Public Administrative Department Local Bodies Closing in 11 days TDR #57178913

Tender For Installation Of Lighting System And Operation And Maintenance Work For 05 Years On The New Proposed Divider For Road Widening From Barrier No. 2 To Bada Bypass On Pilibhit Bypass Road.

Issued by Local Bodies · Bareilly, Uttar Pradesh
Tender Value
1.29 Crore
Estimated cost
Bid Submission
21 Sep 2026
11 days left
EMD
2.59 Lakhs
Bank guarantee accepted
Document Fee
15000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bareilly → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Installation Of Lighting System And Operation And Maintenance Work For 05 Years On The New Proposed Divider For Road Widening From Barrier No. 2 To Bada Bypass On Pilibhit Bypass Road.

BOQ

Name of Work:- पीलीभीत बाईपास मार्ग पर बैरियर नं0-2 से बड़ा बाईपास तक सड़क चौड़ीकरण हेतु नये प्रस्तावित डिवाईडर पर प्रकाश व्यवस्था की स्थापना एवं 05 वर्ष का संचालन एवं अनुरक्षण का कार्य।
Sl. No. Item Description
1Part ASupply & fixing of 10 mtr GI Octagonal Pole of approved make (top dia 100 mm, Bottom dia 200 mm and base plate 16mm thick) having 3 mm thikness with Double arm bracket 1 Mtr length in 1:2:4 RCC foundation bolt including the cost of foundation, excavation & back filling and Required T&P complete in all respect. (S.I. 21.2.9 PWD SHEDULE 2024) (at the rate of 40416 X 0.8475=34253)
2Supply & fixing of 16 mtr High mast shaft of approved make with rising system hot dip glavanized inside & out side dip,heaving pole sheet thickness 4 mm. Top dia minium 150 mm, Bottom dia 360 mm base plate 32 mm thick suitable for wind velocity as per IS 875 part 3 & having no circumferential weld, with accessories for high mast such as head frame suitable for 6 to 12 luminaries & its control gear boxes 1.5 HP power tool moter, 3 point suspension system with steel wire rope 6 mm dia, double drum winch, including making suitable foundation as per manufature drawing/ site reuiment along with foundation bolts nuts, washers, anchor plates etc complete in all respect. (S.I. 21.3.1, PWD SHEDULE 2024) (at the rate of 291599 X 0.8475=247130)
3LED Street light fixture, powder coated pressure die cast aluminium body (System lumen efficacy >135 Im/Watt). Supplying, Installation, Testing & Commissioning of Street light LED fixture, powder coated pressure die cast aluminium body with built in or separate driver as per the requirement with Driver efficiency >85%, Input voltage: 140-270 Volt AC. frequency 50/60 hz, Operating temp range -5 °C to 50 °C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%,THD < 10% as per IEC 61000-3-2, P. F>0.95, IP-66, IK10, CRI > 70, under voltage and over voltage protection, EMI-EMC as per CISPR15, lenses for beam angle as per IESNA type I/II/ Ill as per the width of the oadand the projectrequirement., suitable to fit in up to 65mm dia pipe, life time (LED,Driver & electrical circuitary) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11 report, CCT 3000°K / 4000°K /5700°K / 6500°K (As per ANSI Bin), SDCM(Standard Deviation Color Matching) <5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in all respect i/c external connections with 1.5 sq mm FRLS/HFFR, PVC insulated copper conductor Single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy >135 Im/Watt output . LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C) complete in all respect. as per D/Ich.Capacity-150 walt (S.I 8.14.17 CPWD SHEDULE 2025 (5090X0.755X0.97=3727.66)
4LED Flood Light, powder coated pressure cast aluminium (System lumen efficacy ≥135 Im/Watt) Supplying. Installation, Testing & Commissioning of Flood Light, powder coated pressure die cast aluminium body with built in or separate driver as per the requirement with Driver efficiency >85%, Input voltage: Input voltage: 140-270 Volt AC,frequency 50/60 hz, Operating temp range -5 °C to 50 °C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%,THD < 10% as per IEC 61000-3-2, P. F.≥0.95, IP-66,IK-10, CRI ≥70, under voltage and over voltage protection,EMIEMC as per CISPR-15, lenses for beam angle 30 deg-120deg as per the application and the project requirement., suitable tilt able fitting, life time (LED, Driver & electrical circuitry) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11 report, CCT 3000°K/ 4000°K / 5700°K /6500°K (As per ANSI Bin) SDCM(Standard Deviation Colour Matching) <5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in all respect i/c external connections with 1.5 sq.mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy >135 Im/Watt output. LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C). complete in all respect. as per D/Ich. Capacity-200 Walt (S.I. 8.17.5 CPWD SHEDULE 2025) cat.AAA (5504X0.755X0.97=4030.85)
5Supply and laying of almunium conductor PVC insulated aromoured served Sheathed cables 1100V grade in Existing RCC/Hime/Metal pipe as directed by Engineer in charge complete in all respect including excavation and refilling. The armouring of the cable shall be properly connected with the earth conductor by clamps etc. (S.I. 20b.1.9, 20b.1.12 LUCKNOW PWD SHEDULE 2024) (at the rate of 283 X 0.8475=240, 527 X 0.8475=447) 16 sqmm 4 Core
650 sqmm 3-1/2 Core
7Supply and Wiring of submains with two nos. of 2.5 sq.mm. FRLSH PVC insulated 1100 V grade single core multistrand copper conductor cable in existing conduit complete with supply of all material labour and T&P required for proper completion of the work as directed at site by Engineer in charge. (S.I. 289, PWD SHEDULE 2018)
8Trenchless boring with more than 2 mtr and upto 6mt below ground level by machine technology including laying of 11000 v HT cable 150mm Sqm to 400 sqmmm size with proper completion of the work. As per per direction of E/I. (Analysis Rate) (UPPCL Cost Data Book 2026)
9Supplying and laying of following size DWC HDPE pipe ISI marked along with all aceesories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, Jointing etc.direct in ground(75cm below ground level), including excavation and refilling the trench but excluding sand cushioning and protective covering etc complete as required. 63mm dia (OD-63 mm& ID-51 mm nominal (S.I. No. 15.16) CPWD/2025 (289.00X0.755X0.97=212)
10Supply and laying of 25mm x 5mm G.I. strip at 0.50 metre below ground as strip earth electrode, including connection/ terminating with G.I. nut, bol, spring, washer etc. as required. (Jointing Shall be done by overlapping and with 2 sets of G.I. nit bolt & spring washer spaced at 50mm) complete in all respect. (S.I. 5.9, CPWD SHEDULE 2025) (at the rate of 160 X0.755X0.97=117)
11Supply and fixing of 50sqmm plain or pin type copper tin plated cable socket ( lug ) to the cable leads, insulating with tape and making connection etc. complete in all respect as per direction of the Engineer-Incharge. (S.I. 504(g) , PWD SHEDULE 2018)
12Earthing with G.I. earth pipe 4.5 meter long, 40mm dia including accessories and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/coke and salt as required. .(S.I. 5.2 , CPWD SHEDULE 2025) (7658.00X0.755X0.97=5608.34)
13Supply and fixing of brass nickle plated compression gland for PVC insulated & armoured served sheathed, underground cable including rubber ring etc. complete in all respect. The armouring of the cable shall be properly connected with the earth as per direction of Engineer Incharge. (50 sqmm 3-1/2 core) (S.I. 503(l) , PWD SHEDULE 2018)
14Supply and fixing of 16 sq. mm plain or pin type copper tin plated cable socket ( lug ) to the cable leads, insulating with tape and making connection etc. complete in all respect as per direction of the Engineer-Incharge. (S.I. 504(d) , PWD SHEDULE 2018)
15making suitable earthing of H.T pole with 2.5 Mt long 20mm dia M.S. rod 7/16 of 6 SWG G.I. wire including the cost of all material labour T&P etc. required for proper completion of the work. AR ( As per UPPCL cost shedule 2026 )
16S&F Tripple pole & Neutral of 5 A to 32 A rating, 240/415 V, 10 kA, \\"C\\" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. ( As per SI 2.10.5 CPWD shedule 2025 ) (1301.00X0.755X0.97=953)
17S/F of Light Class G.I. pipe of 80 mm dia. (nominal) 3metres lenght along the pole for protection of under ground cable as required. (AR S.I. No.13.38 CPWD 2025) (3871X0.755X0.97=2835)
18Supply Installation and Commissioning of 11/0.433 KV \\"copper wound\\" (i) 63 KVA Transformer including loading, unloading, local carriage with all material, labour.Whose GTP Approved in MVVNL having valid CPRI/ERDA type test report] (P.V.S.R.)
19Supply and errection of 11 meter long tubler pole SP 55, 1/6 over all length of pole grouted in cement concrete with 1:3:6 (cement concrete) of pole 30cm above the ground levels including excavation, back filling etc. rates includes all materials, labour, T&P etc. required for proper completion of the work as per E/I .(Analysis Rate) (UPPCL Cost Data Book 2026)
20Painting of electric pole with two coat of aluminum paint over red oxide primer etc all complete PWD SINo.-634/2018
21supply, lnstallaton, Testing and Comurtioming of LT Panel vermin proof floor mounting, M.S. channel base with Bottom and Fabricated out of 2.0/1.6mm thick CRCA sheet steel, painted with powder coated paint of Shade as per the direction of Engineer In-Charge after proper sheet treatment process of sheet steel. The Bus Bar of panel will be of Electrical grade High Conductive Aluminum alloy of appropriate cross section as per rating.Themain bus bar shall run throughout the panel of rating as main incomer rating. The bus bar shall be supported by non homogeneous SMС/DMС bus bar supports which shall be mounted on proper interval to ensure the bear the Perk of short circuit of 50 kA for panels having ACB as incomer & 36kA for panels having MCCB Incomers. Panel shall be constructed in fully segmented Compartment Design for Each Feeder as per 3b constnuction Format. he Panel shall be completed in all respect as per IS: 8623 Par-2&3. There shall be Separate Metering Corparnment for incomer metering and outgoing metering (S.I. 20.1.2 incoming-200Amp-01 No. & out going 100 Amp.-02 No. PWD 2024) (at the rate of 117045 X 0.8475=99196)
22Supplying, Installation, Testing and Commissioning of Astronomical time switch of following configuration to be mounted in feeder pillar/ Lighting DBs for automatic switching On & OFF of street lights at sun set & sun rise or twilight(Auto ON, Auto OFF, Auto modes) with manual override facility with 12/24 hour display format with suitable battery and indication for relay status i/c programming at site complete as required. 3 output (1 output per phase) and suitable for three phase supply ( As per SI 7.4.3 CPWD shedule 2025 ) (11161 X 0.755 X 0.97=8173.76)
23Supply and Laying of 3 core stranded Aluminium Conducter XLPE (Cross linked polyethylene) insulated PVC bedded, galvanized flat steel strip armoured cables confirming to 1.S. 7098 (Part II with latest |amendments) 11 KV građe in existing open masonary duct as directed by Engineer in Charge complete in all respect including excavation and refilling The armouring of the cable shall be properly connected with the earth conductor by clamps ete, (at the rate of 1535 X 0.8475=1301)(As per SI 20b.2.1 PWD-2024) 70sqmm 3 core
24S/F and jointing of following sizes out door/ Indoor type (Heat shrinkable) Jointing Kit for 11 KV grade cable (Outdoor type 70 Sqmm) (P.V.S.R.)
25S/F of 11 KV T.P.M.O set complete in all respect. AR ( As per UPPCL cost sehedule 2026 )
26S/F of 11 KV D.O. fuse set complete in all respect. AR (As per UPPCL cost sehedule 2026)
27Supplying and errection of three piece nonlinear resistor type lightning arrestor suitable for 3 wire, 11 KV overhead lines with rated voltage 9 KV (rms) with a nominal discharge current rating of 5 KA and complete with galvanised clamping arrangement, G.I. bolts, nuts, washers etc. as required (S.I. No.14.13 CPWD 2025 ) 2854X0.755X0.97=2090.13)
28S/F of danger Board complete with clamps, bolts & nut complete in all respect as per direction of E/I. (UPPCL Cost Data Book 2026)
29supplying and erection of 50 mm X 8 mm M.S. flat iron pole top bracket/cross arm for single 11/22/33 KV over head line conductor complete with fixing clamps, bolts, nuts and washers drilling holes for insulator pins, bolts and nuts etc and painting with primer and finish paint as required (S.I. 14.3 CPWD Shedule 2025) (716.00X0.755X0.97=524.36)
30Supplying and erection of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) cross arm for two 11 KV over head line conductors complete with 50 mm X 50 mm X 6 mm (angle iron bracket welded to the channel iron and complete with 50 mm X 6mm M.S. flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts, nuts and washers etc (as per drawing) and painting with primer and finish paint as required.(S.I. 14.4 CPWD Shedule 2025) (2604.00X0.755X0.97=1907.04)
31Supply and fixing of 2 metres high cage fabricated with 3mm thick expanded metal fixed on 50mm x 50mm x 6mm angle iron frame having vertical members spaced at 1 to 1.25 mts and horizontal members spaced at 1 mt. The vertical members shall be grounted in floor and horizontal members in the wall to a depth of 300mm with ends forked. The cage shall have 2000mm x 1000mm size one leaf door with locking device having door frame fabricated with 35mm x 35mm x 6mm angle iron and 3mm expanded metal duly fixed with the cage member with hinges etc. The cage shall be painted with red oxide primer and synthetic enamel paint. The job includes all materials, labour, T&P etc. for proper completion of work. (S.I. 1142 PWD Shedule 2018)
32Part -B for MaintenanceOnly For Operational Charge For One Year (0.50%) On Part-A
332nd Year (0.5%) Operation Charge On Part-A
343rd Year (.75%) Operation & Maintanance Charge On Part-A
354th Year (1%) Operation & Maintanance Charge On Part-A
365thYear (1.25%) Operation & Maintanance Charge On Part-A Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57178913
AUTHORITY Local Bodies
TENDER VALUE 1.29 Crore
LAST DATE 21-09-2026
Authority
Authority Name Bareilly Development Authority
Work Description Tender for Installation Of Lighting System And Operation And Maintenance Work For 05 Years On The New Proposed Divider For Road Widening From Barrier No. 2 To Bada Bypass On Pilibhit Bypass Road.
Basic Detail
Tender No T-23/2026/14
Bidding Type Tender
Location
City Bareilly
State Uttar Pradesh
Key Dates
Publish Date 24 Aug 2026
Submission Date 21 Sep 2026
Open Date 22 Sep 2026
Finance
Tender Value 1.29 Crore
Tender Fee 15000
EMD 2.59 Lakhs
Exemption Not Available
Document List
4fe661df-44bc-4f52-8a75-1dbb7be1abfa.html
BOQ_2217886.xls
TenderDocument.pdf
Tendernotice_1 (63).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 24, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days
Sep 22, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 12 days

Tender Documents

Download All (ZIP) ↓
html

4fe661df-44bc-4f52-8a75-1dbb7be1abfa.html

xls

BOQ_2217886.xls

pdf

TenderDocument.pdf

pdf

Tendernotice_1 (63).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders