Tender For Rate Contract For Maintenance Works Of Distribution Network/ Emergent Nature Of Works Under The Jurisduction Of Subdivision Khunmoh 2026-27
Tender Value
10 Lakhs
Estimated cost
Bid Submission
08 Sep 2026
11 days left
EMD
20000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Srinagar → Jammu and Kashmir
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Rate Contract For Maintenance Works Of Distribution Network/ Emergent Nature Of Works Under The Jurisduction Of Subdivision Khunmoh 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Providing of skilled labourer alongwith all necessary tools/equipment’s for trimming of branches, cutting of branches , trees in HT/LT corridors as identified by concerned subdivisions for minimising faults or other works [ Complete adherence to safety protocols, labourers experienced in working in electrical systems and employment completely as per Labour laws of the UT] |
| 2 | Providing of unskilled labourer alongwith all necessary tools/equipment’s for helping trimming of branches, cutting of branches , trees in HT/LT corridors as identified by concerned subdivisions for minimising faults or other works [ Complete adherence to safety protocols, labourers experienced in working in electrical systems and employment completely as per Labour laws of the UT] |
| 3 | Supply and fixing of earthing of 8/9Mtr Pole as per J1 Standard (GI Wire of 8 SWG, 115 turns) |
| 4 | Supply and fixing of earthing of 8/9Mtr Pole Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip as per relevant IS. |
| 5 | Providing and laying of cement bottoming for 8/9 mtr pole 0.5 cum / pole 1:2:4 ratio as per standard |
| 6 | Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover |
| 7 | Chemical earthing by way of digging 2.5 mtr deep earth pit embedding a 2ft*2ft*4ftmm thick copper plate as main earthing electrode(38mm Copper) connecting the plate with main control opanel by 10SWG copper wire with 1/2 inch dia full thread brass nuts bolts and washers, refilling the pit with alternate layers of salt charcoal and earth |
| 8 | Supply of paint and Painting of 9/8 mtr poles with two coats of red oxide and two coat of aluminium. |
| 9 | Installation, testing and commissioning of 11 kV Heavy Duty Station type Link Set of Standard Make (400 Amp) as per relevant IS. |
| 10 | Installation, testing and commissioning of 11 kV GO AB Switch Station Type of Standard Make (400 Amp) as per relevant IS.(Note:Link set to be provided by KPDCL) |
| 11 | Installation, testing and commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type as per relevant IS. |
| 12 | Installation, testing and commissioning of DO 11 kV Horn Gap Fuse Set 3 Phase as per relevant IS. |
| 13 | Fixing of 11kV Polymeric composite Pin Insulator 12kV, 10kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 14 | Fixing of 11kV Porcelain Disc Insulator 12kV, 10kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 15 | Installation, testing and commissioning of LT Shackle Insulator with mukki clamps |
| 16 | Installation, testing and commissioning of LT Shackle Insulator with D-clamps(Note:Shcakle with D clamps to be provided by KPDCL) |
| 17 | Fixing of fabricated GI Angle/Channel/Flat/ V-cross with F-top/Pole Collars including nuts and bolts |
| 18 | Fixing of fabricated MS Angle/Channel/Flat/Pole Collars including nuts and bolts |
| 19 | Fixing of Galvanised nuts and bolts |
| 20 | Installation, testing and commissioning 35 mm² AB (HT) Cable (3x35+1x70 insulated) mm² XLPE (11 kV, 3C + Earth) |
| 21 | Dismanteling of 35 mm² AB (HT) Cable (3x35+1x70 insulated) mm² XLPE (11 kV, 3C + Earth) |
| 22 | Installation, testing and commissioning 50 mm² AB (HT) Cable (3x50 + 1x70 insulated )mm² XLPE (11 kV, 3C + Earth) |
| 23 | Dismanteling of 50 mm² AB (HT) Cable (3x50 + 1x70 insulated )mm² XLPE (11 kV, 3C + Earth) |
| 24 | Installation, testing and commissioning 70 mm² AB (HT) Cable (3 x 70 + 1x95 insulated )mm² XLPE (11 kV, 3C + Earth) |
| 25 | Dismanteling of 70 mm² AB (HT) Cable (3 x 70 + 1x95 insulated )mm² XLPE (11 kV, 3C + Earth) |
| 26 | Dismanteling of of 120 mm² AB (HT) Cable (3x120 + 1x95 insulated)mm² XLPE (11 kV, 3C + Earth) |
| 27 | Installation, testing and commissioning of 120 mm² AB (HT) Cable (3x120 + 1x95 insulated)mm² XLPE (11 kV, 3C + Earth) |
| 28 | Installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor termination kit 3-Core [Raychem/3M] |
| 29 | Installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor termination kit Single core [Raychem/3M] |
| 30 | Installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor termination kit 3-Core [Raychem/3M] |
| 31 | Installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor termination kit Single Core [Raychem/3M] |
| 32 | Installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor termination kit 3- Core [Raychem/3M] |
| 33 | Installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor termination kit Single Core [Raychem/3M] |
| 34 | Installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor termination kit 3-Core [Raychem/3M] |
| 35 | Installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor termination kit Single Core [Raychem/3M] |
| 36 | Installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M] |
| 37 | Installation, testing and commissioning of 35 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M] |
| 38 | Installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M] |
| 39 | Installation, testing and commissioning of 50 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M] |
| 40 | Installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M] |
| 41 | Installation, testing and commissioning of 70 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M] |
| 42 | Installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor jointing kit 3-Core [Raychem/3M] |
| 43 | Installation, testing and commissioning of 120 mm² AB (HT) Cable outdoor jointing kit Single Core [Raychem/3M] |
| 44 | Installation, testing and commissioning of 35 mm² AB (LT) Cable ( 3 x 35 + 1 x 16 + 1 x 25 insulated) mm² XLPE (1.1kV, 3+1 C, Al) with proper thimbling, crimping and routing |
| 45 | Dismanteling of 35 mm² AB (LT) Cable ( 3 x 35 + 1 x 16 + 1 x 25 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 46 | Installation, testing and commissioning of 50 mm² AB (LT) Cable ( 3 x 50 + 1 x 16 + 1 x 35 insulated)mm² XLPE (1.1kV, 3+1 C, Al) with proper thimbling, crimping and routing |
| 47 | Dismanteling of 50 mm² AB (LT) Cable ( 3 x 50 + 1 x 16 + 1 x 35 insulated)mm² XLPE (1.1kV, 3+1 C, Al) with proper thimbling, crimping and routing |
| 48 | Installation, testing and commissioning of 70 mm² AB (LT) Cable ( 3 x 70 + 1 x 16 + 1 x 50 insulated) mm² XLPE (1.1kV, 3+1 C, Al) with proper thimbling, crimping and routing |
| 49 | Dismanteling of 70 mm² AB (LT) Cable ( 3 x 70 + 1 x 16 + 1 x 50 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 50 | Installation, testing and commissioning of 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al) with proper thimbling, crimping and routing |
| 51 | Dismanteling of 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al) |
| 52 | Installation, testing and commissioning of 25 mm² Single-Core Cable,1.1kV Grade, XLPE un armoured FRLS type with proper thimbling, crimping and routing |
| 53 | Dismanteling of 25 mm² Single-Core Cable,1.1kV Grade, XLPE un armoured FRLS type with proper thimbling, crimping and routing |
| 54 | Installation, testing and commissioning of 35 mm² Single-Core Cable,1.1kV Grade, XLPE un armoured FRLS type with proper thimbling, crimping and routing |
| 55 | Dismanteling of 35 mm² Single-Core Cable,1.1kV Grade, XLPE un armoured FRLS type |
| 56 | Installation, testing and commissioning of 50 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type with proper thimbling, crimping and |
| 57 | Dismanteling of 50 mm² Single-Core Cable,1.1kV Grade, XLPE un armoured FRLS type |
| 58 | Installation, testing and commissioning of 70 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type with proper thimbling, crimping and routing |
| 59 | Dismanteling of 70 mm² Single-Core Cable,1.1kV Grade, XLPE un armoured FRLS type with proper thimbling, crimping and routing |
| 60 | Installation, testing and commissioning of 185 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type with proper thimbling, crimping and routing |
| 61 | Dismanteling of 185 mm² Single-Core Cable,1.1kV Grade, XLPE un armoured FRLS type with proper thimbling, crimping and routing |
| 62 | Installation, testing and commissioning of 240 mm² Single-Core Cable,1.1k V Grade, XLPE un armoured FRLS type with proper thimbling, crimping and routing |
| 63 | Dismanteling of 240 mm² Single-Core Cable,1.1kV Grade, XLPE un armoured FRLS type |
| 64 | Installation, testing and commissioning of 400 mm² Single-Core Cable,1.1k V Grade, XLPE un armoured FRLS type with proper thimbling, crimping and routing |
| 65 | Dismanteling of 400 mm² Single-Core Cable,1.1kV Grade, XLPE un armoured FRLS type |
| 66 | Installation testing and commissioning of LT cable joint Kits of size 3.5 core |
| 67 | Installation testing and commissioning of LT cable joint Kits of size single core |
| 68 | Dismantling of 8/9 mtr ST Poles and transportation to Divisional Store |
| 69 | Dismantling of PCC Poles and disposal at site |
| 70 | Dismantling of Wooden Poles and transportation to Divisional Store |
| 71 | Laying, stringing and commissioning of 0.03 ACSR Conductor |
| 72 | Dismantling of 0.03 ACSR Conductor |
| 73 | Laying, stringing and commissioning of 0.05 ACSR Conductor |
| 74 | Dismantling of 0.05 ACSR Conductor |
| 75 | Laying, stringing and commissioning of 0.1 ACSR Conductor |
| 76 | Dismantling of 0.1 ACSR Conductor |
| 77 | Dismantling of 0.03/ 0.05/ 0.1 ACSR Conductor and transportation to Divisional Store |
| 78 | Fixing of eye bolts |
| 79 | Fixing of piercing connectors of sizes |
| 80 | Fixing of suspension/ tension clamps with eye-hook |
| 81 | Fixing of aluminium thimble of sizes |
| 82 | Fixing of SL Clamps |
| 83 | Fixing of LT Fuse Set |
| 84 | Fixing of Danger Plates |
| 85 | Fixing of Anti Climbing Devices with clamps |
| 86 | Installation of single phase SMD Box with bus bar (8 Way) |
| 87 | Shifting and installation single phase SMD Box with bus bar (8 Way) |
| 88 | Installation of single phase conventional/ smart meter (existing/ new) (note the material if required for installation of meter shall be provided by contractor) |
| 89 | Shidting of single phase conventional/ smart meter (note the material if required for installation of meter shall be provided by contractor) |
| 90 | Dismantling of Conventional/ Smart meter |
| 91 | Installation of three Phase conventional/ smart meter (existing/ new) (note the material if required for installation of meter shall be provided by contractor) |
| 92 | Installation of three Phase conventional/ smart meter (existing/ new) (note the material if required for installation of meter shall be provided by contractor) |
| 93 | Dismantling of three phase energy meter |
| 94 | Straighting of tilted poles 08/ 09 Mtr long st poles |
| 95 | Installation of LT prodigy meter |
| 96 | Installation of HT tri vector meter |
| 97 | Dismantling of 100/250 KVA transformer and return to divisional store |
| 98 | Dismantling of 400/630 KVA transformer and return to divisional store |
| 99 | Installation of three phase SMD Box with bus bar (12 Way) |
| 100 | Shifting and installation of three phase SMD Box with bus bar (12 Way) |
| 101 | Providing and fixing of GI wire. |
| 102 | Installation of GI wire |
| 103 | Laying, stringing and commissioning of 120 mm sq 3.5 core LT cable |
| 104 | Installation of piercing connectors |
| 105 | Dismantling of 120 mm sq 3.5 core LT Cable |
| 106 | Dismantling of 120 mm sq 3 core LT Cable |
| 107 | Dismantling of 95/85/50/35 mm² 2 Core, 1P 2W Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(1-ɸ, 1N) |
| 108 | Dismantling 95 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 109 | Dismantling 185 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 110 | Dismantling 240 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 111 | Dismantling 300 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 112 | Dismantling 400 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 113 | Dismantling 500 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 114 | Laying, stringing and commissioning of 95/85/50/35 mm² 2 Core, 1P 2W Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(1-ɸ, 1N) |
| 115 | Laying, stringing and commissioning 95 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 116 | Laying, stringing and commissioning 185 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 117 | Laying, stringing and commissioning 240 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 118 | Laying, stringing and commissioning 300 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 119 | Laying, stringing and commissioning 400 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 120 | Laying, stringing and commissioning 500 mm² 3½ Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) |
| 121 | Installation of 11 Mtr long ST pole available at site |
| 122 | Dismantling of 11 Mtr long ST pole |
| 123 | Installation of 9 Mtr long ST pole available at site |
| 124 | Dismantling of 9 Mtr long ST pole |
| 125 | Installation of 8 Mtr long ST pole available at site |
| 126 | Dismantling of 8 Mtr long ST pole |
| 127 | Installation testing and commissioning of 25/ 63 kVA transformer |
| 128 | Installation testing and commissioning of 100/ 200 kVA transformer |
| 129 | Installation testing and commissioning of 250/315 kVA transformer |
| 130 | Installation testing and commissioning of 400/630 kVA transformer |
| 131 | Dismantling of 25/ 63 kVA transformer |
| 132 | Dismantling of 100/ 200 kVA transformer |
| 133 | Dismantling of 250/315 kVA transformer |
| 134 | Dismantling of 400/630 kVA transformer |
| 135 | Installation, testing and commissioning of 300 mm sq HT single core jointing kit |
| 136 | Installation, testing and commissioning of 300 mm sq HT single core jointing kit. |
| 137 | Dismantling/ installation testing and commissioning of 63/100 kVA distribution transformer inside Dal lake and loading and unloading and Transportation from site to Divisional site |
| 138 | Dismantling/ installation testing and commissioning of 200/250 kVA distribution transformer inside Dal lake and loading and unloading and Transportation from site to Divisional site |
| 139 | Dismantling/ installation testing and commissioning of 315/400 kVA distribution transformer inside Dal lake and loading and unloading and Transportation from site to Divisional site |
| 140 | Shifting of street light with proper re-connection (note material if required to be provided by contractor) |
| 141 | Providing of power connection to Streetlight (note material if required to be provided by contractor) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 25, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 08, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysSep 09, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender