Tender For A) Repairing Of Engine, Fuel Pump, Clutch System, Brake And Running Maintenance Work Of Tata Model Truck No. Bpm-1318 Deployed At Sarubera Project Under Kuju Area. B) Repairing Of Tata Model School Bus No. 1608 Deployed At Sarubera Project
Tender Overview
Project Description
Tender for A) Repairing Of Engine, Fuel Pump, Clutch System, Brake And Running Maintenance Work Of Tata Model Truck No. Bpm-1318 Deployed At Sarubera Project Under Kuju Area. B) Repairing Of Tata Model School Bus No. 1608 Deployed At Sarubera Project Under Kuju Area.
BOQ
| Sl. No. | Item Description |
| 1 | A) Repairing of Engine, Fuel Pump, Clutch system, Brake and running Maintenance work of Tata model Truck No. BPM-1318 deployed at Sarubera Project under Kuju Area |
| 2 | Wheel Mudguard of 4 wheel side repairing, new making, fitting 1 and welding with support of angle and channel |
| 3 | New front glass fitting along with glass rubber and remaking of 1 glass frame both side and fitting with all required materials |
| 4 | Broken window glass removing, changing with new fitting of velvet channel and setting |
| 5 | Seat and back rest new making of ply and rexine and fitting and 4 fixing in the seat frames |
| 6 | Silencer assly repairing complete new changing with new |
| 7 | Complete repairing and new making of wiring with materials as 1 wire tape, clip, meter set etc |
| 8 | Supply & Fixing of Complete light as head light, tial lamp, body light and combination switch etc. |
| 9 | Supply & Fixing of Rear and front brake shoe with rivet |
| 10 | Supply & Fixing of piston with pin and lock |
| 11 | Supply & Fixing of Liner set |
| 12 | Supply & Fixing of Head valve exhaust and inlet |
| 13 | Supply & Fixing of Valve guide inlet & Exhaust |
| 14 | Supply & Fixing of Valve Typed |
| 15 | Supply & Fixing of Valve Seal inlet. |
| 16 | Supply & Fixing of Piston Ring |
| 17 | Supply & Fixing of Connecting rod |
| 18 | Supply & Fixing of Kit engine overhaul gaskets |
| 19 | Supply & Fixing of Oil Pump assembly |
| 20 | Supply & Fixing of Engine mount pad (Rear & Front) |
| 21 | Supply & Fixing of Clutch plate |
| 22 | Supply & Fixing of Pressure Plate repair kit full |
| 23 | Supply & Fixing of Timing pulley repair kit |
| 24 | Supply & Fixing of Nozzle pipe set |
| 25 | Supply & Fixing of Chasis rear spring U bolt |
| 26 | Full Vehicle service, cleaning and engine servicing mobil & diesel filter changing labour charge |
| 27 | Supply & Fixing of Air Pressure horn complete & pipe set & fitting charges. |
| 28 | Repairing and overhauling of Nozzle |
| 29 | Supply & Fixing of Rear and front Hub stage bolt with nut and washer |
| 30 | Changing of both side kin pin with required lathe work and changing of full with materials |
| 31 | Dismantling of diesel tank, repairing, cleaning and refitting |
| 32 | Machining charge of engine, Alignment of engine, fitting of sleeves & bearing boring setting |
| 33 | Repairing and overhauling of Fuel Pump |
| 34 | Head Machining, Testing and repairing charges |
| 35 | B) Repairing of Tata model School Bus No. 1608 deployed at Sarubera Project under Kuju Area. |
| 36 | Supply & Fixing of Air Tank with Bracket |
| 37 | Supply & Fixing of Diesel Filter Assly |
| 38 | Supply & Fixing of Steering Bend Arm LH |
| 39 | Supply & Fixing of Steering Bend Arm RH |
| 40 | Supply & Fixing of Mobil Filter Assly |
| 41 | Supply & Fixing of Hanger & Center Bearing Cross member |
| 42 | Supply & Fixing of Bevel star & Casing Complete set with bearing |
| 43 | Dashboard Complete repairing making of both paya new & fixing. mounting & Bracket New changing & fitting with bolt etc |
| 44 | Repairing of Chassis, welding, alignment and Doubling with support |
| 45 | Supply & Fixing of Changing U-Bolt & Plate set (Size-20\\") |
| 46 | Floor repairing work As- Changing & welding of angle, seat & resetting |
| 47 | Wheel mudguard of 4 wheel side repairing, new making, fitting and welding with support of angle and channels |
| 48 | Supply & Fixing of Tail Crown Set |
| 49 | Repairing & Making of wiring Harnes and Fitting of Light etc |
| 50 | Supply & Fixing of Brake Booster |
| 51 | Repairing & Overhauling of Fuel Pump, with changing of element D.V., Flywheel & 'O' Ring Kit etc |
| 52 | Supply & Fixing of Nozzle Pipe Set. |
| 53 | Nozzle Repairing & Overhauling |
| 54 | Supply & Fixing of Pressure Plate Assly. |
| 55 | Supply & Fixing of Clutch plate |
| 56 | Supply and Fixing of Radiator assly |
| 57 | Complete Repairing & making of Radiator Bracket & frame |
| 58 | Supply & Fixing of Silencer assly |
| 59 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender