Bids Are invited for Facility Management Services - Lumpsum Based - Project Office; Supply, Execution, And Commissioning Of Structural Steel Fabrication And Civil Works; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Re
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - Project Office; Supply, Execution, And Commissioning Of Structural Steel Fabrication And Civil Works; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Reinforced Cement Concrete (M20 Grade): Design, Mixing, Pouring, And Compaction Of M20 Grade Concrete Using Specified Coarse Aggregate Profiles For Foundations And Bed Rafts, Inclusive Of Structural Curing Complete As Per Engineering Codes. , Steel Reinforcement (Tmt Bars Fe-500D): Procurement, Straightening, Cutting, Bending, Hoisting, And Structural Placement Of Thermo-Mechanically Treated Bars For Rcc Works, Arranged In A Double Mesh Layout (12Mm Diameter Bars Spaced At 6 C/C Top & Bottom Mesh). , Structural Steel Fabrication: Built-Up Structural Steel Fabrication Work In Trusses, Framing, And Supporting Skeletons Using Square/Rectangular Hollow Sections (Shs 8 Columns: 4X4, Trusses: 3X3, And Purlins: 1X1), Inclusive Of Precision Cutting, Hoisting, Safety Welding, And Fixing Securely In Position. , Pre-Coated Galvalume Sheets: Supplying And Fixing Profile Pre-Coated Galvalume Weathering Sheets (0.8 Mm Thick, Durable Powder-Coated Finish), Fixed Securely Using Specialized Galvanized Polymer-Coated Self-Drilling Screws Integrated With Epdm Washers (Excluding The Main Structural Steel Framing Backbone). , Extra Carriage/Hoisting Allowance: Specialized Lifting And Structural Logistics Allowance For Handling, Horizontal Transport, And Safe Vertical Hoisting Of Structural Steel Bundles, Cement Bags, Sand, Aggregates, And Roofing Sheets From Ground Zero Up To The Third Floor Roof Location. , Miscellaneous Rooftop Infrastructure Shifting: Strategic Shifting, Line Extension, Anchoring, And Functional Re-Connection Of Pre-Existing Office Utilities, Specifically Domestic Water Storage Tanks, Outdoor Air Conditioning (Ac) Split Units, And Associated Utility Linkages. , Formwork & Shuttering: Providing, Fixing Of Rigid Formwork/Shuttering Layouts Over The Existing Roof Slab, Inclusive Of All Centering Materials, Supporting Scaffolding, And Labor Charges. , Auxiliary Support Civil Labor: Mobilization Of Auxiliary Site Labor For Execution Of Supplementary Civil Adjustments, Site Dressing, Handling Debris, Moving Components, And Cleaning Up Work Spaces.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Reinforced Cement Concrete (M20 Grade): Design, mixing, pouring, and compaction of M20 grade concrete using specified coarse aggregate profiles for foundations and bed rafts, inclusive of structural curing complete as per engineering codes. | Reinforced Cement Concrete (M20 Grade): Design, mixing, pouring, and compaction of M20 grade concrete using specified coarse aggregate profiles for foundations and bed rafts, inclusive of structural curing complete as per engineering codes. |
| 2 | Steel Reinforcement (TMT Bars Fe-500D): Procurement, straightening, cutting, bending, hoisting, and structural placement of Thermo-Mechanically Treated bars for RCC works, arranged in a double mesh layout (12mm diameter bars spaced at 6\\" c/c top & bottom mesh). | Steel Reinforcement (TMT Bars Fe-500D): Procurement, straightening, cutting, bending, hoisting, and structural placement of Thermo-Mechanically Treated bars for RCC works, arranged in a double mesh layout (12mm diameter bars spaced at 6\\" c/c top & bottom mesh). |
| 3 | Structural Steel Fabrication: Built-up structural steel fabrication work in trusses, framing, and supporting skeletons using Square/Rectangular Hollow Sections (SHS 8 Columns: 4\\"x4\\", Trusses: 3\\"x3\\", and Purlins: 1\\"x1\\"), inclusive of precision cutting, hoisting, safety welding, and fixing securely in position. | Structural Steel Fabrication: Built-up structural steel fabrication work in trusses, framing, and supporting skeletons using Square/Rectangular Hollow Sections (SHS 8 Columns: 4\\"x4\\", Trusses: 3\\"x3\\", and Purlins: 1\\"x1\\"), inclusive of precision cutting, hoisting, safety welding, and fixing securely in position. |
| 4 | Pre-coated Galvalume Sheets: Supplying and fixing profile pre-coated Galvalume weathering sheets (0.8 mm thick, durable powder-coated finish), fixed securely using specialized galvanized polymer-coated self-drilling screws integrated with EPDM washers (excluding the main structural steel framing backbone). | Pre-coated Galvalume Sheets: Supplying and fixing profile pre-coated Galvalume weathering sheets (0.8 mm thick, durable powder-coated finish), fixed securely using specialized galvanized polymer-coated self-drilling screws integrated with EPDM washers (excluding the main structural steel framing backbone). |
| 5 | Extra Carriage/Hoisting Allowance: Specialized lifting and structural logistics allowance for handling, horizontal transport, and safe vertical hoisting of structural steel bundles, cement bags, sand, aggregates, and roofing sheets from ground zero up to the Third Floor Roof location. | Extra Carriage/Hoisting Allowance: Specialized lifting and structural logistics allowance for handling, horizontal transport, and safe vertical hoisting of structural steel bundles, cement bags, sand, aggregates, and roofing sheets from ground zero up to the Third Floor Roof location. |
| 6 | Miscellaneous Rooftop Infrastructure Shifting: Strategic shifting, line extension, anchoring, and functional re-connection of pre-existing office utilities, specifically domestic water storage tanks, outdoor air conditioning (AC) split units, and associated utility linkages. | Miscellaneous Rooftop Infrastructure Shifting: Strategic shifting, line extension, anchoring, and functional re-connection of pre-existing office utilities, specifically domestic water storage tanks, outdoor air conditioning (AC) split units, and associated utility linkages. |
| 7 | Formwork & Shuttering: Providing, fixing of rigid formwork/shuttering layouts over the existing roof slab, inclusive of all centering materials, supporting scaffolding, and labor charges. | Formwork & Shuttering: Providing, fixing of rigid formwork/shuttering layouts over the existing roof slab, inclusive of all centering materials, supporting scaffolding, and labor charges. |
| 8 | Auxiliary Support Civil Labor: Mobilization of auxiliary site labor for execution of supplementary civil adjustments, site dressing, handling debris, moving components, and cleaning up work spaces. | Auxiliary Support Civil Labor: Mobilization of auxiliary site labor for execution of supplementary civil adjustments, site dressing, handling debris, moving components, and cleaning up work spaces. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender