhow Under Ge Mcte Mhow
Tender Overview
Project Description
Tender for Manning, Operation And Comprehensive Maintenance For Solar Photo Volt Aic (Spv) Power Plant Of Capacity 5 Mw At Mhow Under Ge Mcte Mhow
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-Sep-2026 | C1 | BOQ | 17-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Item No. 1.00: Annual Comprehensive Maintenace and Manning operation of 5MW Solar Power Plant including washing of Solar PV modules and cleaning complete including cutting/uprooting all aroud vegetation, upkeep watch and ward round the clock of solar power plant area as per pre planned schedule, checking electrical parameter of the installed power plant including all major/minor repair/spare with consumable items anything required for fully servicability of SPP except for item No 2 listed in BoQ item Ser No 2 (Prime Cost Sum) all as specified and directed by Engr-in-charge for smooth and efficient performance of solar Plant to achieve desired condition throughout the currency of contract. Required Manning are as under: (a) Solar plant Engineer = 01 Nos , (b) Semi Skilled = 01, (c) Helper(Mate) = 03 Nos, Note :- Bidders has to pay minimum wages notified by office of Chief Labour commissionar, Ministry of Labour and Employment including EPF, ESIC, LWC etc. as applicable to all employees. |
| 2 | (Item No.1.01) - do- for first month to 11th month |
| 3 | (Item No. 1.02) - do- 12th month to 22nd month |
| 4 | (Item No. 1.03) - do- 23 rd month to 33rd month |
| 5 | (Item No. 1.04) - do- 34th month to 44th month |
| 6 | (Item No. 1.05) '- do- 45th month to 55th month |
| 7 | (Item No. 1.06) '- do- 56th month to 66th month |
| 8 | (Item No. 1.07) '- do- 67th month to 77th month |
| 9 | (Item No. 1.08) '- do- 78th month to 88th month |
| 10 | (Item No. 1.09) '- do- 89th month to 99th month |
| 11 | (Item No. 1.10) '- do- 100th month to 110th month |
| 12 | (Item No. 1.11) '- do- 111th month to 120th month |
| 13 | Item No. 2.00 M&L item as mentioned undermentioned for repair/Replacement, rate to be quoted as Prime Cost Sum Rate., amount to be quoted by the tenderer in BoQ shall be restricted to maximum 15 % over and above Prime Cost Sum. Accordingly the tenderer shall quote the amount.The detail of items are as under:(a) Copper cable of size 185, 50, 4.0 Sqmm Single core(b) 33kV Infrastructure ACSR, Disc, Pin & LA(c) Electrical Energy Audit of 5 MW SPP by government auth Company(d) 33 kV HT PCBVCB, CT, PT, LA, VCA Control Panel(e) LT ACB Panel including MCCB 2000/4000 Amp(f) Solar inverter 1.0, 1.25 MW(g) Solar Panel with mounting structure(h) Steel tubular pole 11 mtr(i) Power transformer 5MVA 433/33 KV |
| 14 | Item No. 2.01 -do- for first month to 11th month |
| 15 | Item No. 2.02 '- do- 12th month to 22nd month |
| 16 | Item No. 2.03 '- do- 23 rd month to 33rd month |
| 17 | Item No. 2.04 '- do- 34th month to 44th month |
| 18 | Item No. 2.05 '- do- 45th month to 55th month |
| 19 | Item No. 2.06 '- do- 56th month to 66th month |
| 20 | Item No. 2.07 '- do- 67th month to 77th month |
| 21 | Item No. 2.08 '- do- 78th month to 88th month |
| 22 | Item No. 2.09 '- do- 89th month to 99th month |
| 23 | Item No. 2.10 '- do- 100th month to 110th month |
| 24 | Item No. 2.11'- do- 111th month to 120th month Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 6 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender