Bids Are invited for Operation And Maintenance Power House / Power Plant - Bmc For Boiler Pressure Parts Works In Tps-Ii Expn - Ins 001: Scaffolding -0-15 M Height , Ins 002: Scaffolding -15- 22M Height , Ins 003: Scaffolding-22-54 M Height , Ins 004

Issued by Government Departments · Cuddalore, Tamil Nadu
Tender Value
4.72 Crore
Estimated cost
Bid Submission
16 Sep 2026
18 days left
EMD
5.45 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Cuddalore → Tamil Nadu
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Operation And Maintenance Power House / Power Plant - Bmc For Boiler Pressure Parts Works In Tps-Ii Expn - Ins 001: Scaffolding -0-15 M Height , Ins 002: Scaffolding -15- 22M Height , Ins 003: Scaffolding-22-54 M Height , Ins 004: Providing Lagging Up To 60 Mm Thickness , Ins 005: Providing Lagging - More Than60mm And Up To 120 Mm Thick , Ins 006: Providing Lagging - More Than 120 Mm Up To180 Mm Thick , Ins 007: Providing Lagging - More Than 180 Mm Thick , Ins 009: Providing Sheeting , Ins 010: Sheeting And Lagging Removal , Mej01: Repair/Part Replacement Of Mejs , Mej02: Mej Fabrication 2 Lobes , Mej03: Sealpot Return To Combustor Mej Replacement , Mej04: Combustor To Ash Cooler Mej Replacement , Mej05: Ash Cooler Vent / Sp Duct Mej Replacement , Nmej01: Nmej Patch Up Work. , Nmej02: Inspection And External Cleaning Of Nmej/Mej , Nmej03: Preparatory Works For Nmej Replacement & Scaffolding. , Nmej04: Nmej Removal And Laying In Cyclone ,Fbhe ,Back Pass I/L Replacement , Nmej05: Providing Nmej Joint In Cyclone ,Fbhe ,Back Pass I/L , Nmej06: Nmej Removal And Laying In Economizer Duct For Replacement , Nmej07: Providing Nmej Joint In Economizer Duct , Nmej08: Providing Protective Hood Over Nmej / Mej , Plst01: Removal And Re Erection Of Grate Drain Pipes. , Plst02: Platform / Structural Works , Plst03: Plate Cutting For Refractory Inspection With Anchors And Welding With New Plate 300 X 300 Mm After Refractory Filling. , Plst04: Plate Cutting For Refractory Inspection /Eroded Plates With Anchors And Welding With New Plate 1000 X 1000 Mm After Anchor Extension And Refractory Filling. , Plst05: Welding Of Cracks In Fbhe / Cyclone / Seal Boxes /Wind Boxes In Running Meters , Plst06: Preparatory Works For Inspection /Welding Of Cracks In Fbhe / Cyclone / Seal Boxes /Wind Boxes , Plst07: Bed Material Leak On Line Arresting 300 X 300 Mm Box , Plst08: Providing Cooling Fan / Spray System In Hot Refractory Area. , Plst09: Man Power Assistance For Drawal Of Spares From Pcs / Tps-Ii Expansion Sub Stores , Plst10: Thermowell Replacement In Combustor/Fbhe/Cyclone/Sp/Bp. , Plst11: Curved Plate Bending For Cyclone And Ducts , Plst12: Return Leg Sliding Piece Retainer Plate Repair / Welding , Plst13: Lifting Of Fallen Vortex Finder From Cone Bottom To Inlet Duct Level. , Plst14: Cutting Of Fallen Vortex Finder / Occasion. , Plst15: Cutting Of One No Damaged 253 Ma Support Leg Of Vortex Finder , Plst16: Preparation For Vortex Finder Support,Alignment For One Number . , Plst17: Welding Of Support Leg With Preheating , Plst18: Fabrication Of Hanger Bracket And Butt Welding With Old Bracket. , Plst19: Fabrication Of Support Leg Per Number , Plst20: Fabrication Of Support Hanger Box Per Number , Plst21: Erection Of New Vortex Finder , Plst22: Bed Material Leak On Line Arresting 1000 X 1000 Mm Box , Plst23: Bed Material Leak On Line Arresting With Cera Wool And Sodium Silicate , Plst24: Platform Work , Pr 01: Preparatory Works To Attend Hanger Tube Puncture Inside The Pent House Of Back Pass And Punctures In Scw And In Sh3 , Rh2, Evaporator And Economizer , Pr 02: Do Spool Piece Changing Non T91 , Pr 03: Pin Hole Puncture/ Crack / Dent For Carbon And Alloy Steel , Pr 04: Preparatory Works To Attend Tube Puncture In Fbhe Of Sh / Rh Coils , Pr 05: Fbhe Sh/Rh Coil Spool Piece Changing , Pr 06: Coil Lifting For Attending Puncture And Positioning Back , Pr 07: Preparatory Works To Attend Water Wall Puncture By Window Technique , Pr 08: Attending Puncture Using Window Technique : Preparation Of Spool, Windows And Welding Per Spool , Pr 09: Water Wall Spool Piece Changing And Normalizing During Shut Down , Pr 10: Preparation Of Bends For Used As Spools , Pr 11: Preparatory Works To Replace End Cassets,Anti Vibration Plate,Protection Shield. , Pr 12: Removal And Replacement Of End Cassets, Anti Vibration Plates, Protection Shield. , Pr 13: Replacing Spool Of One Number Of T91 Size 38 Mm , Pr 14: Erection Of Scaffolding And Platform For Erecting Sky Climber , Pr 15: Sky Climber Transportation - 16 Meters / 12 Meter , Pr 16: Sky Climber Erection And Dismantling - 16 M/ 12 M , Pr 17: Operation Of Sky Climbers - Man Shift , Pr 18: Changeover Of Sky Climbers , Pr 19: Preventive Maintenance Of Sky Climber , Pr 20: Cleaning Of Sh3 Coils . , Pr 21: Cleaning Of Rh Coils , Pr 22: Cleaning Of Evaporator Coils - 6208Sqm , Pr 23: Cleaning Of Eco Coils - 22920Sqm , Pr 24: Buckstay Cleaning , Pr 25: Checking Of Tightness Of Bolts And Nuts, Studs Of Buckstay, Water Wall Suspension And Scw , Pr 26: Buck Stay Pin And Furnance Guide Rectification , Pr 27: Welding Of Fin Plate With Waterwall / Scw Tube , Pr 28: Replacement/Repair Of Cap Of Nozzle In Combustors,Fbhe,Seal Pot And Ash Coolers.( Ss Material) , Pr 29: Replacement/Repair Of Guide Pipe And Nozzle Assembly In Combustors,Fbhe,Seal Pot And Ash Coolers.( Ss Material) , Pr 30: Opening And Closing Of Manhole Doors - Bolted Type.(Back Pass And Wind Box) , Pr 31: Oh Of Spring Loaded Sv In Ms, Hrh, Drum,Crh, Erv , Pr 32: Oh Of Spring Loaded Sv In Ast, Ssb, Cbd, Scaph And Floating The Respective Valves , Pr 33: Oh Of Air Assisted Safety Valves In Ms Including Floating Of Sv , Pr 34: Oh Of Air Assisted Sv Control Device , Pr 35: Floating Of Sv In Ms, Hrh, Drum,Crh. , Pr 36: Erection Of Temp Platforms For Creep Measurement In Mst/Hrh Piping , Pr 37: Inspection And Checking The Reading Of Pipe Line Supports , Pr 38: Maintenance Of Supports - Min Adjustments Of Displacements , Pr 39: Maintenance Of Supports - Major Rectification , Pr 40: Boiler Drum / Cbd / Ibd/Scaph / Yard Condesate Tank Inspection , Pr 41: Insertion Of Ptd In Hrh, Crh And Removal After Hydrotest , Pr 42: Nozzle Inspection In Sh / Rh Spray Systems Per Occasion , Pr 43: Cleaning Of Prd In S Ling Station , Pr 44: Oh Of S Le Cooler In S Ling Station , Pr 45: Cleaning Of Turbo Separators . , Pr 46: Drum Gauge Glass Replacement , Pr 47: Fbhe Coil Support Dog Bone Rectification , Pr 48: Fbhe Hanger Tube & Coil Support Ss Block Replacement , Pr 49: Radiography Testing Of Weld Joints , Pr 50: Assistance For Radiography Testing , Pr 51: Assistance For Stress Relieving Of Hp Parts / Machine , Pr 52: Water Washing Of Sh, Rh, Evaporator & Eco Coils In Backpass , Pr 53: Welding Of Anchors On Tubes For Refractory Work . , Pr 54: Tube Thickness / Erosion Checking Assistance , Pr 55: Fbhe Dog Bone Replacement , Pr 56: Fbhe Dog Bone Pin Replacement , Pr 57: Fbhe Coil Separator Cl /Sleeve /Thermopad Fabrication And Fixing , Pr 58: Hydrotest Pump Mobilization And Assistance For Hydrotest Including Gagging. , Pr 59: Safety Valve Vent Pipe /Tray Rectification. , Pr 60: Combustor Pent House Inspection / Cleaning Near Roof Header To Check Bed Material Erosion. , Pr 61: Opening And Closing Of Manhole Doors - Bolted Type With Brick. (Combustor,Fbhe,Cyclone Ash Cooler ) , Pr 62: Fbhe Hanger Tube Ss Block Welding (6 Pieces) , Pr 63: Eroded Fin Metal Built Up For The Purpose Of Metal Spray In Kick Off Zone , Pr 64: Eroded Tube Metal Built Up For The Purpose Of Metal Spray In Kick Off Zone , Pr 65: Providing Ss Half Sleeves Both Sides Of A Tube And Joining The Ss Sleeves , Pr 66: Fbhe Connector Plate Rc Work , Pr 67: Fabrication Of Tube End Sleeve From Tube , Pr 68: Fabrication Of Fbhe End Plate. , Pr 69: Hydrotest Inspection Including Gagging. , Pr 070: Cleaning Of Taph Coils , Pr 071: Stress Relieving Of Weld Joints , Pr 072: Cleaning And Servicing Of Hanger And Support , Pr 073: Fbhe/Combustor/Backpass Coil Inspection , Rsb001: Removal And Replacement Of Stuffing Box Packings , Rsb002: Rectification / Replacement Of Lance Tube , Rsb003: Removal And Replacement Of Gear Box , Rsb004: Preventive Mtce/ Cleaning &Lubrication Of Rotating Parts , Rsb005: Replacement Of Nozzles , Rsb006: Attending Flange Leaks , Rsb007: Replacement Coupling/Spider , Rsb 008: Servicing / Overhauling Of Raph Ssb. , Rsb 009: Repairing/Servicing And Refixing Of Raph Poppet Valve. , Ssb 001: Removal And Replacement Of Stuffing Box Packings , Ssb 002: Removal And Replacement Of Feed Tube Packings/ Lubrication , Ssb 003: Removal And Replacement Of Valve Flange Gaskets/Gland Packings , Ssb 004: Retraction Of Stuck Up Blower , Ssb 005: Removal And Replacement Of Lance Tube , Ssb 006: Repairing/Reconditioning Of Drive Units,. , Ssb 007: Replacement Of Nozzles , Ssb 008: Rectification/Reconditioning And Reassembly Of Carriage Unit. , Ssb 009: Preventive Mtce/ Cleaning &Lubrication Of Rotating Parts , Ssb 010: Removal And Replacement Of Gear Box/Carriage Unit , Ssb 011: Removal & Rectification And Refixing Of Stuffing Box , Ssb 012: Sb-Mouth Chock Removal For Lance Tube , Ssb 013: Control Valve - Changing Gland Packing , Ssb014: Replacement Of Valves In Ssb & Rsb System , Ssb 015: Servicing / Overhauling Of Bp Ssb. , Ssb 016: Repairing/Servicing And Refixing Of Bp Ssb Poppet Valve. , Val 01: Removal Of Gland Packings And Replacing With New Packings , Val 02: Bush Assembly Cleaning And Greasing And Changing Of Bush Bearings And Pads For Both Hov And Mov Of Size Up To Dn 150 Mm , Val 03: Bush Assembly Cleaning And Greasing And Changing Of Bush Bearings And Pads In Necessary For Both Hov And Mov Of Size Above Dn 150 Mm , Val 04: Removal, Laping And Changing Of Valve Internals And Reassembly Of Hov Including Nrv , Val 05: Removal / Changing Of Valve Internals And (Lapping If Necessary) And Reassembly Of Mov Of Sizes Upto Dn 150 Mm , Val 06: Removal ,Lapping, Changing Of Valve Internals And Reassembly Of Mov Of Sizes Above Dn 150 Mm , Val 07: Cleaning And Greasing Of Hov And Mov To Ease Mechanical Hardness And Operational Difficulties , Val 08: Replacing The Old/ Defective Valves With New Valves Of Sizes Up To Dn 80 Mm , Val 09: Replacing The Old/ Defective Valves With New Valves Of Sizes Above Dn 80 Mm , Val 10: Removal And Replacement Of Flange Gaskets And Manual Gaskets Of Sizes Up To Dn 80 Mm , Val 11: Removal And Replacement Of Flange Gaskets And Manual Gaskets, Drum Man Hole Gaskets Of Sizes Above Dn 80 Mm , Val 12: On Line Tightening Of Gland Packing And Flange Packing , Val 13: Rectification Of Punctures In Pipe Line , Replacement Of Eroded / Corroded Lines / Rerouting And Modification Of Pipe Lines - Preparatory Works , Val 14: Do Spool Piece Changing 38 Mm And Below , Val 15: Do Spool Piece Changing 39 To 80 Mm And Below , Val 16: Do Spool Piece Changing 81Mm And Above , Val 17: Welding In Valve Maintenace And Pressure Parts Allied Works By Ibr Qualified Welder - Joints 38 Mm And Below , Val 18: Welding In Valve Maintenance And Pressure Parts Allied Works By Ibr Qualified Welder - Joints 39 Mm And Above , Val 19: Replacement Of Cooling Water Hose , Val 20: Gland Replacement Of Spiess Valve , Val 21: Servicing / Overhauling Of Sealpotspiess Valve Assembly. , Val 22: Servicing / Overhauling Of Ash Cooler Spiess Valve Assembly. , Val 23: Ensuring Freeness Of Operation Of Knife Edge Valve , Val 24: Repairing/Servicing And Refixing Of Knife Edge Valve. , Val 25: Fixing Of Knife Edge Valve. , Val 26: Spiess Valve Flange Gasket Replacement , Val 27: Spiess Valve Stem Bend Rectification , Val 28: Spiess Valve Coupler Bolt Replacement , Val 29: Inspection And Cleaning Of Spiess Valve , Val 30: Metalizing Of Eroded Spiess Valve Lance Tip/Lance Tube /Collars , Val31: Valve On Line Gland Leak Arresting , Val32: On Line Leak Arresting Of Valve Bonnet Leak / Flange Leak(12 Bolts) , Val33: On Line Leak Arresting Of Boiler Feed Control Station / Similar Valves Having Pressure Seal Bonnet. , Val 34: Spiess Valve Preventive Maintenance , Val 35: Retraction Of Stuck Up Spiess Valve , Val36: Inspection And Cleaning Of Spray Station / Feed Control Station Valve , Val37: Servicing / Overhauling Of Ebd /Cbd Valve , Val38: Desh/Fcs/M S Stop Valve/Start-Up Vent Valve Servicing/Overhauling , Stdr01: Transportation Of Steel From Pcs To Tsii Expn. Boiler Mtce Stores. (Old Contract) , Stdr02: Transportation Of Insulation Wool Materials/ Refractory Bricks/ Packing Ropes Etc., From Pcs To Ts-Ii Expn Boiler Mtce. Stores. (Old Contract) , Stdr03: Transportation Of Material From Tsii / Bhel Yard To Tsii Expn.

BOQ

Sl. No. Item TitleItem Description
1INS 001: Scaffolding -0-15 m HeightINS 001: Scaffolding -0-15 m Height
2INS 002: Scaffolding -15- 22m HeightINS 002: Scaffolding -15- 22m Height
3INS 003: Scaffolding-22-54 m HeightINS 003: Scaffolding-22-54 m Height
4INS 004: Providing lagging up to 60 mm thicknessINS 004: Providing lagging up to 60 mm thickness
5INS 005: Providing lagging - More than60mm and up to 120 mm thickINS 005: Providing lagging - More than60mm and up to 120 mm thick
6INS 006: Providing lagging - More than 120 mm up to180 mm thickINS 006: Providing lagging - More than 120 mm up to180 mm thick
7INS 007: Providing lagging - More than 180 mm thickINS 007: Providing lagging - More than 180 mm thick
8INS 009: Providing sheetingINS 009: Providing sheeting
9INS 010: Sheeting and lagging removalINS 010: Sheeting and lagging removal
10MEJ01: Repair/part Replacement of MEJsMEJ01: Repair/part Replacement of MEJs
11MEJ02: MEJ fabrication 2 lobesMEJ02: MEJ fabrication 2 lobes
12MEJ03: Sealpot return to Combustor MEJ replacementMEJ03: Sealpot return to Combustor MEJ replacement
13MEJ04: Combustor to Ash cooler MEJ replacementMEJ04: Combustor to Ash cooler MEJ replacement
14MEJ05: Ash cooler vent / SP duct MEJ replacementMEJ05: Ash cooler vent / SP duct MEJ replacement
15NMEJ01: NMEJ patch up work.NMEJ01: NMEJ patch up work.
16NMEJ02: Inspection and external cleaning of NMEJ/MEJNMEJ02: Inspection and external cleaning of NMEJ/MEJ
17NMEJ03: Preparatory works for NMEJ replacement & scaffolding.NMEJ03: Preparatory works for NMEJ replacement & scaffolding.
18NMEJ04: NMEJ removal and Laying in cyclone ,FBHE ,Back pass I/L replacementNMEJ04: NMEJ removal and Laying in cyclone ,FBHE ,Back pass I/L replacement
19NMEJ05: Providing NMEJ joint in cyclone ,FBHE ,Back pass I/LNMEJ05: Providing NMEJ joint in cyclone ,FBHE ,Back pass I/L
20NMEJ06: NMEJ removal and laying in Economizer duct for replacementNMEJ06: NMEJ removal and laying in Economizer duct for replacement
21NMEJ07: Providing NMEJ joint in Economizer ductNMEJ07: Providing NMEJ joint in Economizer duct
22NMEJ08: Providing protective hood over NMEJ / MEJNMEJ08: Providing protective hood over NMEJ / MEJ
23PLST01: Removal and re erection of grate drain pipes.PLST01: Removal and re erection of grate drain pipes.
24PLST02: Platform / Structural worksPLST02: Platform / Structural works
25PLST03: Plate cutting for Refractory inspection with anchors and welding with new plate 300 X 300 mm after refractory filling.PLST03: Plate cutting for Refractory inspection with anchors and welding with new plate 300 X 300 mm after refractory filling.
26PLST04: Plate cutting for Refractory inspection /eroded plates with anchors and welding with new plate 1000 X 1000 mm after anchor extension and refractory filling.PLST04: Plate cutting for Refractory inspection /eroded plates with anchors and welding with new plate 1000 X 1000 mm after anchor extension and refractory filling.
27PLST05: Welding of cracks in FBHE / Cyclone / Seal boxes /Wind boxes in running metersPLST05: Welding of cracks in FBHE / Cyclone / Seal boxes /Wind boxes in running meters
28PLST06: Preparatory works for inspection /welding of cracks in FBHE / Cyclone / Seal boxes /wind boxesPLST06: Preparatory works for inspection /welding of cracks in FBHE / Cyclone / Seal boxes /wind boxes
29PLST07: Bed material leak on line arresting 300 X 300 mm boxPLST07: Bed material leak on line arresting 300 X 300 mm box
30PLST08: Providing cooling fan / spray system in hot refractory area.PLST08: Providing cooling fan / spray system in hot refractory area.
31PLST09: Man power assistance for drawal of spares from PCS / TPS-II expansion sub storesPLST09: Man power assistance for drawal of spares from PCS / TPS-II expansion sub stores
32PLST10: Thermowell replacement in Combustor/FBHE/Cyclone/SP/BP.PLST10: Thermowell replacement in Combustor/FBHE/Cyclone/SP/BP.
33PLST11: Curved Plate bending for cyclone and ductsPLST11: Curved Plate bending for cyclone and ducts
34PLST12: Return leg Sliding piece retainer plate repair / weldingPLST12: Return leg Sliding piece retainer plate repair / welding
35PLST13: Lifting of fallen vortex finder from cone bottom to inlet duct level.PLST13: Lifting of fallen vortex finder from cone bottom to inlet duct level.
36PLST14: Cutting of fallen vortex finder / occasion.PLST14: Cutting of fallen vortex finder / occasion.
37PLST15: Cutting of one no damaged 253 MA support leg of vortex finderPLST15: Cutting of one no damaged 253 MA support leg of vortex finder
38PLST16: Preparation for vortex finder support,Alignment for one number .PLST16: Preparation for vortex finder support,Alignment for one number .
39PLST17: Welding of support leg with preheatingPLST17: Welding of support leg with preheating
40PLST18: Fabrication of hanger bracket and butt welding with old bracket.PLST18: Fabrication of hanger bracket and butt welding with old bracket.
41PLST19: Fabrication of support Leg per numberPLST19: Fabrication of support Leg per number
42PLST20: Fabrication of support hanger box per numberPLST20: Fabrication of support hanger box per number
43PLST21: Erection of new vortex finderPLST21: Erection of new vortex finder
44PLST22: Bed material leak on line arresting 1000 X 1000 mm boxPLST22: Bed material leak on line arresting 1000 X 1000 mm box
45PLST23: Bed material leak on line arresting with cera wool and sodium silicatePLST23: Bed material leak on line arresting with cera wool and sodium silicate
46PLST24: Platform workPLST24: Platform work
47PR 01: Preparatory works to attend hanger tube puncture inside the Pent house of Back pass and punctures in SCW and in SH3 , RH2, evaporator and EconomizerPR 01: Preparatory works to attend hanger tube puncture inside the Pent house of Back pass and punctures in SCW and in SH3 , RH2, evaporator and Economizer
48PR 02: DO spool piece changing non T91PR 02: DO spool piece changing non T91
49PR 03: Pin Hole puncture/ crack / dent for carbon and alloy steelPR 03: Pin Hole puncture/ crack / dent for carbon and alloy steel
50PR 04: Preparatory works to attend tube puncture in FBHE of SH / RH coilsPR 04: Preparatory works to attend tube puncture in FBHE of SH / RH coils
51PR 05: FBHE SH/RH coil spool piece changingPR 05: FBHE SH/RH coil spool piece changing
52PR 06: Coil lifting for attending puncture and positioning backPR 06: Coil lifting for attending puncture and positioning back
53PR 07: Preparatory Works to attend water wall puncture by window techniquePR 07: Preparatory Works to attend water wall puncture by window technique
54PR 08: Attending puncture using window technique : preparation of spool, windows and welding per spoolPR 08: Attending puncture using window technique : preparation of spool, windows and welding per spool
55PR 09: Water wall spool piece Changing and normalizing during shut downPR 09: Water wall spool piece Changing and normalizing during shut down
56PR 10: Preparation of bends for used as spoolsPR 10: Preparation of bends for used as spools
57PR 11: Preparatory works to replace End cassets,Anti vibration plate,Protection shield.PR 11: Preparatory works to replace End cassets,Anti vibration plate,Protection shield.
58PR 12: Removal and replacement of End cassets, Anti vibration plates, protection shield.PR 12: Removal and replacement of End cassets, Anti vibration plates, protection shield.
59PR 13: Replacing spool of one number of T91 size 38 mmPR 13: Replacing spool of one number of T91 size 38 mm
60PR 14: Erection of scaffolding and platform for erecting sky climberPR 14: Erection of scaffolding and platform for erecting sky climber
61PR 15: Sky climber transportation - 16 meters / 12 meterPR 15: Sky climber transportation - 16 meters / 12 meter
62PR 16: Sky climber erection and dismantling - 16 m/ 12 mPR 16: Sky climber erection and dismantling - 16 m/ 12 m
63PR 17: Operation of Sky climbers - man shiftPR 17: Operation of Sky climbers - man shift
64PR 18: Changeover of sky climbersPR 18: Changeover of sky climbers
65PR 19: Preventive maintenance of sky climberPR 19: Preventive maintenance of sky climber
66PR 20: Cleaning of SH3 coils .PR 20: Cleaning of SH3 coils .
67PR 21: Cleaning of RH coilsPR 21: Cleaning of RH coils
68PR 22: Cleaning of evaporator coils - 6208SqmPR 22: Cleaning of evaporator coils - 6208Sqm
69PR 23: Cleaning of ECO coils - 22920SqmPR 23: Cleaning of ECO coils - 22920Sqm
70PR 24: Buckstay cleaningPR 24: Buckstay cleaning
71PR 25: Checking of tightness of bolts and Nuts, studs of buckstay, Water wall suspension and SCWPR 25: Checking of tightness of bolts and Nuts, studs of buckstay, Water wall suspension and SCW
72PR 26: Buck stay pin and furnance guide rectificationPR 26: Buck stay pin and furnance guide rectification
73PR 27: Welding of fin plate with waterwall / scw tubePR 27: Welding of fin plate with waterwall / scw tube
74PR 28: Replacement/Repair of cap of nozzle in Combustors,FBHE,Seal pot and Ash coolers.( SS material)PR 28: Replacement/Repair of cap of nozzle in Combustors,FBHE,Seal pot and Ash coolers.( SS material)
75PR 29: Replacement/Repair of guide pipe and nozzle assembly in Combustors,FBHE,Seal pot and Ash coolers.( SS material)PR 29: Replacement/Repair of guide pipe and nozzle assembly in Combustors,FBHE,Seal pot and Ash coolers.( SS material)
76PR 30: Opening and closing of manhole doors - Bolted type.(Back pass and wind box)PR 30: Opening and closing of manhole doors - Bolted type.(Back pass and wind box)
77PR 31: OH of Spring loaded SV in MS, HRH, DRUM,CRH, ERVPR 31: OH of Spring loaded SV in MS, HRH, DRUM,CRH, ERV
78PR 32: OH of Spring loaded SV in AST, SSB, CBD, SCAPH and floating the respective valvesPR 32: OH of Spring loaded SV in AST, SSB, CBD, SCAPH and floating the respective valves
79PR 33: OH of Air assisted safety valves in MS including floating of SVPR 33: OH of Air assisted safety valves in MS including floating of SV
80PR 34: OH of Air assisted SV Control DevicePR 34: OH of Air assisted SV Control Device
81PR 35: Floating of SV in MS, HRH, DRUM,CRH.PR 35: Floating of SV in MS, HRH, DRUM,CRH.
82PR 36: Erection of temp platforms for creep measurement in MST/HRH pipingPR 36: Erection of temp platforms for creep measurement in MST/HRH piping
83PR 37: Inspection and checking the reading of pipe line supportsPR 37: Inspection and checking the reading of pipe line supports
84PR 38: Maintenance of supports - min adjustments of displacementsPR 38: Maintenance of supports - min adjustments of displacements
85PR 39: Maintenance of supports - major rectificationPR 39: Maintenance of supports - major rectification
86PR 40: Boiler Drum / CBD / IBD/SCAPH / YARD CONDESATE TANK InspectionPR 40: Boiler Drum / CBD / IBD/SCAPH / YARD CONDESATE TANK Inspection
87PR 41: Insertion of PTD in HRH, CRH and removal after HydrotestPR 41: Insertion of PTD in HRH, CRH and removal after Hydrotest
88PR 42: Nozzle Inspection in SH / RH spray systems per occasionPR 42: Nozzle Inspection in SH / RH spray systems per occasion
89PR 43: Cleaning of PRD in Sampling stationPR 43: Cleaning of PRD in Sampling station
90PR 44: OH of sample cooler in Sampling stationPR 44: OH of sample cooler in Sampling station
91PR 45: Cleaning of Turbo Separators .PR 45: Cleaning of Turbo Separators .
92PR 46: Drum gauge glass replacementPR 46: Drum gauge glass replacement
93PR 47: FBHE coil support Dog Bone rectificationPR 47: FBHE coil support Dog Bone rectification
94PR 48: FBHE Hanger tube & coil support SS block replacementPR 48: FBHE Hanger tube & coil support SS block replacement
95PR 49: Radiography testing of weld jointsPR 49: Radiography testing of weld joints
96PR 50: Assistance for Radiography testingPR 50: Assistance for Radiography testing
97PR 51: Assistance for Stress relieving of HP parts / machinePR 51: Assistance for Stress relieving of HP parts / machine
98PR 52: Water washing of SH, RH, Evaporator & Eco coils in BackpassPR 52: Water washing of SH, RH, Evaporator & Eco coils in Backpass
99PR 53: Welding of anchors on tubes for refractory work .PR 53: Welding of anchors on tubes for refractory work .
100PR 54: Tube thickness / erosion checking assistancePR 54: Tube thickness / erosion checking assistance
101PR 55: FBHE dog bone replacementPR 55: FBHE dog bone replacement
102PR 56: FBHE dog bone pin replacementPR 56: FBHE dog bone pin replacement
103PR 57: FBHE coil separator clamp/sleeve /thermopad fabrication and fixingPR 57: FBHE coil separator clamp/sleeve /thermopad fabrication and fixing
104PR 58: Hydrotest pump mobilization and assistance for hydrotest including gagging.PR 58: Hydrotest pump mobilization and assistance for hydrotest including gagging.
105PR 59: Safety valve vent pipe /tray rectification.PR 59: Safety valve vent pipe /tray rectification.
106PR 60: Combustor pent house inspection / cleaning near roof header to check bed material erosion.PR 60: Combustor pent house inspection / cleaning near roof header to check bed material erosion.
107PR 61: Opening and closing of manhole doors - Bolted type with brick. (Combustor,FBHE,cyclone Ash cooler )PR 61: Opening and closing of manhole doors - Bolted type with brick. (Combustor,FBHE,cyclone Ash cooler )
108PR 62: FBHE Hanger tube SS block welding (6 pieces)PR 62: FBHE Hanger tube SS block welding (6 pieces)
109PR 63: Eroded Fin metal built up for the purpose of metal spray in kick off zonePR 63: Eroded Fin metal built up for the purpose of metal spray in kick off zone
110PR 64: Eroded tube metal built up for the purpose of metal spray in kick off zonePR 64: Eroded tube metal built up for the purpose of metal spray in kick off zone
111PR 65: Providing SS half sleeves both sides of a tube and joining the SS sleevesPR 65: Providing SS half sleeves both sides of a tube and joining the SS sleeves
112PR 66: FBHE connector plate RC workPR 66: FBHE connector plate RC work
113PR 67: Fabrication of tube end sleeve from tubePR 67: Fabrication of tube end sleeve from tube
114PR 68: Fabrication of FBHE end plate.PR 68: Fabrication of FBHE end plate.
115PR 69: Hydrotest Inspection including gagging.PR 69: Hydrotest Inspection including gagging.
116PR 070: Cleaning of TAPH coilsPR 070: Cleaning of TAPH coils
117PR 071: Stress relieving of weld jointsPR 071: Stress relieving of weld joints
118PR 072: Cleaning and Servicing of hanger and supportPR 072: Cleaning and Servicing of hanger and support
119PR 073: FBHE/Combustor/Backpass coil inspectionPR 073: FBHE/Combustor/Backpass coil inspection
120RSB001: Removal and replacement of stuffing box packingsRSB001: Removal and replacement of stuffing box packings
121RSB002: Rectification / replacement of lance tubeRSB002: Rectification / replacement of lance tube
122RSB003: Removal and replacement of gear boxRSB003: Removal and replacement of gear box
123RSB004: Preventive Mtce/ Cleaning &lubrication of rotating partsRSB004: Preventive Mtce/ Cleaning &lubrication of rotating parts
124RSB005: Replacement of nozzlesRSB005: Replacement of nozzles
125RSB006: Attending flange leaksRSB006: Attending flange leaks
126RSB007: Replacement coupling/spiderRSB007: Replacement coupling/spider
127RSB 008: Servicing / Overhauling of RAPH SSB.RSB 008: Servicing / Overhauling of RAPH SSB.
128RSB 009: Repairing/Servicing and Refixing of RAPH poppet valve.RSB 009: Repairing/Servicing and Refixing of RAPH poppet valve.
129SSB 001: Removal and replacement of stuffing box packingsSSB 001: Removal and replacement of stuffing box packings
130SSB 002: Removal and replacement of Feed tube packings/ lubricationSSB 002: Removal and replacement of Feed tube packings/ lubrication
131SSB 003: Removal and replacement of valve flange gaskets/gland packingsSSB 003: Removal and replacement of valve flange gaskets/gland packings
132SSB 004: Retraction of stuck up blowerSSB 004: Retraction of stuck up blower
133SSB 005: Removal and replacement of lance tubeSSB 005: Removal and replacement of lance tube
134SSB 006: Repairing/Reconditioning of drive units,.SSB 006: Repairing/Reconditioning of drive units,.
135SSB 007: Replacement of nozzlesSSB 007: Replacement of nozzles
136SSB 008: Rectification/Reconditioning and reassembly of Carriage unit.SSB 008: Rectification/Reconditioning and reassembly of Carriage unit.
137SSB 009: Preventive Mtce/ Cleaning &lubrication of rotating partsSSB 009: Preventive Mtce/ Cleaning &lubrication of rotating parts
138SSB 010: Removal and replacement of gear box/carriage unitSSB 010: Removal and replacement of gear box/carriage unit
139SSB 011: Removal & rectification and refixing of stuffing boxSSB 011: Removal & rectification and refixing of stuffing box
140SSB 012: SB-Mouth chock removal for lance tubeSSB 012: SB-Mouth chock removal for lance tube
141SSB 013: Control Valve - Changing gland packingSSB 013: Control Valve - Changing gland packing
142SSB014: Replacement of valves in SSB & RSB systemSSB014: Replacement of valves in SSB & RSB system
143SSB 015: Servicing / Overhauling of BP SSB.SSB 015: Servicing / Overhauling of BP SSB.
144SSB 016: Repairing/Servicing and Refixing of BP SSB poppet valve.SSB 016: Repairing/Servicing and Refixing of BP SSB poppet valve.
145VAL 01: Removal of gland packings and replacing with new packingsVAL 01: Removal of gland packings and replacing with new packings
146VAL 02: Bush assembly cleaning and greasing and changing of bush bearings and pads for both HOV and MOV of size up to DN 150 mmVAL 02: Bush assembly cleaning and greasing and changing of bush bearings and pads for both HOV and MOV of size up to DN 150 mm
147VAL 03: Bush assembly cleaning and greasing and changing of bush bearings and pads in necessary for both HOV and MOV of size above DN 150 mmVAL 03: Bush assembly cleaning and greasing and changing of bush bearings and pads in necessary for both HOV and MOV of size above DN 150 mm
148VAL 04: Removal, laping and changing of valve internals and reassembly of HOV including NRVVAL 04: Removal, laping and changing of valve internals and reassembly of HOV including NRV
149VAL 05: Removal / changing of valve internals and (Lapping if necessary) and reassembly of MOV of sizes upto DN 150 mmVAL 05: Removal / changing of valve internals and (Lapping if necessary) and reassembly of MOV of sizes upto DN 150 mm
150VAL 06: Removal ,lapping, changing of valve internals and reassembly of MOV of sizes above DN 150 mmVAL 06: Removal ,lapping, changing of valve internals and reassembly of MOV of sizes above DN 150 mm
151VAL 07: Cleaning and greasing of HOV and MOV to ease mechanical Hardness and operational difficultiesVAL 07: Cleaning and greasing of HOV and MOV to ease mechanical Hardness and operational difficulties
152VAL 08: Replacing the old/ defective valves with new valves of sizes up to DN 80 mmVAL 08: Replacing the old/ defective valves with new valves of sizes up to DN 80 mm
153VAL 09: Replacing the old/ defective valves with new valves of sizes above DN 80 mmVAL 09: Replacing the old/ defective valves with new valves of sizes above DN 80 mm
154VAL 10: Removal and replacement of flange gaskets and manual gaskets of sizes up to DN 80 mmVAL 10: Removal and replacement of flange gaskets and manual gaskets of sizes up to DN 80 mm
155VAL 11: Removal and replacement of flange gaskets and manual gaskets, Drum man Hole gaskets of sizes above DN 80 mmVAL 11: Removal and replacement of flange gaskets and manual gaskets, Drum man Hole gaskets of sizes above DN 80 mm
156VAL 12: on line tightening of gland packing and flange packingVAL 12: on line tightening of gland packing and flange packing
157VAL 13: Rectification of punctures in pipe line , replacement of eroded / corroded lines / rerouting and modification of pipe lines - preparatory worksVAL 13: Rectification of punctures in pipe line , replacement of eroded / corroded lines / rerouting and modification of pipe lines - preparatory works
158VAL 14: DO spool piece changing 38 mm and belowVAL 14: DO spool piece changing 38 mm and below
159VAL 15: DO spool piece changing 39 to 80 mm and belowVAL 15: DO spool piece changing 39 to 80 mm and below
160VAL 16: DO spool piece changing 81mm and aboveVAL 16: DO spool piece changing 81mm and above
161VAL 17: Welding in valve maintenace and pressure parts allied works by IBR qualified welder - joints 38 mm and belowVAL 17: Welding in valve maintenace and pressure parts allied works by IBR qualified welder - joints 38 mm and below
162VAL 18: Welding in valve maintenance and pressure parts allied works by IBR qualified welder - joints 39 mm and aboveVAL 18: Welding in valve maintenance and pressure parts allied works by IBR qualified welder - joints 39 mm and above
163VAL 19: Replacement of cooling water HoseVAL 19: Replacement of cooling water Hose
164VAL 20: Gland replacement of Spiess valveVAL 20: Gland replacement of Spiess valve
165VAL 21: Servicing / Overhauling of SealpotSpiess Valve Assembly.VAL 21: Servicing / Overhauling of SealpotSpiess Valve Assembly.
166VAL 22: Servicing / Overhauling of Ash cooler Spiess Valve Assembly.VAL 22: Servicing / Overhauling of Ash cooler Spiess Valve Assembly.
167VAL 23: Ensuring Freeness of Operation of Knife Edge ValveVAL 23: Ensuring Freeness of Operation of Knife Edge Valve
168VAL 24: Repairing/Servicing and Refixing of Knife Edge valve.VAL 24: Repairing/Servicing and Refixing of Knife Edge valve.
169VAL 25: Fixing of Knife Edge valve.VAL 25: Fixing of Knife Edge valve.
170VAL 26: Spiess valve flange gasket replacementVAL 26: Spiess valve flange gasket replacement
171VAL 27: Spiess valve stem bend rectificationVAL 27: Spiess valve stem bend rectification
172VAL 28: Spiess valve coupler bolt replacementVAL 28: Spiess valve coupler bolt replacement
173VAL 29: Inspection and cleaning of Spiess valveVAL 29: Inspection and cleaning of Spiess valve
174VAL 30: Metalizing of eroded spiess valve lance tip/lance tube /collarsVAL 30: Metalizing of eroded spiess valve lance tip/lance tube /collars
175VAL31: Valve on line gland leak arrestingVAL31: Valve on line gland leak arresting
176VAL32: On line leak arresting of Valve bonnet leak / flange leak(12 bolts)VAL32: On line leak arresting of Valve bonnet leak / flange leak(12 bolts)
177VAL33: On line leak arresting of Boiler feed control station / similar valves having pressure seal bonnet.VAL33: On line leak arresting of Boiler feed control station / similar valves having pressure seal bonnet.
178VAL 34: Spiess valve preventive maintenanceVAL 34: Spiess valve preventive maintenance
179VAL 35: Retraction of stuck up spiess valveVAL 35: Retraction of stuck up spiess valve
180VAL36: Inspection and cleaning of spray station / feed control station valveVAL36: Inspection and cleaning of spray station / feed control station valve
181VAL37: Servicing / Overhauling of EBD /CBD valveVAL37: Servicing / Overhauling of EBD /CBD valve
182VAL38: DESH/FCS/M S stop valve/Start-up vent valve Servicing/OverhaulingVAL38: DESH/FCS/M S stop valve/Start-up vent valve Servicing/Overhauling
183STDR01: Transportation of steel from PCS to TSII expn. Boiler Mtce stores. (OLD CONTRACT)STDR01: Transportation of steel from PCS to TSII expn. Boiler Mtce stores. (OLD CONTRACT)
184STDR02: Transportation of insulation wool materials/ Refractory Bricks/ packing ropes etc., from PCS to TS-II expn Boiler Mtce. stores. (OLD CONTRACT)STDR02: Transportation of insulation wool materials/ Refractory Bricks/ packing ropes etc., from PCS to TS-II expn Boiler Mtce. stores. (OLD CONTRACT)
185STDR03: Transportation of material from TSII / BHEL yard to TSII expn.STDR03: Transportation of material from TSII / BHEL yard to TSII expn.

AI Tender Summary

OUR REF NO 57209418
AUTHORITY Government Departments
TENDER VALUE 4.72 Crore
LAST DATE 16-09-2026
Authority
Authority Name Department Of Materials Management
Work Description Bids Are invited for Operation And Maintenance Power House / Power Plant - Bmc For Boiler Pressure Parts Works In Tps-Ii Expn - Ins 001: Scaffolding -0-15 M Height , Ins 002: Scaffolding -15- 22M Height , Ins 003: Scaffolding-22-54 M Height , Ins 004: Providing Lagging Up To 60 Mm Thickness , Ins 005: Providing Lagging - More Than60mm And Up To 120 Mm Thick , Ins 006: Providing Lagging - More Than 120 Mm Up To180 Mm Thick , Ins 007: Providing Lagging - More Than 180 Mm Thick , Ins 009: Providing Sheeting , Ins 010: Sheeting And Lagging Removal , Mej01: Repair/Part Replacement Of Mejs , Mej02: Mej Fabrication 2 Lobes , Mej03: Sealpot Return To Combustor Mej Replacement , Mej04: Combustor To Ash Cooler Mej Replacement , Mej05: Ash Cooler Vent / Sp Duct Mej Replacement , Nmej01: Nmej Patch Up Work. , Nmej02: Inspection And External Cleaning Of Nmej/Mej , Nmej03: Preparatory Works For Nmej Replacement & Scaffolding. , Nmej04: Nmej Removal And Laying In Cyclone ,Fbhe ,Back Pass I/L Replacement , Nmej05: Providing Nmej Joint In Cyclone ,Fbhe ,Back Pass I/L , Nmej06: Nmej Removal And Laying In Economizer Duct For Replacement , Nmej07: Providing Nmej Joint In Economizer Duct , Nmej08: Providing Protective Hood Over Nmej / Mej , Plst01: Removal And Re Erection Of Grate Drain Pipes. , Plst02: Platform / Structural Works , Plst03: Plate Cutting For Refractory Inspection With Anchors And Welding With New Plate 300 X 300 Mm After Refractory Filling. , Plst04: Plate Cutting For Refractory Inspection /Eroded Plates With Anchors And Welding With New Plate 1000 X 1000 Mm After Anchor Extension And Refractory Filling. , Plst05: Welding Of Cracks In Fbhe / Cyclone / Seal Boxes /Wind Boxes In Running Meters , Plst06: Preparatory Works For Inspection /Welding Of Cracks In Fbhe / Cyclone / Seal Boxes /Wind Boxes , Plst07: Bed Material Leak On Line Arresting 300 X 300 Mm Box , Plst08: Providing Cooling Fan / Spray System In Hot Refractory Area. , Plst09: Man Power Assistance For Drawal Of Spares From Pcs / Tps-Ii Expansion Sub Stores , Plst10: Thermowell Replacement In Combustor/Fbhe/Cyclone/Sp/Bp. , Plst11: Curved Plate Bending For Cyclone And Ducts , Plst12: Return Leg Sliding Piece Retainer Plate Repair / Welding , Plst13: Lifting Of Fallen Vortex Finder From Cone Bottom To Inlet Duct Level. , Plst14: Cutting Of Fallen Vortex Finder / Occasion. , Plst15: Cutting Of One No Damaged 253 Ma Support Leg Of Vortex Finder , Plst16: Preparation For Vortex Finder Support,Alignment For One Number . , Plst17: Welding Of Support Leg With Preheating , Plst18: Fabrication Of Hanger Bracket And Butt Welding With Old Bracket. , Plst19: Fabrication Of Support Leg Per Number , Plst20: Fabrication Of Support Hanger Box Per Number , Plst21: Erection Of New Vortex Finder , Plst22: Bed Material Leak On Line Arresting 1000 X 1000 Mm Box , Plst23: Bed Material Leak On Line Arresting With Cera Wool And Sodium Silicate , Plst24: Platform Work , Pr 01: Preparatory Works To Attend Hanger Tube Puncture Inside The Pent House Of Back Pass And Punctures In Scw And In Sh3 , Rh2, Evaporator And Economizer , Pr 02: Do Spool Piece Changing Non T91 , Pr 03: Pin Hole Puncture/ Crack / Dent For Carbon And Alloy Steel , Pr 04: Preparatory Works To Attend Tube Puncture In Fbhe Of Sh / Rh Coils , Pr 05: Fbhe Sh/Rh Coil Spool Piece Changing , Pr 06: Coil Lifting For Attending Puncture And Positioning Back , Pr 07: Preparatory Works To Attend Water Wall Puncture By Window Technique , Pr 08: Attending Puncture Using Window Technique : Preparation Of Spool, Windows And Welding Per Spool , Pr 09: Water Wall Spool Piece Changing And Normalizing During Shut Down , Pr 10: Preparation Of Bends For Used As Spools , Pr 11: Preparatory Works To Replace End Cassets,Anti Vibration Plate,Protection Shield. , Pr 12: Removal And Replacement Of End Cassets, Anti Vibration Plates, Protection Shield. , Pr 13: Replacing Spool Of One Number Of T91 Size 38 Mm , Pr 14: Erection Of Scaffolding And Platform For Erecting Sky Climber , Pr 15: Sky Climber Transportation - 16 Meters / 12 Meter , Pr 16: Sky Climber Erection And Dismantling - 16 M/ 12 M , Pr 17: Operation Of Sky Climbers - Man Shift , Pr 18: Changeover Of Sky Climbers , Pr 19: Preventive Maintenance Of Sky Climber , Pr 20: Cleaning Of Sh3 Coils . , Pr 21: Cleaning Of Rh Coils , Pr 22: Cleaning Of Evaporator Coils - 6208Sqm , Pr 23: Cleaning Of Eco Coils - 22920Sqm , Pr 24: Buckstay Cleaning , Pr 25: Checking Of Tightness Of Bolts And Nuts, Studs Of Buckstay, Water Wall Suspension And Scw , Pr 26: Buck Stay Pin And Furnance Guide Rectification , Pr 27: Welding Of Fin Plate With Waterwall / Scw Tube , Pr 28: Replacement/Repair Of Cap Of Nozzle In Combustors,Fbhe,Seal Pot And Ash Coolers.( Ss Material) , Pr 29: Replacement/Repair Of Guide Pipe And Nozzle Assembly In Combustors,Fbhe,Seal Pot And Ash Coolers.( Ss Material) , Pr 30: Opening And Closing Of Manhole Doors - Bolted Type.(Back Pass And Wind Box) , Pr 31: Oh Of Spring Loaded Sv In Ms, Hrh, Drum,Crh, Erv , Pr 32: Oh Of Spring Loaded Sv In Ast, Ssb, Cbd, Scaph And Floating The Respective Valves , Pr 33: Oh Of Air Assisted Safety Valves In Ms Including Floating Of Sv , Pr 34: Oh Of Air Assisted Sv Control Device , Pr 35: Floating Of Sv In Ms, Hrh, Drum,Crh. , Pr 36: Erection Of Temp Platforms For Creep Measurement In Mst/Hrh Piping , Pr 37: Inspection And Checking The Reading Of Pipe Line Supports , Pr 38: Maintenance Of Supports - Min Adjustments Of Displacements , Pr 39: Maintenance Of Supports - Major Rectification , Pr 40: Boiler Drum / Cbd / Ibd/Scaph / Yard Condesate Tank Inspection , Pr 41: Insertion Of Ptd In Hrh, Crh And Removal After Hydrotest , Pr 42: Nozzle Inspection In Sh / Rh Spray Systems Per Occasion , Pr 43: Cleaning Of Prd In S Ling Station , Pr 44: Oh Of S Le Cooler In S Ling Station , Pr 45: Cleaning Of Turbo Separators . , Pr 46: Drum Gauge Glass Replacement , Pr 47: Fbhe Coil Support Dog Bone Rectification , Pr 48: Fbhe Hanger Tube & Coil Support Ss Block Replacement , Pr 49: Radiography Testing Of Weld Joints , Pr 50: Assistance For Radiography Testing , Pr 51: Assistance For Stress Relieving Of Hp Parts / Machine , Pr 52: Water Washing Of Sh, Rh, Evaporator & Eco Coils In Backpass , Pr 53: Welding Of Anchors On Tubes For Refractory Work . , Pr 54: Tube Thickness / Erosion Checking Assistance , Pr 55: Fbhe Dog Bone Replacement , Pr 56: Fbhe Dog Bone Pin Replacement , Pr 57: Fbhe Coil Separator Cl /Sleeve /Thermopad Fabrication And Fixing , Pr 58: Hydrotest Pump Mobilization And Assistance For Hydrotest Including Gagging. , Pr 59: Safety Valve Vent Pipe /Tray Rectification. , Pr 60: Combustor Pent House Inspection / Cleaning Near Roof Header To Check Bed Material Erosion. , Pr 61: Opening And Closing Of Manhole Doors - Bolted Type With Brick. (Combustor,Fbhe,Cyclone Ash Cooler ) , Pr 62: Fbhe Hanger Tube Ss Block Welding (6 Pieces) , Pr 63: Eroded Fin Metal Built Up For The Purpose Of Metal Spray In Kick Off Zone , Pr 64: Eroded Tube Metal Built Up For The Purpose Of Metal Spray In Kick Off Zone , Pr 65: Providing Ss Half Sleeves Both Sides Of A Tube And Joining The Ss Sleeves , Pr 66: Fbhe Connector Plate Rc Work , Pr 67: Fabrication Of Tube End Sleeve From Tube , Pr 68: Fabrication Of Fbhe End Plate. , Pr 69: Hydrotest Inspection Including Gagging. , Pr 070: Cleaning Of Taph Coils , Pr 071: Stress Relieving Of Weld Joints , Pr 072: Cleaning And Servicing Of Hanger And Support , Pr 073: Fbhe/Combustor/Backpass Coil Inspection , Rsb001: Removal And Replacement Of Stuffing Box Packings , Rsb002: Rectification / Replacement Of Lance Tube , Rsb003: Removal And Replacement Of Gear Box , Rsb004: Preventive Mtce/ Cleaning &Lubrication Of Rotating Parts , Rsb005: Replacement Of Nozzles , Rsb006: Attending Flange Leaks , Rsb007: Replacement Coupling/Spider , Rsb 008: Servicing / Overhauling Of Raph Ssb. , Rsb 009: Repairing/Servicing And Refixing Of Raph Poppet Valve. , Ssb 001: Removal And Replacement Of Stuffing Box Packings , Ssb 002: Removal And Replacement Of Feed Tube Packings/ Lubrication , Ssb 003: Removal And Replacement Of Valve Flange Gaskets/Gland Packings , Ssb 004: Retraction Of Stuck Up Blower , Ssb 005: Removal And Replacement Of Lance Tube , Ssb 006: Repairing/Reconditioning Of Drive Units,. , Ssb 007: Replacement Of Nozzles , Ssb 008: Rectification/Reconditioning And Reassembly Of Carriage Unit. , Ssb 009: Preventive Mtce/ Cleaning &Lubrication Of Rotating Parts , Ssb 010: Removal And Replacement Of Gear Box/Carriage Unit , Ssb 011: Removal & Rectification And Refixing Of Stuffing Box , Ssb 012: Sb-Mouth Chock Removal For Lance Tube , Ssb 013: Control Valve - Changing Gland Packing , Ssb014: Replacement Of Valves In Ssb & Rsb System , Ssb 015: Servicing / Overhauling Of Bp Ssb. , Ssb 016: Repairing/Servicing And Refixing Of Bp Ssb Poppet Valve. , Val 01: Removal Of Gland Packings And Replacing With New Packings , Val 02: Bush Assembly Cleaning And Greasing And Changing Of Bush Bearings And Pads For Both Hov And Mov Of Size Up To Dn 150 Mm , Val 03: Bush Assembly Cleaning And Greasing And Changing Of Bush Bearings And Pads In Necessary For Both Hov And Mov Of Size Above Dn 150 Mm , Val 04: Removal, Laping And Changing Of Valve Internals And Reassembly Of Hov Including Nrv , Val 05: Removal / Changing Of Valve Internals And (Lapping If Necessary) And Reassembly Of Mov Of Sizes Upto Dn 150 Mm , Val 06: Removal ,Lapping, Changing Of Valve Internals And Reassembly Of Mov Of Sizes Above Dn 150 Mm , Val 07: Cleaning And Greasing Of Hov And Mov To Ease Mechanical Hardness And Operational Difficulties , Val 08: Replacing The Old/ Defective Valves With New Valves Of Sizes Up To Dn 80 Mm , Val 09: Replacing The Old/ Defective Valves With New Valves Of Sizes Above Dn 80 Mm , Val 10: Removal And Replacement Of Flange Gaskets And Manual Gaskets Of Sizes Up To Dn 80 Mm , Val 11: Removal And Replacement Of Flange Gaskets And Manual Gaskets, Drum Man Hole Gaskets Of Sizes Above Dn 80 Mm , Val 12: On Line Tightening Of Gland Packing And Flange Packing , Val 13: Rectification Of Punctures In Pipe Line , Replacement Of Eroded / Corroded Lines / Rerouting And Modification Of Pipe Lines - Preparatory Works , Val 14: Do Spool Piece Changing 38 Mm And Below , Val 15: Do Spool Piece Changing 39 To 80 Mm And Below , Val 16: Do Spool Piece Changing 81Mm And Above , Val 17: Welding In Valve Maintenace And Pressure Parts Allied Works By Ibr Qualified Welder - Joints 38 Mm And Below , Val 18: Welding In Valve Maintenance And Pressure Parts Allied Works By Ibr Qualified Welder - Joints 39 Mm And Above , Val 19: Replacement Of Cooling Water Hose , Val 20: Gland Replacement Of Spiess Valve , Val 21: Servicing / Overhauling Of Sealpotspiess Valve Assembly. , Val 22: Servicing / Overhauling Of Ash Cooler Spiess Valve Assembly. , Val 23: Ensuring Freeness Of Operation Of Knife Edge Valve , Val 24: Repairing/Servicing And Refixing Of Knife Edge Valve. , Val 25: Fixing Of Knife Edge Valve. , Val 26: Spiess Valve Flange Gasket Replacement , Val 27: Spiess Valve Stem Bend Rectification , Val 28: Spiess Valve Coupler Bolt Replacement , Val 29: Inspection And Cleaning Of Spiess Valve , Val 30: Metalizing Of Eroded Spiess Valve Lance Tip/Lance Tube /Collars , Val31: Valve On Line Gland Leak Arresting , Val32: On Line Leak Arresting Of Valve Bonnet Leak / Flange Leak(12 Bolts) , Val33: On Line Leak Arresting Of Boiler Feed Control Station / Similar Valves Having Pressure Seal Bonnet. , Val 34: Spiess Valve Preventive Maintenance , Val 35: Retraction Of Stuck Up Spiess Valve , Val36: Inspection And Cleaning Of Spray Station / Feed Control Station Valve , Val37: Servicing / Overhauling Of Ebd /Cbd Valve , Val38: Desh/Fcs/M S Stop Valve/Start-Up Vent Valve Servicing/Overhauling , Stdr01: Transportation Of Steel From Pcs To Tsii Expn. Boiler Mtce Stores. (Old Contract) , Stdr02: Transportation Of Insulation Wool Materials/ Refractory Bricks/ Packing Ropes Etc., From Pcs To Ts-Ii Expn Boiler Mtce. Stores. (Old Contract) , Stdr03: Transportation Of Material From Tsii / Bhel Yard To Tsii Expn.
Basic Detail
Tender No GEM/2026/B/7946307
Bidding Type Tender
Location
City Cuddalore
State Tamil Nadu
Key Dates
Publish Date 26 Aug 2026
Submission Date 16 Sep 2026
Open Date 16 Sep 2026
Finance
Tender Value 4.72 Crore
Tender Fee Ref. Documents
EMD 5.45 Lakhs
Exemption Not Available
Document List
ec52e120-5256-4d48-92e0-ae1880b7e319.pdf
1787551798.xlsx
1787736598.pdf
1787736623.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 26, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Sep 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
pdf

ec52e120-5256-4d48-92e0-ae1880b7e319.pdf

xlsx

1787551798.xlsx

pdf

1787736598.pdf

pdf

1787736623.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders