Bids Are invited for Mri Compatible Injector - System Type , Mri Compatibility , Drive System , Syringe A (Contrast) , Syringe B (Saline) , Flow Rate , Pressure Limit , Volume Range , Injection Phases , Protocol Storage , Kvo (Keep Vein Open) , Delay
Tender Overview
Project Description
Bids Are invited for Mri Compatible Injector - System Type , Mri Compatibility , Drive System , Syringe A (Contrast) , Syringe B (Saline) , Flow Rate , Pressure Limit , Volume Range , Injection Phases , Protocol Storage , Kvo (Keep Vein Open) , Delay Time , Test Injection , User Interface , Power Supply , Mounting , System Should Have Hold And Pause. , Disposable Syringe - 100 Units , Should Perform Preventive Maintenance (2Nos) During Warranty,Amc,Cmc & If Entered Into Amc(Includes Unlimited Breakdown Calls) /Cmc (Which Will Include Spare Replacement, Breakdown Calls). Vendor To Submit Sops For Pms At The Time Of Installation/ Commissioning. This Is Mandatory Requirement. , Vendor To Submit The Technical Data Sheet, Brochure Etc As A Tender Document With Reference To The Quoted Make & Model. Please Mention The Reference Page No., Etc In These Documents Against Each Technical Specifications In The Compliance. , Vendor To Submit List Of Spare Parts/Consumables/Consumable Spares( I.E.Spares Need To Be Replaced At Regular Intervals, Maybe Quarterly/Half Yearly/Yearly Etc.) If Any. Costing To Be Submitted In The Financial Bid , Please Submit Pre Installation Requirements [Electrical, Hvac, Compressed Air Along With Air Pressure Mentioned), Water Requirement (Ro/Di/Distilled Water With Its Pressure, Flow Rate Per Hour) ; If Any Of The Above Is Essential] , Vendor To Submit Details Of Footprint Size & Weight Of The Quoted Model. , Vendor To Submit Power Consumption. , Demo Of The Quoted Model , Will Be Required If So Desired By The User, After The Opening Of The Technical Bid And Prior To Opening Of Financial Bid. This Is For Technical Evaluation. All Technical Specifications Mentioned Above To Be Mandatorily Shown In The Demo Unit. , Users/Installation List: A List Of Installations Of The Quoted Model With The Address And Contact Numbers To Be Provided. , Should Be Ce/Us Fda/Bis/Icmed Approved. , Unpacking And Shifting The Consignment To The Installation Site Is To Be Included In The Vendors Scope Of Supply. Bidder/Manufacturer/Authorized Service Provider Should Take Responsibility To Lift /Shift The Consignment From Unloading Site To The Installation Site. Unloading Site Shall Be Stores Department, Main Building Basement, Tmh. If Needed ,Bidder Has To Arrange For The Labours At No Charge To Tmh. (Before Submitting The Quotation,Bidders May Visit Tmh, To Know Unloading And Installation Site. , Training: , Local Service Support: Should Have Local Office And Service Support/Service Engineer For Attending The Breakdown Calls. Details To Be Submitted. , Response Time: Should Not Be More Than 06 Hrs From Lodging A Breakdown Complaint On Toll Free Or By Email. , Warranty- 2 Years , Warranty And Cmc Should Include A) 2 Preventive Maintenance/ Year And Unlimited Breakdown Calls Along With Spares.B) All Bought Out Items Quoted Along With The Main System (Local/Non-Local) And Ups Should Be Covered. C) Yearly Calibration/Validation/Qa, Testing And Measuring Equipment Used Should Be Traceable To Si Units Through National/ International Standards (As Per Nabl/Nabh Norms). D) Pm Kit If Any. E) All Upgrades/Update, No Seperate Licence Fees Will Be Payable. , Back To Back Assurance To Be Taken By The Supplier From Oem To Supply Spares For Minimum 10 Years And To Be Submitted. , Buyback - Spectris Solaris Ep Sr No - 60268 As Is Where Is Basis. , If 2 Years Warranty, Cmc Per Annum For 8 Years After Warranty And Buyback If Any Wherever Applicable Are Not Adhered To, Tmc Reserves Right To Reject The Offer. , Please Mention Whether Ups Is Required For The Equipment. If So Should Be Included In The Offer. , Only Yes Or No Should Be Mentioned In Compliance Report And Additional Information In Remarks Column. , Please Provide List Of The Consumables/Spares/Reagents/Control/Calibrators (If Any) In Technical Documents And Cost Of The Same Should Be Uploaded In Pdf File In The Financial Documents. , Do Not Mention / Upload Price And Cost In The Technical Documents Otherwise Your Quotation Will Be Disqualified At Technical Stage.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | System Type | System Type |
| 2 | MRI Compatibility | MRI Compatibility |
| 3 | Drive System | Drive System |
| 4 | Syringe A (Contrast) | Syringe A (Contrast) |
| 5 | Syringe B (Saline) | Syringe B (Saline) |
| 6 | Flow Rate | Flow Rate |
| 7 | Pressure Limit | Pressure Limit |
| 8 | Volume Range | Volume Range |
| 9 | Injection Phases | Injection Phases |
| 10 | Protocol Storage | Protocol Storage |
| 11 | KVO (Keep Vein Open) | KVO (Keep Vein Open) |
| 12 | Delay Time | Delay Time |
| 13 | Test Injection | Test Injection |
| 14 | User Interface | User Interface |
| 15 | Power Supply | Power Supply |
| 16 | Mounting | Mounting |
| 17 | System should have Hold and Pause. | System should have Hold and Pause. |
| 18 | Disposable syringe - 100 units | Disposable syringe - 100 units |
| 19 | Should perform preventive maintenance (2nos) during warranty,AMC,CMC & if entered into AMC(includes unlimited breakdown calls) /CMC (which will include spare replacement, breakdown calls). Vendor to submit SOPs for PMS at the time of installation/ commissioning. This is mandatory requirement. | Should perform preventive maintenance (2nos) during warranty,AMC,CMC & if entered into AMC(includes unlimited breakdown calls) /CMC (which will include spare replacement, breakdown calls). Vendor to submit SOPs for PMS at the time of installation/ commissioning. This is mandatory requirement. |
| 20 | Vendor to submit the technical data sheet, brochure etc as a tender document with reference to the quoted make & model. Please mention the reference page no., etc in these documents against each technical specifications in the compliance. | Vendor to submit the technical data sheet, brochure etc as a tender document with reference to the quoted make & model. Please mention the reference page no., etc in these documents against each technical specifications in the compliance. |
| 21 | Vendor to submit list of spare parts/consumables/consumable Spares( i.e.spares need to be replaced at regular intervals, maybe quarterly/half yearly/yearly etc.) if any. Costing to be submitted in the financial bid | Vendor to submit list of spare parts/consumables/consumable Spares( i.e.spares need to be replaced at regular intervals, maybe quarterly/half yearly/yearly etc.) if any. Costing to be submitted in the financial bid |
| 22 | Please submit pre installation requirements [electrical, HVAC, Compressed air along with air pressure mentioned), water requirement (RO/DI/Distilled water with its pressure, flow rate per hour) ; if any of the above is essential] | Please submit pre installation requirements [electrical, HVAC, Compressed air along with air pressure mentioned), water requirement (RO/DI/Distilled water with its pressure, flow rate per hour) ; if any of the above is essential] |
| 23 | Vendor to submit details of footprint size & weight of the quoted model. | Vendor to submit details of footprint size & weight of the quoted model. |
| 24 | Vendor to submit power consumption. | Vendor to submit power consumption. |
| 25 | Demo of the quoted model , will be required if so desired by the user, after the opening of the technical bid and prior to opening of financial bid. This is for technical evaluation. All technical specifications mentioned above to be mandatorily shown in the demo unit. | Demo of the quoted model , will be required if so desired by the user, after the opening of the technical bid and prior to opening of financial bid. This is for technical evaluation. All technical specifications mentioned above to be mandatorily shown in the demo unit. |
| 26 | User's/Installation list: A list of installations of the quoted model with the address and contact numbers to be provided. | User's/Installation list: A list of installations of the quoted model with the address and contact numbers to be provided. |
| 27 | Should be CE/US FDA/BIS/ICMED approved. | Should be CE/US FDA/BIS/ICMED approved. |
| 28 | Unpacking and shifting the consignment to the installation site is to be included in the vendor's scope of supply. Bidder/manufacturer/authorized service provider should take responsibility to lift /shift the consignment from unloading site to the installation site. Unloading site shall be Stores department, Main Building basement, TMH. If needed ,bidder has to arrange for the labours at no charge to TMH. (Before submitting the quotation,bidders may visit TMH, to know unloading and installation site. | Unpacking and shifting the consignment to the installation site is to be included in the vendor's scope of supply. Bidder/manufacturer/authorized service provider should take responsibility to lift /shift the consignment from unloading site to the installation site. Unloading site shall be Stores department, Main Building basement, TMH. If needed ,bidder has to arrange for the labours at no charge to TMH. (Before submitting the quotation,bidders may visit TMH, to know unloading and installation site. |
| 29 | Training: | Training: |
| 30 | Local Service Support: Should have local office and service support/service engineer for attending the breakdown calls. Details to be submitted. | Local Service Support: Should have local office and service support/service engineer for attending the breakdown calls. Details to be submitted. |
| 31 | Response Time: Should not be more than 06 hrs from lodging a breakdown complaint on toll free or by email. | Response Time: Should not be more than 06 hrs from lodging a breakdown complaint on toll free or by email. |
| 32 | Warranty- 2 years | Warranty- 2 years |
| 33 | Warranty and CMC Should include a) 2 preventive maintenance/ year and unlimited breakdown calls along with spares.b) All bought out items quoted along with the main system (local/non-local) and UPS should be covered. c) Yearly calibration/Validation/QA, Testing and measuring equipment used should be traceable to SI units through National/ International standards (as per NABL/NABH norms). d) PM kit if any. e) All upgrades/update, no seperate licence fees will be payable. | Warranty and CMC Should include a) 2 preventive maintenance/ year and unlimited breakdown calls along with spares.b) All bought out items quoted along with the main system (local/non-local) and UPS should be covered. c) Yearly calibration/Validation/QA, Testing and measuring equipment used should be traceable to SI units through National/ International standards (as per NABL/NABH norms). d) PM kit if any. e) All upgrades/update, no seperate licence fees will be payable. |
| 34 | Back to back assurance to be taken by the supplier from OEM to supply spares for minimum 10 years and to be submitted. | Back to back assurance to be taken by the supplier from OEM to supply spares for minimum 10 years and to be submitted. |
| 35 | Buyback - Spectris Solaris EP Sr no - 60268 as is where is basis. | Buyback - Spectris Solaris EP Sr no - 60268 as is where is basis. |
| 36 | If 2 years warranty, CMC per annum for 8 years after warranty and Buyback if any wherever applicable are not adhered to, TMC reserves right to reject the offer. | If 2 years warranty, CMC per annum for 8 years after warranty and Buyback if any wherever applicable are not adhered to, TMC reserves right to reject the offer. |
| 37 | Please mention whether UPS is required for the equipment. If so should be included in the offer. | Please mention whether UPS is required for the equipment. If so should be included in the offer. |
| 38 | Only Yes or No should be mentioned in compliance report and additional information in remarks column. | Only Yes or No should be mentioned in compliance report and additional information in remarks column. |
| 39 | Please provide list of the Consumables/Spares/Reagents/Control/Calibrators (if any) in Technical Documents and cost of the same should be uploaded in PDF file in the Financial Documents. | Please provide list of the Consumables/Spares/Reagents/Control/Calibrators (if any) in Technical Documents and cost of the same should be uploaded in PDF file in the Financial Documents. |
| 40 | Do not mention / upload price and cost in the technical documents otherwise your quotation will be disqualified at technical stage. | Do not mention / upload price and cost in the technical documents otherwise your quotation will be disqualified at technical stage. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender