Tender for Construction Of Pump House, Distribution System, Lowering Of Pump Motor , Construction Of Sluice Valve Chamber And Internal Wiring For Rpws To Ujanga Of Parinuapada Gp Under Rajkanika Block In Kendrapada District
BOQ
| Sl. No. | Item Description |
| 1 | Supplying all labour T&P,for earth work in all kinds of soil within 50 mtr initial lead and 1.5 mtr initial lift including dressing and leveling the bed and site and breaking the clods to maximu 5 cm to 7 cm and laying in layers not exceed 0.30 mtr in depth and as per the direction of Engineer-in-Charge. |
| 2 | Supplying of all labour,T&P,material including taxes for filling in foundation and plinth with sand, well watered,rammed etc complete as per direction of the Engineer - in Charge. |
| 3 | Supplying of all labour,T&P,material including taxes for cement concrete (1:4:8) using 4cm size hard granite crusher broken metal etc. complete as per direction of the Engineer - in Charge. |
| 4 | Supplying all labour,T&P and materials for RCC works in cement concrete (1:1.5:3)with 12mm size crusher broken hard granite chips including hoisting and laying etc. complete as per the direction ofEngineer-In-Charge. |
| 5 | Supplying of all labour,T&P,material including taxes for M.S. reinforcement to RCC works including cutting,bending,binding ,tying the grills and placing in position including cost of binding wire 11 to 20 gauge etc. complete as per direction of the Engineer - in Charge. |
| 6 | Supplying of all labour,T&P,material including taxes for rigid and smooth centering & shuttering to RCC work including false work and dismantling the same after casting etc. complete as per direction of the Engineer - in Charge. |
| 7 | Grade beam |
| 8 | Roof beam |
| 9 | Roof slab |
| 10 | Supplying of all labour,T&P,material including taxes for Ist class Brick work with fly ash Brick having crushing strength between 75kg/cm2 to 149kg/cm2 in cement mortar (1:6) in Foundation & plinth etc. complete as per direction of the Engineer - in Charge. |
| 11 | Supplying of all labour,T&P,material including taxes for Ist class Brick work with Fly Ash Brick having crushing strength between 75kg/cm2 to 149kg/cm2 in cement mortar (1:6) in Supertructure etc. complete as per direction of the Engineer - in Charge. |
| 12 | Supplying of all labour,T&P,material including taxes for 12 mm thick CP in CM (1:6) over the brick work etc. all complete as per direction of the Engineer - in- Charge. |
| 13 | Supplying of all labour,T&P,material including taxes for 16mm thick CP in CM (1:6) over the brick work etc. all complete as per direction of the Engineer - in- Charge. |
| 14 | Supplying of all labour,T&P,material including taxes for providing 25 mmthick grading concrete(1:2:2) over roof slab using 6 mm size etc. all complete as per direction of the Engineer - in- Charge. |
| 15 | Supplying of all labour,T&P,material for making M.S doors and window with supply of materials including fitting and fixing etc. complete as per direction of the Engineer - in Charge. |
| 16 | 25 mm thick A.s flooring in c.c 1:2:4) using 12 mm cbhg chips including watering watering,curing with cost ,carriage,royality ,labour etc all complete as per direction of Engg-in -charge |
| 17 | Supplying all labour materials T& P for finishinfg walls with water proofing weather coat paint of approved shade on new work 2 coats to give aneven shade as per direction of Engg -in Charge |
| 18 | Painting two coats with approved paint to new Iron or wood work over a coat of primer including cost etc all complete as per direction of Engg-in -charge |
| 19 | Provision for writing Basudha Logo |
| 20 | MUMP MOTER ACCESSORIES |
| 21 | Supplying of all labour,T&P,material including taxes for fitting & fixing of ISI marked star labeled three phase vertical stainless steal submersible pump set of 7.50HP (KSB/Kirloskar/Crompton/Texmo/CRI make) having duty of discharge of 7LPS & 45 mtr Head with standby pump set along with suitable control panel board. The starter (conrol panel board) should have ISI marked & reputed make (BCH, Havels,L&T, consisting of CRCA sheet with powder coating to both sides of box including proper locking system,contactor,volt meter,ampere meter,weather proof auto manual switch,shunt capacitor,phase indicator lamp,selector switch & light on-off switch,single phase preventer etc. ,ISI marked required power capacitor.ISI marked PVC insulated & sheathed heavy duty 6 mm2 three core flat cable with copper conductor-80m long.The exposed of flat cable from source to pump house should be encashed with HDPE pipe. The 35 mm2 x 31/2 core round armoured cable of ISI make with aluminium conductor of required length for connecting DP to main switch.Fitting, fixing & lowering of pump set by 80mm dia GI (medium grade) /HDPE Column pipe ( 8 nos ) of 3. 0m long with galvanized flange fittings,rubber insertion, stainless steel rope/ gare weir rope, Glavanized M S Clamp connected through ISI marked PVC insulated & sheathed heavy duty 6 mm2 three core flat cable with copper conductor-24m long. suitable arrangement for rigid fixing of coloumn pipe to the top of the production well with well cap, nut & bolt, well cover connecting the column pipe to the rising main through 100 mm dia G I(medium grade) pipe with accessories for required length including fixing of sluice valve, AR valve, NR valve and 15 mm dia .......kgf/ cm2 brass pressure gauge to be fixed in the pump house through 15 mm dia sch-80 ASTM PVC pipe / G.I. pipe etc. complete with testing,trail running & commissioning as per direction of the Engineer - in Charge. |
| 22 | Submerssible Pump set - 7.50 H P,Dischrge-8LPS, Head -46mtr |
| 23 | Auto Start control panel board |
| 24 | Three core Flat cable 6 sq.mm) |
| 25 | 100 mm dia GI Z Bend |
| 26 | 35 mm2 Round Armod Cable |
| 27 | Brass Pressure gauge of 10kgf/sec prssure |
| 28 | 80mm GI Medium grade flanged collumn pipe 10'0\\"long each |
| 29 | 80mm GI 0.60mtr Short piece one end threaded and other end flanged |
| 30 | 80mm GI Medium grade tripod.6.mtr long each. |
| 31 | 80mm GI clamp to hold collumn pipe |
| 32 | 200mm dia GI fabricated Production Well Cover |
| 33 | GI Nut & Bolt |
| 34 | 6mm thick Rubber insertion |
| 35 | 6mm Stainless steel rope |
| 36 | 32mm HDPE pipe |
| 37 | Lowering , Testing & commissioning . |
| 38 | Construction of Platform arround production well(1.80mx1.80mx1.00m) |
| 39 | Supplying all labour T&P,for earth work in all kinds of soil within 50 mtr initial lead and 1.5 mtr initial lift including dressing and leveling the bed and site and breaking the clods to maximu 5 cm to 7 cm and laying in layers not exceed 0.30 mtr in depth and as per the direction of Engineer-in-Charge. |
| 40 | Supplying of all labour,T&P,material including taxes for filling in foundation and plinth with sand, well watered,rammed etc complete as per direction of the Engineer - in Charge. |
| 41 | Supplying of all labour,T&P,material including taxes for cement concrete (1:4:8) using 4cm size hard granite crusher broken metal etc. complete as per direction of the Engineer - in Charge. |
| 42 | Supplying of all labour,T&P,material including taxes for cement concrete (1:2:4) using 12cm size hard granite crusher broken metal etc. complete as per direction of the Engineer - in Charge. |
| 43 | Supplying of all labour,T&P,material including taxes for Ist class Brick work with K.B Brick having crushing strength between 75kg/cm2 to 149kg/cm2 in cement mortar (1:6) in Foundation & plinth etc. complete as per direction of the Engineer - in Charge. |
| 44 | Supplying of all labour,T&P,material including taxes for 12 mm thick CP in CM (1:6) over the brick work etc. all complete as per direction of the Engineer - in- Charge. |
| 45 | Supplying of all labour,T&P,material including taxes for cement concrete (1:2:4) using 12cm size hard granite crusher broken metal etc. complete as per direction of the Engineer - in Charge. |
| 46 | DISTRIBUTION SYSTEM |
| 47 | Supplying of all labour,T&P,material including taxes for laying in trenches galvanized mild steel tubes (medium grade) with fittings & specials conforming to IS:1239, part-1 of the following nominal bore including testing etc. complete as per specification and direction of Engineer-in-Charge. |
| 48 | 150 mm dia G.I PIPE |
| 49 | 150 mm dia G.I Flange |
| 50 | 151 mm dia G.I Bend |
| 51 | 25 mm dia GI Air Valve |
| 52 | 5/8 \\" Nut Bolt |
| 53 | Rubber Insertion |
| 54 | 150 mm sluice valve |
| 55 | 150 mm dia NR valve |
| 56 | Supplying of all materials, labour and T&P and construction of R C C sluice valve and N.R. Valve chamber as per approved drawing, design & specification. |
| 57 | INTERNAL WIRING TO PUMP HOUSE |
| 58 | PART-A |
| 59 | Surface wiring to light point In sqmm pvc single multistand cupper wire run inside the casing capping with continious running earth including cost of all materials &required labour charges . |
| 60 | a) Short point |
| 61 | b) Medium point |
| 62 | c) Long point |
| 63 | Surface wiring to fan point In sqmm pvc single core multistand cupper wire run inside the casing capping with 5 Amp switch including including cost of all materials &required labour charges .as applicable (Medium Point) |
| 64 | Surface wiring to 3 pin 5 Amp plug point in sqmm pvc single core multistand copper wire in exist boared with connection of running earth |
| 65 | S/F of back light Angle holder |
| 66 | S/F of 10 Amp. Fuse unit |
| 67 | S/F of indicator lamp |
| 68 | S/F of 16 Amp KDP main switch of ISI make on casing board including cost of materials and labourall taxes applicable |
| 69 | PART -B |
| 70 | Supply of 100Amp 415 volt KTPN main switch with fuse unit and nutral bar.The main switch to be fixed on M.S Frame with nuts and bolts by drilling holes on M.S frame complete with all accessories including cost of all materials and earthing connection |
| 71 | Supply of M.S Clamp set for fixing of 4 nos of 100Amp kitkat inside the pump house |
| 72 | Supply of 100Amp kit kat of good quality to be fixed inside the pump house. |
| 73 | Surface wiring of Moter point ,pannel board from 100 Amp Kitkat,main switch by 7/18 pvc copper wire of ISI marked wih the materials required as detailed below. |
| 74 | a)7/18 pvc single core copper wire |
| 75 | b) PVC flexible pipe |
| 76 | c) Flexible pipe saddle |
| 77 | d) No.10 earthing copper wire |
| 78 | e) Anchor bolt 4\\" |
| 79 | f) Nut bolt 1/4\\" |
| 80 | g) Nut bolt 3/16 |
| 81 | h) 10 mm earthing socket |
| 82 | i) 10 mm Ring socket |
| 83 | j) 25 mm Ring socket |
| 84 | k) Nail of different sizes |
| 85 | l) 4 mm thick copper Bush bar plate 12\\" length |
| 86 | S&F standard earthing confirming to I.S 3043/1987 including supplying and fixing of 38 mm/40 mm dia heavy dyty G.I Pipe 3 mtr long confirming to IS 1239Part-I/1990.The pipe shall have 12 mm dia perforted holes at 15 cm interval centre to centre up to 2.5 mtrs height from the botttom.Excavation of pit size of.75 mtr x 3 mtrs.The earth pit shall have alternative layer of charcoal@salt arround the electorode up to a depth of 465 mm from the bottom with fitting and fixing of copper plate of size 12\\"x12\\"x4mm at bottom of the pipe with soldering complete with No 10 copper wire bolted with copper plate |
| 87 | PART-C |
| 88 | Labour charges for Internal single phase and three phase internal wiring Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender