Tender for maintenance and repair To Cwss At Ahilyanagar...Servicing And Repairs To Oltc, Oil Filtration And Allied Works At Jackwell Mula Dam, Dehere Booster Pumping Station And Wtp, Ahilyanagar.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-Aug-2026 | ITEM SPECIFICATION | Other | 09-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Sub Estimate for M&R to CWSS at Ahilyanagar...Servicing and repairs to OLTC, oil filtration and allied works at Jackwell Mula dam, Dehere booster pumping station and WTP, Ahilyanagar. |
| 2 | 1) Filtration of transformer oil conforming to IS 1886: 2000 on site till satisfactory test results. |
| 3 | 2) Supplying and topping up new insulating oil for transformer & OLTC conforming to IS 335 :1993 of approved make with test certificate. |
| 4 | 3) Supplying & erecting silica gel with metal body breather |
| 5 | 4) Inspection & servicing, attending leakage of distribution transformer 11/22/33 KV on HV side and 3.3/0.433 KV on LV side of various capacity of transformers at various locations.The work includes condition monitoring,on site drying to improve IR value,fault diagnosis & solution,overhauling of transformer,disconnecting HV/ LV side cables, tap changer connection, removing all earthing connection etc.For inspection & carrying out necessary test on HV /LV side IE short circuit, ratio test ,checking HV /LV side bushing,minor repair work etc. complete.4.1) Upto 750 KVA |
| 6 | 4) Inspection & servicing, attending leakage of distribution transformer 11/22/33 KV on HV side and 3.3/0.433 KV on LV side of various capacity of transformers at various locations.The work includes condition monitoring,on site drying to improve IR value,fault diagnosis & solution,overhauling of transformer,disconnecting HV/ LV side cables, tap changer connection, removing all earthing connection etc.For inspection & carrying out necessary test on HV /LV side IE short circuit, ratio test ,checking HV /LV side bushing,minor repair work etc. complete.4.2) For above 750 to 3000KVA |
| 7 | 5) Dismantling of CTR make OLTC of 1000 KVA / 11 KV transformer at Mula Dam Jackwell for repairs of damages after removing the connections and draining out the transformer oil. |
| 8 | 6) Supplying & erecting fixed contact units of above OLTC |
| 9 | 7) Supplying & erecting moving contact assembly of above OLTC |
| 10 | 8) Supplying & erecting resistence moving contact assembly of above OLTC |
| 11 | 9) Supplying & erecting transient resistor coil assembly set. |
| 12 | 10) Supplying & erecting top cover oil seal set. |
| 13 | 11) Assembling,testing & commissioning of OLTC after carrying out all repair job as above. |
| 14 | 12) Dismantling of CTR make OLTC of 1600 KVA / 33 KV transformer at Dehere Booster Pumping Station for repairs of damages after removing the connections and draining out the transformer oil. |
| 15 | 13) Supplying & erecting fixed contact units of above OLTC |
| 16 | 14) Supplying & erecting moving contact assembly of above OLTC |
| 17 | 15) Supplying & erecting resistence moving contact assembly of above OLTC ( 2 x 3 nos) |
| 18 | 16) Supplying & erecting transient resistor coil assembly set. ( 2 x 3 nos) |
| 19 | 17) Supplying & erecting top cover oil seal set. |
| 20 | 18) Assembling, testing & commissioning of OLTC after carrying out all repair job as above. |
| 21 | 19) H. T. Capacitor, film plus foil design, vacuum impregnated with N-PCB Oil, internal discharge resistances extended foil design with built-in internal fuses, as per IS-13925 Part-1, Bare Capacitor without any accessories.19.1) 50 KVAR 3.3 KV, 3 ph, 50 C/s A.C. |
| 22 | 19) H. T. Capacitor, film plus foil design, vacuum impregnated with N-PCB Oil, internal discharge resistances extended foil design with built-in internal fuses, as per IS-13925 Part-1, Bare Capacitor without any accessories.19.2) 115 KVAR, 3.3 KV, 3 Ph, 50 C/s A.C. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender