Tender For Creation Of 5X25 Kva Distribution Substations At Batt Pura Dalkhankoot ,Samroli Manthori At Village Jhatheli, Tapalpura Ward No 1 Of Village Dalkhankoot , Bhadwah W.No 4 Of Village Gadether A And Kahal Gowari Of Village Gadether-A Along Wi
Tender Overview
Project Description
Tender for Creation Of 5X25 Kva Distribution Substations At Batt Pura Dalkhankoot ,Samroli Manthori At Village Jhatheli, Tapalpura Ward No 1 Of Village Dalkhankoot , Bhadwah W.No 4 Of Village Gadether A And Kahal Gowari Of Village Gadether-A Along With Ht/Lt Under Ddc Grant Also Lt/ Ht Poles Under Cdf Grant Under The Jurisdiction Of Jpdcl Ed Doda On Full Turnkey Basis.
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer Electric Division Doda JPDCL Jammu Name of Work: Creation of 5x25 KVA Distribution Substations at Batt pura Dalkhankoot ,Samroli Manthori at village Jhatheli, Tapalpura ward no 1 of village Dalkhankoot , Bhadwah W.no 4 of village Gadether A and Kahal Gowari of village Gadether-A along with HT/LT Under DDC Grant also LT/ HT poles under CDF Grant under the jurisdiction of JPDCL ED Doda ON FULL TURNKEY BASIS. Contract No: ED-Doda/JPDCL/52 of 2026-27 Dated: 26-08-2026 Tender value=20.30 Lacs EMD=41000, Tender Fee=2000 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # |
| 2 | Item Description |
| 3 | Creation of 25 KVA at at Butt Pura of village Dal Khankoot along with HT/LT Under DDC Grant(3Lacs) .( All items are SITC) |
| 4 | 11/0.433kV, 3-phase 25 KVA Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, as per amendment 4 of IS 1180-2014 (Aluminium wound) |
| 5 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type |
| 6 | 11kV Link Set Heavy Duty with Bace Channel 75x40x40x6 mm |
| 7 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 8 | 95 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor |
| 9 | 8 Mtr. Long ST Pole (ST-410 SP15)(HT=3,LT=1,S/Station=3) |
| 10 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 11 | GI Channel/Angle/Flat of sizes including clamps |
| 12 | Aluminium Thimble 95 Sq. mm |
| 13 | Aluminium Bus Bar |
| 14 | Aluminium Paint |
| 15 | Busbar Insulator |
| 16 | Nuts and Bolts. |
| 17 | Earthing of substation |
| 18 | 30 mm² ACSR Conductor weasal |
| 19 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 20 | GI Mucky-Clamps for Shackle Insulators |
| 21 | 16kN Shackle Insulators |
| 22 | Creation of 25 KVA S/Stn at Samroli Manthori at village Jhatheli along with HT/LT Under DDC Grant(3Lacs).( All items are SITC) |
| 23 | 11/0.433kV, 3-phase 25 KVA Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, as per amendment 4 of IS 1180-2014 (Aluminium wound) |
| 24 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type |
| 25 | 11kV Link Set Heavy Duty with Bace Channel 75x40x40x6 mm |
| 26 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 27 | 95 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor |
| 28 | 8 Mtr. Long ST Pole (ST-410 SP15)(HT=4,S/Station=3) |
| 29 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 30 | GI Channel/Angle/Flat of sizes including clamps |
| 31 | Aluminium Thimble 95 Sq. mm |
| 32 | Aluminium Bus Bar |
| 33 | Aluminium Paint |
| 34 | Busbar Insulator |
| 35 | Nuts and Bolts. |
| 36 | Earthing of substation |
| 37 | 30 mm² ACSR Conductor weasal |
| 38 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 39 | Additional HT/LT for completion of creation of 25kva S/Stn at Samroli Manthori at village Jhatheli Under CDF Grant(2.76Lacs) ( All items are SITC) |
| 40 | 8 mtr. Long Pole(ST-410, SP15)(HT =8nos, LT=3Nos) |
| 41 | GI Mucky-Clamps for Shackle Insulators |
| 42 | 30 mm² ACSR Conductor |
| 43 | 16kN Polymer Shackle Insulators |
| 44 | GI Channel/Angle/Flat of sizes including clamps |
| 45 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 46 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 47 | Nuts and Bolts. |
| 48 | Aluminium Paint |
| 49 | Creation of 25 KVA at Tapalpura ward no 1 of village Dalkhankoot along with HT/LT Under DDC Grant (3lacs) .( All items are SITC) |
| 50 | 11/0.433kV, 3-phase 25 KVA Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, as per amendment 4 of IS 1180-2014 (Aluminium wound) |
| 51 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type |
| 52 | 11kV Link Set Heavy Duty with Bace Channel 75x40x40x6 mm |
| 53 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 54 | 95 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor |
| 55 | 8 Mtr. Long ST Pole (ST-410 SP15)(HT=3,S/Station=3) |
| 56 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 57 | GI Channel/Angle/Flat of sizes including clamps |
| 58 | Aluminium Thimble 95 Sq. mm |
| 59 | Aluminium Bus Bar |
| 60 | Aluminium Paint |
| 61 | Busbar Insulator |
| 62 | Nuts and Bolts. |
| 63 | Earthing of substation |
| 64 | 30 mm² ACSR Conductor weasal |
| 65 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 66 | Additional HT/LT for completion of 25kva Sub Station at Tapalpura W.NO 1 Under CDF Grant (1.10 Lacs) ( All items are SITC) |
| 67 | 8 mtr. Long Pole(ST-410, SP15)(HT =5nos, LT=1Nos) |
| 68 | GI Mucky-Clamps for Shackle Insulators |
| 69 | 30 mm² ACSR Conductor |
| 70 | 16kN Polymer Shackle Insulators |
| 71 | GI Channel/Angle/Flat of sizes including clamps |
| 72 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 73 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 74 | Nuts and Bolts. |
| 75 | Aluminium Paint |
| 76 | Creation of 25 KVA at upper Bhadwah W.no 4 of village Gadether A along with HT/LT Under DDC Grant (3.0 Lacs).( All items are SITC) |
| 77 | 11/0.433kV, 3-phase 25 KVA Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, as per amendment 4 of IS 1180-2014 (Aluminium wound) |
| 78 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type |
| 79 | 11kV Link Set Heavy Duty with Bace Channel 75x40x40x6 mm |
| 80 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 81 | 95 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor |
| 82 | 8 Mtr. Long ST Pole (ST-410 SP15)(HT=3,LT=1,S/Station=3) |
| 83 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 84 | GI Channel/Angle/Flat of sizes including clamps |
| 85 | Aluminium Thimble 95 Sq. mm |
| 86 | Aluminium Bus Bar |
| 87 | Aluminium Paint |
| 88 | Busbar Insulator |
| 89 | Nuts and Bolts. |
| 90 | Earthing of substation |
| 91 | 30 mm² ACSR Conductor weasal |
| 92 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 93 | GI Mucky-Clamps for Shackle Insulators |
| 94 | 16kN Shackle Insulators |
| 95 | Additional LT for completion of Creation of 25 KVA at upper Bhadwah W.no 4 of village Gadether A under CDF (1.17Lacs) ( All items are SITC) |
| 96 | 8 mtr. Long Pole(ST-410, SP15) |
| 97 | GI Mucky-Clamps for Shackle Insulators |
| 98 | 30 mm² ACSR Conductor |
| 99 | 16kN Polymer Shackle Insulators |
| 100 | Nuts and Bolts. |
| 101 | Aluminium Paint |
| 102 | Creation of 25 KVA at Kahal Gowari of village Gadether-A along with HT/LT Under DDC Grant (3.0 lacs).( All items are SITC) |
| 103 | 11/0.433kV, 3-phase 25 KVA Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, as per amendment 4 of IS 1180-2014 (Aluminium wound) |
| 104 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type |
| 105 | 11kV Link Set Heavy Duty with Bace Channel 75x40x40x6 mm |
| 106 | 11 kV Horn Gap Fuse Set 3 Phase 200A |
| 107 | 95 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor |
| 108 | 8 Mtr. Long ST Pole (ST-410 SP15)(HT=2,LT=2,S/Station=3) |
| 109 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 110 | GI Channel/Angle/Flat of sizes including clamps |
| 111 | Aluminium Thimble 95 Sq. mm |
| 112 | Aluminium Bus Bar |
| 113 | Aluminium Paint |
| 114 | Busbar Insulator |
| 115 | Nuts and Bolts. |
| 116 | Earthing of substation |
| 117 | 30 mm² ACSR Conductor weasal |
| 118 | 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 119 | GI Mucky-Clamps for Shackle Insulators |
| 120 | 16kN Shackle Insulators Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 No Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender