Tender For Erection And Diversion Of 3.3 Kv Overhead Line Near 5K (East Side Of Bocp) And Shifting Of 25Kva, 3.3Kv/220V Lighting Transformer Along With Diversion Of 220V P-P Lighting Line With Relocation Of 100W/200W Flood Lights At Bocp.
Tender Overview
Project Description
Tender for Erection And Diversion Of 3.3 Kv Overhead Line Near 5K (East Side Of Bocp) And Shifting Of 25Kva, 3.3Kv/220V Lighting Transformer Along With Diversion Of 220V P-P Lighting Line With Relocation Of 100W/200W Flood Lights At Bocp.
BOQ
| Sl. No. | Item Description |
| 1 | Description of Job |
| 2 | Supply of RCC pole [From East of 5K to pumping station] |
| 3 | Digging of Hard rock for 9/11Mtr. Long pole |
| 4 | Erection of RCC pole [for pumping substation ]( RCC pole 9 M) |
| 5 | Supply and fixing of GI Wire SWG 8/10 |
| 6 | Fitting of Lower bracket(50mm*1.2 Mtr) |
| 7 | Supply &fitting of Upper bracket(50mm*1 Mtr) |
| 8 | Supply &fitting of Stay set |
| 9 | Supply &fitting of Stay clamp |
| 10 | Supply &fitting of Stay insulator |
| 11 | Supply & fixing of Pin insulator |
| 12 | Supply & fixing of Disc insulator at existing DP near Old OB dump of Kumardhubi Colliery |
| 13 | Supply &fitting of clamp |
| 14 | Supply &fitting of Nut-bolts |
| 15 | Stringing of ACSR DOG conductor (3.3kV:10span*3ware*50Mtr)[Conductor supplied by ECL] |
| 16 | Labour Charges for transportation, loading, unloading of material upto site |
| 17 | Dismantling of existing steel tubular Poles |
| 18 | Dismantling of ACSR Rabbit conductor (05 span*03ware*50Mtr) |
| 19 | Labour Charges for Dismantling and transporting of material from existing site to safe location including bracket, disc insulator, pin insulator etc |
| 20 | Shifting of 25KVA 3.3KV/220V lighting Transformer along with Diversion of 220V P-P lighting line with 100W/200W Flood lights at BOCPDigging of hard rock for 9/11mtr. long RCC pole |
| 21 | Erection of pole (9mtr.length) |
| 22 | Supply & fitting of bracket lower |
| 23 | Supply & fitting of upper bracket |
| 24 | Supply & fitting of LT pin insulator |
| 25 | Supply & fitting of LT Shackle insulator |
| 26 | Supply & fitting of cradle bracket |
| 27 | Supply & fitting of stay set |
| 28 | Supply & fitting of stay clamp |
| 29 | Supply & fixing of nuts & bolts (miscellaneous size) |
| 30 | Supply & fitting of G.I wire (for cradling) |
| 31 | Stringing of Rabbit dog conductor (10span X 2 wireX 40 M) |
| 32 | dismantling & reinstallation of flood lights on pole |
| 33 | Fixing of jumpering |
| 34 | Supply and Installation of Chemical earth pit with boundary (less than 1Ω) |
| 35 | Supply of GOAB 11KV grade 1200A horizontal Type |
| 36 | Labour Charges for installation of 11 KV Gang Operated AB Switch &dismantling, transportation, loading, unloading of LT switch with LT, HT Cables from existing location to proposed location |
| 37 | Labour Charges for dismantling, transportation, loading, unloading and reinstallation of 25KVA 3.3KV/220V transformer from existing location to proposed location |
| 38 | Profit/Overhead@10% |
| 39 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender