Supply Of Set of Contactor & MPCB for Blower and c [Set of Contactor & MPCB for Blower and condenser motors of 15 TR RMPU of AC BHEL EMU rake. Set consists of following, (1) Contactors - 3P (3NO), 415V AC, 50Hz, 9A-110V DC coil. Motor Power 4 KW Conf
Tender Overview
Project Description
Supply Of set of contactor & mpcb for blower and c [set of contactor & mpcb for blower and condenser motors of 15 tr rmpu of ac bhel emu rake. set consists of following, (1) contactors - 3p (3no), 415v ac, 50hz, 9a-110v dc coil. motor power 4 kw confirming to iec 60947-4-1 ac-3. aux contact-(1no+1 nc) width - 45 mm (+/-) 2 mounting support - din rail (2) mpcb-3p, 4-6.3a 415v ac, 50hz trip unit technology - thermal magnetic, breaking capacity (icu): 100 k a motor power 2.2 kw confirming to iec 60947-4-1 ac-3. width - 45mm (+/-)2 mounting support - din rail. (3) auxiliary contact block - (1no+1nc), mounting location - front. one set consists of 1 no. of each of above items (total 3 nos). make: abb or siemens or schneider. all items of set should be of same make. the material should be procured from oem or its authorized dealer. an authorization certificate must be submitted by the firm, during offer, otherwise the offer will not be evaluated.] , set of contactor & mpcb for blower and condenser motors of 15 tr rmpu of ac bhel emu ra ke. set consists of following, (1) contactors - 3p (3no), 415v ac, 50hz, 9a-110v dc coil. motor power 4 kw confirming to iec 60947-4-1 ac-3. aux contact-(1no+1 nc) width - 45 mm (+/-) 2 mounting support - din rail (2) mpcb-3p, 4-6.3a 415v ac, 50hz trip unit technology - thermal magnetic, breaking capacity (icu): 100 k a motor power 2.2 kw confirming to iec 60947-4-1 ac-3. width - 45mm (+/-)2 mounting support - di n rail. (3) auxiliary contact block - (1no+1nc), mounting location - front. one set consists of 1 no. of each of above items (total 3 nos). make: abb or siemens or schneider. all items of set should be of same make. the material should be procured from oem or its authorized dealer. an authorization certificate must be su bmitted by the firm, during offer, otherwise the offer will not be evaluated. [ warranty period: 30 months after the date of delivery ] ]
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender