Tender For Physical Verification Of Ilmenite Stock At Irel Chavara Plant On Monthly Basis & Physical Verification Of Wip, Raw Materials (Rm), And Mining Output At Chavara Plant, Mining Sites At Vt Mining, Azheekkal & Thottappally Using Total Station
Tender Overview
Project Description
Tender for Physical Verification Of Ilmenite Stock At Irel Chavara Plant On Monthly Basis & Physical Verification Of Wip, Raw Materials (Rm), And Mining Output At Chavara Plant, Mining Sites At Vt Mining, Azheekkal & Thottappally Using Total Station Instrument On Quarterly Basis For Two Years.
BOQ
| Sl. No. | Item Description |
| 1 | Volume calculation of Ilmenite stock stored in Godown Nos. 20 & 21, the Lorry Loading Shed, and any other locations within the Chavara Plant premises as directed by the Company officials, using an Electronic Total Station (ETS) Instrument. The scope shall include the hire charges of the instrument, all conveyance, operating and incidental charges, preparation and submission of volumetric reports with supporting drawings, including soft copies, complete in all respects, for a period of TWO YEARS. The work shall be carried out once every month, or as and when instructed by the Company. In the event that any discrepancy or error is noticed in the submitted volumetric reports with reference to IREL records, the contractor shall, at no additional cost to the Company, re-survey the stock and submit corrected volumetric reports within the time stipulated by the Engineer-in-Charge. Such re-survey and revision shall form part of the contractor's contractual responsibility |
| 2 | Volume calculation of Work-in-Progress (WIP), Raw Materials (RM), and Mining Output at the Chavara Plant and the mining locations at VT Mining, Azheekkal and Thottappally, using an Electronic Total Station (ETS) Instrument. The scope shall include all conveyance, operating and incidental charges, and submission of volumetric reports with supporting drawings, including soft copies, complete in all respects, for a period of TWO YEARS. The work shall be carried out once every quarter, or as and when instructed by the Company. If any discrepancy or error is found in the submitted volumetric reports with reference to IREL records, the contractor shall re-survey the concerned area and submit corrected volumetric reports within the time stipulated by the Engineer-in-Charge, without claiming any additional payment, as the re-survey shall be deemed to be included within the scope of the contract. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender