Tender For Yamuna Nagar Town , Supply, Installation, Testing And Commissioning Of Electromagnetic Flow Meters, Do Sensors, Level Sensors, Dataloggers, Scada System With Cloud Dashboard, Networking And Electrical Works , Including Civil, Electrical An
Tender Overview
Project Description
Tender for Yamuna Nagar Town , Supply, Installation, Testing And Commissioning Of Electromagnetic Flow Meters, Do Sensors, Level Sensors, Dataloggers, Scada System With Cloud Dashboard, Networking And Electrical Works , Including Civil, Electrical And Associated Scada Works.At 20 Mld Stp Radaur Road Yamuna Nagar, Block Jagadhri, Constituency Yamuna Nagar District Yamuna Nagar. (Jha Under Amrut 2.0). Replacement Of Pumping Machinery, Design,Supply, Installation And Testing Of Vfd Along With Distribution Panel, Allied Civil Work And Fixing Of Outfall Delivery And All Other Works Contingent Thereto.
BOQ
| Sl. No. | Item Description |
| 1 | Sub Head No.2 N.S.Items |
| 2 | Design, Supply, installation and testing of VFD along with distribution panel in enclosure for motor rating of 65HP. Enclosure shall be IP54. The panel shall be equipped with MCCB TP with suitable rating, Spreader link TP, Extended rotary handle, Volt meter digital, Volt selector switch, Amp meter, Amp selector switch, C.T with suitable rating, Control MCB SP with suitable rating, PLA Relay, Pushbutton red plus green with element, Indicator ON/Off, Aluminium Bus bar/suitable rating power and Control wiring labour and margin, Fabrication with minimum Sheet thickness of 2 mm for load bearing and non-load bearing side. VFD should be capable of protecting motor from high and low voltage and earth fault as well. VFD should restrict harmonics up to 35% VFD should be capable of providing starting torque up to 200% while starting motor. It should have class 3C3 (Avg)conformal coating so that components are safe from dust and moisture. Communication -Built-in RS485 Modbus RTU, Ambient Temperature -Heavy Duty: -10 ~ 50 deg C Normal Duty: -10 ~ 40 deg C, PCB Protection Conformal Coating complying to IEC 60721-3-3 class 3C3, Application Humidity Below relative humidity 95% RH (no condensation) Altitude 0 to 1,000 m Without deration 1,001 to 4,000 m With deration of 1% per rise in 100 m, Vibration Up to 9.8 m/sec2 (1.0 G), Global Compliance CE, UL, RoHS, Control Method V/F Control, sensorless Vector Control, Slip Compensation, Closed Loop Vector Control. Starting Torque 200% at 0.5Hz in Sensorless Vector Control and 150% at 3Hz in V/F, Frequency Control Range 0 to 400Hz in V/F, 0 to 300Hz in Sensorless 1, 0 to 120Hz in Sensorless 2 / Vector, Frequency Precision Setting- Digital: 0.01Hz, Analog: 0.03Hz (60Hz Base). complete with all other accessories as required. (For non clog submersible Pump) |
| 3 | Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 15 m as per the indicated requirements of discharge in 11458 LPM and power capacity in 65 BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect.@@ |
| 4 | Supplying, erection, testing and commissioning of Horizontal motor pumping set non clog for sewerage having head 15 m as per the indicated requirements of discharge in 14000 LPM and power capacity in 80 BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect. ## |
| 5 | Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having 60 HP as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked includingall accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect (Discharge Capacity - Power Capacity (BHP) -100 HP At Shadipur IPS |
| 6 | Design, Supply, installation and testing of VFD along with distribution panel in enclosure for motor rating of 100 HP. Enclosure shall be IP54. The panel shall be equipped with MCCB TP with suitable rating, Spreader link TP, Extended rotary handle, Volt meter digital, Volt selector switch, Amp meter, Amp selector switch, C.T with suitable rating, Control MCB SP with suitable rating, PLA Relay, Pushbutton red plus green with element, Indicator ON/Off, Aluminium Bus bar/suitable rating power and Control wiring labour and margin, Fabrication with minimum Sheet thickness of 2 mm for load bearing and non-load bearing side. VFD should be capable of protecting motor from high and low voltage and earth fault as well. VFD should restrict harmonics up to 35% VFD should be capable of providing starting torque up to 200% while starting motor. It should have class 3C3 (Avg)conformal coating so that components are safe from dust and moisture. Communication -Built-in RS485 Modbus RTU, Ambient Temperature -Heavy Duty: -10 ~ 50 deg C Normal Duty: -10 ~ 40 deg C, PCB Protection Conformal Coating complying to IEC 60721-3-3 class 3C3, Application Humidity Below relative humidity 95% RH (no condensation) Altitude 0 to 1,000 m Without deration 1,001 to 4,000 m With deration of 1% per rise in 100 m, Vibration Up to 9.8 m/sec2 (1.0 G), Global Compliance CE, UL, RoHS, Control Method V/F Control, Sensorless Vector Control, Slip Compensation, Closed Loop Vector Control. Starting Torque 200% at 0.5Hz in Sensorless Vector Control and 150% at 3Hz in V/F, Frequency Control Range 0 to 400Hz in V/F, 0 to 300Hz in Sensorless 1, 0 to 120Hz in Sensorless 2 / Vector, Frequency Precision Setting- Digital: 0.01Hz, Analog: 0.03Hz (60Hz Base). complete with all other accessories as required. (For non clog submersible Pump) |
| 7 | Design, Supply, installation and testing of VFD along with distribution panel in enclosure for motor rating of 80 HP. Enclosure shall be IP54. The panel shall be equipped with MCCB TP with suitable rating, Spreader link TP, Extended rotary handle, Volt meter digital, Volt selector switch, Amp meter, Amp selector switch, C.T with suitable rating, Control MCB SP with suitable rating, PLA Relay, Pushbutton red plus green with element, Indicator ON/Off, Aluminium Bus bar/suitable rating power and Control wiring labour and margin, Fabrication with minimum Sheet thickness of 2 mm for load bearing and non-load bearing side. VFD should be capable of protecting motor from high and low voltage and earth fault as well. VFD should restrict harmonics up to 35% VFD should be capable of providing starting torque up to 200% while starting motor. It should have class 3C3 (Avg)conformal coating so that components are safe from dust and moisture. Communication -Built-in RS485 Modbus RTU, Ambient Temperature -Heavy Duty: -10 ~ 50 deg C Normal Duty: -10 ~ 40 deg C, PCB Protection Conformal Coating complying to IEC 60721-3-3 class 3C3, Application Humidity Below relative humidity 95% RH (no condensation) Altitude 0 to 1,000 m Without deration 1,001 to 4,000 m With deration of 1% per rise in 100 m, Vibration Up to 9.8 m/sec2 (1.0 G), Global Compliance CE, UL, RoHS, Control Method V/F Control, Sensorless Vector Control, Slip Compensation, Closed Loop Vector Control. Starting Torque 200% at 0.5Hz in Sensorless Vector Control and 150% at 3Hz in V/F, Frequency Control Range 0 to 400Hz in V/F, 0 to 300Hz in Sensorless 1, 0 to 120Hz in Sensorless 2 / Vector, Frequency Precision Setting- Digital: 0.01Hz, Analog: 0.03Hz (60Hz Base). complete with all other accessories as required. (For Horizontal non clog Pump) (80 HP)** |
| 8 | Sub Head No. I HSR Items (Civil Works) |
| 9 | Replacement of Pumping Machinery, Design,Supply, Installation and testing of VFD along with distribution panel, allied civil work and fixing of outfall delivery and all other works contingent thereto.` Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender