Housing Urban and Rular Development Government Departments Closing in 6 days TDR #57214953

Tender For E-Rate Quotation Of Non Dsr Items For Preparation Of Estimate For Installing Sculptures On Various Subjects For Beautification Purposes In The Premises Of The Public Works Department At Nashik, Tal. & Dist. Nashik

Issued by Government Departments · Nashik, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
03 Sep 2026
6 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Nashik → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for E-Rate Quotation Of Non Dsr Items For Preparation Of Estimate For Installing Sculptures On Various Subjects For Beautification Purposes In The Premises Of The Public Works Department At Nashik, Tal. & Dist. Nashik , Supplying And Fixing Of Sculptures Of Bridge On Hand Having Size 15 (L) X 15 (W) X 8 (H)1) Make A Model With Shadoo Clay As Per Size And Subject 2)Once The Clay Model Is Complete, Approval Should Be Obtained From The Authority, And Only Then Should Work On The Dai 3)Make A Dai Of Clay Model By Gypsum (Pop) In Multiple Different Parts 4)Partly Casting A Model By Pop Dai In Material Of Frp (Fiberglass) 5)While Producing The Fiber Piece Of The Model, The First Layer Will Be Of 30 Mm Frp Mat Reinforcement And Inside On Top Of That Layer Stone Crush Should Be Applied By Mixing It With Epoxy Resin To Help Increase Strength And Lifespan.6) Each Parts Joint Together By Fiberglass Matt & Resin & Finished Properly 7) Inside Of Model Strengthening With Appropriate Ms Fabricated Structure & Armatures 8) Finished Model Colored With Duco Paints 9)Rcc Pedestal Construct At Site As Per Approved Design & Drawing 10) Pedestal Covered By Stone Cladding Or Grenite. 11)When Installing The Model Onto The Pedestal, The Internal Ss Structure Of The Model Must Be Securely And Firmly Fixed To The Pedestals Structure. 12)While Installing The Model, A Concrete Pouring Process Should Be Done Inside To Make The Model Even Stronger. 13)All Work Done By Appropriate Tools And Hardware/ Machinery 14) The Installed Model Must Stand Extremely Firmly, Even In Conditions Involving Sun, Wind, Rain, And Seismic Activity. , Supplying And Fixing Of Sculptures Of Olamba On Hand Having Size 7 (L) X 30 (W) X 12 (H)1) Make A Model With Shadoo Clay As Per Size And Subject 2)Once The Clay Model Is Complete, Approval Should Be Obtained From The Authority, And Only Then Should Work On The Dai 3)Make A Dai Of Clay Model By Gypsum (Pop) In Multiple Different Parts 4)Partly Casting A Model By Pop Dai In Material Of Frp (Fiberglass) 5)While Producing The Fiber Piece Of The Model, The First Layer Will Be Of 30 Mm Frp Mat Reinforcement And Inside On Top Of That Layer Stone Crush Should Be Applied By Mixing It With Epoxy Resin To Help Increase Strength And Lifespan.6) Each Parts Joint Together By Fiberglass Matt & Resin & Finished Properly 7) Inside Of Model Strengthening With Appropriate Ms Fabricated Structure & Armatures 8) Finished Model Colored With Duco Paints 9)Rcc Pedestal Construct At Site As Per Approved Design & Drawing 10) Pedestal Covered By Stone Cladding Or Grenite. 11)When Installing The Model Onto The Pedestal, The Internal Ss Structure Of The Model Must Be Securely And Firmly Fixed To The Pedestals Structure. 12)While Installing The Model, A Concrete Pouring Process Should Be Done Inside To Make The Model Even Stronger. 13)All Work Done By Appropriate Tools And Hardware/ Machinery 14) The Installed Model Must Stand Extremely Firmly, Even In Conditions Involving Sun, Wind, Rain, And Seismic Activity. , Supplying And Fixing Of Sculptures Of Engineer (2 Nos.) A Having Size 7 (H) X 8 (W))1) Make A Model With Shadoo Clay As Per Size And Subject 2)Once The Clay Model Is Complete, Approval Should Be Obtained From The Authority, And Only Then Should Work On The Dai 3)Make A Dai Of Clay Model By Gypsum (Pop) In Multiple Different Parts 4)Partly Casting A Model By Pop Dai In Material Of Frp (Fiberglass) 5)While Producing The Fiber Piece Of The Model, The First Layer Will Be Of 30 Mm Frp Mat Reinforcement And Inside On Top Of That Layer Stone Crush Should Be Applied By Mixing It With Epoxy Resin To Help Increase Strength And Lifespan.6) Each Parts Joint Together By Fiberglass Matt & Resin & Finished Properly 7) Inside Of Model Strengthening With Appropriate Ms Fabricated Structure & Armatures 8) Finished Model Colored With Duco Paints 9)Rcc Pedestal Construct At Site As Per Approved Design & Drawing 10) Pedestal Covered By Stone Cladding Or Grenite. 11)When Installing The Model Onto The Pedestal, The Internal Ss Structure Of The Model Must Be Securely And Firmly Fixed To The Pedestals Structure. 12)While Installing The Model, A Concrete Pouring Process Should Be Done Inside To Make The Model Even Stronger. 13)All Work Done By Appropriate Tools And Hardware/ Machinery 14) The Installed Model Must Stand Extremely Firmly, Even In Conditions Involving Sun, Wind, Rain, And Seismic Activity. , Supplying And Fixing Of Sculptures Of Afternoon Lunch On Tools Having Size 12 (L) X 8 (W) X 5 (H)1) Make A Model With Shadoo Clay As Per Size And Subject 2)Once The Clay Model Is Complete, Approval Should Be Obtained From The Authority, And Only Then Should Work On The Dai 3)Make A Dai Of Clay Model By Gypsum (Pop) In Multiple Different Parts 4)Partly Casting A Model By Pop Dai In Material Of Frp (Fiberglass) 5)While Producing The Fiber Piece Of The Model, The First Layer Will Be Of 30 Mm Frp Mat Reinforcement And Inside On Top Of That Layer Stone Crush Should Be Applied By Mixing It With Epoxy Resin To Help Increase Strength And Lifespan.6) Each Parts Joint Together By Fiberglass Matt & Resin & Finished Properly 7) Inside Of Model Strengthening With Appropriate Ms Fabricated Structure & Armatures 8) Finished Model Colored With Duco Paints 9)Rcc Pedestal Construct At Site As Per Approved Design & Drawing 10) Pedestal Covered By Stone Cladding Or Grenite. 11)When Installing The Model Onto The Pedestal, The Internal Ss Structure Of The Model Must Be Securely And Firmly Fixed To The Pedestals Structure. 12)While Installing The Model, A Concrete Pouring Process Should Be Done Inside To Make The Model Even Stronger. 13)All Work Done By Appropriate Tools And Hardware/ Machinery 14) The Installed Model Must Stand Extremely Firmly, Even In Conditions Involving Sun, Wind, Rain, And Seismic Activity.

BOQ

Name of Work:- E-Rate Quotation of Non DSR Items for Preparation of Estimate for Installing sculptures on various subjects for beautification purposes in the premises of the Public Works Department at Nashik, Tal. & Dist. Nashik
Sl. No. Item Description
1Supplying and fixing of sculptures of BRIDGE ON HAND having Size 15' (L) X 15' (W) X 8' (H)1) Make a model with \\"SHADOO\\" clay as per size and subject 2)Once the clay model is complete, approval should be obtained from the Authority, and only then should work on the dai 3)Make a dai of clay model by gypsum (POP) in multiple different parts 4)Partly Casting A Model By Pop Dai In Material of FRP (fiberglass) 5)While producing the fiber piece of the model, the first layer will be of 30 mm FRP mat reinforcement and inside on top of that layer stone crush should be applied by mixing it with epoxy resin to help increase strength and lifespan.6) Each parts joint together by fiberglass matt & resin & finished properly 7) Inside of model strengthening with appropriate ms fabricated structure & armatures 8) Finished model colored with duco paints 9)RCC pedestal construct at site as per approved design & drawing 10) Pedestal covered by stone cladding or grenite. 11)When installing the model onto the pedestal, the internal SS structure of the model must be securely and firmly fixed to the pedestal's structure. 12)While installing the model, a concrete pouring process should be done inside to make the model even stronger. 13)All work done by appropriate tools and hardware/ machinery 14) The installed model must stand extremely firmly, even in conditions involving sun, wind, rain, and seismic activity.
2Supplying and fixing of sculptures of OLAMBA ON HAND having Size 7' (L) X 30' (W) X 12' (H)1) Make a model with \\"SHADOO\\" clay as per size and subject 2)Once the clay model is complete, approval should be obtained from the Authority, and only then should work on the dai 3)Make a dai of clay model by gypsum (POP) in multiple different parts 4)Partly Casting A Model By Pop Dai In Material of FRP (fiberglass) 5)While producing the fiber piece of the model, the first layer will be of 30 mm FRP mat reinforcement and inside on top of that layer stone crush should be applied by mixing it with epoxy resin to help increase strength and lifespan.6) Each parts joint together by fiberglass matt & resin & finished properly 7) Inside of model strengthening with appropriate ms fabricated structure & armatures 8) Finished model colored with duco paints 9)RCC pedestal construct at site as per approved design & drawing 10) Pedestal covered by stone cladding or grenite. 11)When installing the model onto the pedestal, the internal SS structure of the model must be securely and firmly fixed to the pedestal's structure. 12)While installing the model, a concrete pouring process should be done inside to make the model even stronger. 13)All work done by appropriate tools and hardware/ machinery 14) The installed model must stand extremely firmly, even in conditions involving sun, wind, rain, and seismic activity.
3Supplying and fixing of sculptures of ENGINEER (2 Nos.) a having Size 7' (H) X 8\\" (W))1) Make a model with \\"SHADOO\\" clay as per size and subject 2)Once the clay model is complete, approval should be obtained from the Authority, and only then should work on the dai 3)Make a dai of clay model by gypsum (POP) in multiple different parts 4)Partly Casting A Model By Pop Dai In Material of FRP (fiberglass) 5)While producing the fiber piece of the model, the first layer will be of 30 mm FRP mat reinforcement and inside on top of that layer stone crush should be applied by mixing it with epoxy resin to help increase strength and lifespan.6) Each parts joint together by fiberglass matt & resin & finished properly 7) Inside of model strengthening with appropriate ms fabricated structure & armatures 8) Finished model colored with duco paints 9)RCC pedestal construct at site as per approved design & drawing 10) Pedestal covered by stone cladding or grenite. 11)When installing the model onto the pedestal, the internal SS structure of the model must be securely and firmly fixed to the pedestal's structure. 12)While installing the model, a concrete pouring process should be done inside to make the model even stronger. 13)All work done by appropriate tools and hardware/ machinery 14) The installed model must stand extremely firmly, even in conditions involving sun, wind, rain, and seismic activity.
4Supplying and fixing of sculptures of AFTERNOON LUNCH ON TOOLS having Size 12' (L) X 8' (W) X 5' (H)1) Make a model with \\"SHADOO\\" clay as per size and subject 2)Once the clay model is complete, approval should be obtained from the Authority, and only then should work on the dai 3)Make a dai of clay model by gypsum (POP) in multiple different parts 4)Partly Casting A Model By Pop Dai In Material of FRP (fiberglass) 5)While producing the fiber piece of the model, the first layer will be of 30 mm FRP mat reinforcement and inside on top of that layer stone crush should be applied by mixing it with epoxy resin to help increase strength and lifespan.6) Each parts joint together by fiberglass matt & resin & finished properly 7) Inside of model strengthening with appropriate ms fabricated structure & armatures 8) Finished model colored with duco paints 9)RCC pedestal construct at site as per approved design & drawing 10) Pedestal covered by stone cladding or grenite. 11)When installing the model onto the pedestal, the internal SS structure of the model must be securely and firmly fixed to the pedestal's structure. 12)While installing the model, a concrete pouring process should be done inside to make the model even stronger. 13)All work done by appropriate tools and hardware/ machinery 14) The installed model must stand extremely firmly, even in conditions involving sun, wind, rain, and seismic activity. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57214953
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 03-09-2026
Authority
Authority Name Public Works Department
Work Description Tender for E-Rate Quotation Of Non Dsr Items For Preparation Of Estimate For Installing Sculptures On Various Subjects For Beautification Purposes In The Premises Of The Public Works Department At Nashik, Tal. & Dist. Nashik , Supplying And Fixing Of Sculptures Of Bridge On Hand Having Size 15 (L) X 15 (W) X 8 (H)1) Make A Model With Shadoo Clay As Per Size And Subject 2)Once The Clay Model Is Complete, Approval Should Be Obtained From The Authority, And Only Then Should Work On The Dai 3)Make A Dai Of Clay Model By Gypsum (Pop) In Multiple Different Parts 4)Partly Casting A Model By Pop Dai In Material Of Frp (Fiberglass) 5)While Producing The Fiber Piece Of The Model, The First Layer Will Be Of 30 Mm Frp Mat Reinforcement And Inside On Top Of That Layer Stone Crush Should Be Applied By Mixing It With Epoxy Resin To Help Increase Strength And Lifespan.6) Each Parts Joint Together By Fiberglass Matt & Resin & Finished Properly 7) Inside Of Model Strengthening With Appropriate Ms Fabricated Structure & Armatures 8) Finished Model Colored With Duco Paints 9)Rcc Pedestal Construct At Site As Per Approved Design & Drawing 10) Pedestal Covered By Stone Cladding Or Grenite. 11)When Installing The Model Onto The Pedestal, The Internal Ss Structure Of The Model Must Be Securely And Firmly Fixed To The Pedestals Structure. 12)While Installing The Model, A Concrete Pouring Process Should Be Done Inside To Make The Model Even Stronger. 13)All Work Done By Appropriate Tools And Hardware/ Machinery 14) The Installed Model Must Stand Extremely Firmly, Even In Conditions Involving Sun, Wind, Rain, And Seismic Activity. , Supplying And Fixing Of Sculptures Of Olamba On Hand Having Size 7 (L) X 30 (W) X 12 (H)1) Make A Model With Shadoo Clay As Per Size And Subject 2)Once The Clay Model Is Complete, Approval Should Be Obtained From The Authority, And Only Then Should Work On The Dai 3)Make A Dai Of Clay Model By Gypsum (Pop) In Multiple Different Parts 4)Partly Casting A Model By Pop Dai In Material Of Frp (Fiberglass) 5)While Producing The Fiber Piece Of The Model, The First Layer Will Be Of 30 Mm Frp Mat Reinforcement And Inside On Top Of That Layer Stone Crush Should Be Applied By Mixing It With Epoxy Resin To Help Increase Strength And Lifespan.6) Each Parts Joint Together By Fiberglass Matt & Resin & Finished Properly 7) Inside Of Model Strengthening With Appropriate Ms Fabricated Structure & Armatures 8) Finished Model Colored With Duco Paints 9)Rcc Pedestal Construct At Site As Per Approved Design & Drawing 10) Pedestal Covered By Stone Cladding Or Grenite. 11)When Installing The Model Onto The Pedestal, The Internal Ss Structure Of The Model Must Be Securely And Firmly Fixed To The Pedestals Structure. 12)While Installing The Model, A Concrete Pouring Process Should Be Done Inside To Make The Model Even Stronger. 13)All Work Done By Appropriate Tools And Hardware/ Machinery 14) The Installed Model Must Stand Extremely Firmly, Even In Conditions Involving Sun, Wind, Rain, And Seismic Activity. , Supplying And Fixing Of Sculptures Of Engineer (2 Nos.) A Having Size 7 (H) X 8 (W))1) Make A Model With Shadoo Clay As Per Size And Subject 2)Once The Clay Model Is Complete, Approval Should Be Obtained From The Authority, And Only Then Should Work On The Dai 3)Make A Dai Of Clay Model By Gypsum (Pop) In Multiple Different Parts 4)Partly Casting A Model By Pop Dai In Material Of Frp (Fiberglass) 5)While Producing The Fiber Piece Of The Model, The First Layer Will Be Of 30 Mm Frp Mat Reinforcement And Inside On Top Of That Layer Stone Crush Should Be Applied By Mixing It With Epoxy Resin To Help Increase Strength And Lifespan.6) Each Parts Joint Together By Fiberglass Matt & Resin & Finished Properly 7) Inside Of Model Strengthening With Appropriate Ms Fabricated Structure & Armatures 8) Finished Model Colored With Duco Paints 9)Rcc Pedestal Construct At Site As Per Approved Design & Drawing 10) Pedestal Covered By Stone Cladding Or Grenite. 11)When Installing The Model Onto The Pedestal, The Internal Ss Structure Of The Model Must Be Securely And Firmly Fixed To The Pedestals Structure. 12)While Installing The Model, A Concrete Pouring Process Should Be Done Inside To Make The Model Even Stronger. 13)All Work Done By Appropriate Tools And Hardware/ Machinery 14) The Installed Model Must Stand Extremely Firmly, Even In Conditions Involving Sun, Wind, Rain, And Seismic Activity. , Supplying And Fixing Of Sculptures Of Afternoon Lunch On Tools Having Size 12 (L) X 8 (W) X 5 (H)1) Make A Model With Shadoo Clay As Per Size And Subject 2)Once The Clay Model Is Complete, Approval Should Be Obtained From The Authority, And Only Then Should Work On The Dai 3)Make A Dai Of Clay Model By Gypsum (Pop) In Multiple Different Parts 4)Partly Casting A Model By Pop Dai In Material Of Frp (Fiberglass) 5)While Producing The Fiber Piece Of The Model, The First Layer Will Be Of 30 Mm Frp Mat Reinforcement And Inside On Top Of That Layer Stone Crush Should Be Applied By Mixing It With Epoxy Resin To Help Increase Strength And Lifespan.6) Each Parts Joint Together By Fiberglass Matt & Resin & Finished Properly 7) Inside Of Model Strengthening With Appropriate Ms Fabricated Structure & Armatures 8) Finished Model Colored With Duco Paints 9)Rcc Pedestal Construct At Site As Per Approved Design & Drawing 10) Pedestal Covered By Stone Cladding Or Grenite. 11)When Installing The Model Onto The Pedestal, The Internal Ss Structure Of The Model Must Be Securely And Firmly Fixed To The Pedestals Structure. 12)While Installing The Model, A Concrete Pouring Process Should Be Done Inside To Make The Model Even Stronger. 13)All Work Done By Appropriate Tools And Hardware/ Machinery 14) The Installed Model Must Stand Extremely Firmly, Even In Conditions Involving Sun, Wind, Rain, And Seismic Activity.
Basic Detail
Tender No e-Quotation Notice No.11 for 2026-27
Bidding Type Tender
Location
City Nashik
State Maharashtra
Key Dates
Publish Date 27 Aug 2026
Submission Date 03 Sep 2026
Open Date 04 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
66c56438-4e6c-4a3d-abb5-97dc2e719553.html
BOQ_2276368.xls
Notice11.pdf
Tendernotice_1 (65).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 27, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 6 days
Sep 04, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
html

66c56438-4e6c-4a3d-abb5-97dc2e719553.html

xls

BOQ_2276368.xls

pdf

Notice11.pdf

pdf

Tendernotice_1 (65).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders