Tender For Construction Of Bus Que Shelters At Various Locations, Mc Jind (21 Nos.)
Tender Value
1.80 Crore
Estimated cost
Bid Submission
07 Sep 2026
8 days left
EMD
3.61 Lakhs
Bank guarantee accepted
Document Fee
15000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jind → Haryana
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Bus Que Shelters At Various Locations, Mc Jind (21 Nos.)
BOQ
| Sl. No. | Item Description |
| 1 | Supply and Fixing of SS-304 Bus Stop Shelter of Size: 6 L X 2.1 W X 3 H Mtr, which is Made By Column SHS 150 X 150 X 3 mm -04 Nos and Back Side Covered with RHS 75 X 50 X 2 mm and SHS 20 X 20 X 1.8 mm Framing and Front Face Covered with SS Sheet 2 mm, Once Side Cladded with Framing of RHS 75 X 50 X 2 mm and SHS 20 X 20 X 1.8 mm and Laser Cut Sheet 2 mm, Base Plate 300 X 300 X 10 mm, Cover Plate 5 mm, Roofing Structure of RHS 150 X 50 X 2 mm Outer Framing and Inner Member of SHS 20 X 20 X 1.8 mm and Top Covered With SS Sheet 1.2 mm, Seating Bench of RHS 75 X 40 X 2 mm Leg and Seating Top Framing and Face Covered with SS Sheet 2 mm Complete in all respect as per entire satisfaction of engineer-in- charge |
| 2 | [10.1]Providing and laying of base course of floors consisting of 100 mm thick cement 1:8:16 and 100 mm sand or stone filling. [Through Rate] |
| 3 | [10.107]Providing and laying tactile tile (for vision impaired persons as per standards) of size 300x300x9.8mm having with water absorption less than 0.5% and conforming to IS:15622 of approved make in all colours and shades in for outdoor floors such as footpath, court yard, multi modals location etc., laid on 20mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) in all shapes and patterns including grouting the joints with white cement mixed with matching pigments etc. complete as per direction of Engineer-in-Charge. 0 0 0 [Through Rate] |
| 4 | [10.30.1]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 1. Light shade pigment using white cement [Through Rate] |
| 5 | [10.51]Providing and fixing granite stone in all shades 15mm to 18 mm thick in skirting /dado, risers of steps, pillars and wall facing, laid in any pattern as specified over base of 12mm thick cement coarse sand mortar 1:3 and jointed with white cement slurry mixed with pigment to match the shade of Granite including labour for fixing cramps pins and dowels etc. [Through Rate] |
| 6 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] |
| 7 | [23.3.6.1]COPPER WIRING IN PVC CONDUIT (SURFACE/RECESS) 6.1. Wiring main and sub mains in two single core for phase and neutral wire and one single core for earth wire PVC insulated Copper conductor cable 1100 Volts grade in PVC Conduit etc as required. 1 run of Size 1.50 Sqmm(1/1.40mm) [Through Rate] |
| 8 | [24.13.24]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 24. 16 Sq mm 4 core (Arm.) [Through Rate] |
| 9 | [24.13.32]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 32. 25 Sq mm 4 core (Arm.) [Through Rate] |
| 10 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 11 | [4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate] |
| 12 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] |
| 13 | [6.1.7]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 7. 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) [Through Rate] |
| 14 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 15 | [6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 16 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] |
| 17 | [6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate] |
| 18 | [6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts [Through Rate] |
| 19 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] |
| 20 | [6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate] |
| 21 | [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 27, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 07, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysSep 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender