Power Government Departments Closing in 7 days TDR #57168808

Tender For Various Works Under The Full Deposit Scheme Head, In The Area Of The Assistant Engineer (Technical-Suzru) Under The Executive Engineer, Electricity Urban Distribution Division (Technical), Muzaffarnagar To Be Executed On A Running Contract Basi

Issued by Government Departments · Muzaffarnagar, Uttar Pradesh
Tender Value
20 Lakhs
Estimated cost
Bid Submission
31 Aug 2026
7 days left
EMD
20000
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Muzaffarnagar → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Various Works Under The Full Deposit Scheme Head, In The Area Of The Assistant Engineer (Technical-Suzru) Under The Executive Engineer, Electricity Urban Distribution Division (Technical), Muzaffarnagar To Be Executed On A Running Contract Basis- St Pole 11/13 Mtrs. Long Pcc Pole 11 Mtrs. Long Pcc Pole 8.5/9.0 Mtrs. Long Stp Pole 9.0 Mtrs Long 11Kv Xlpe Cable 3X70/3X120/3X185/3X300 Sq.Mm 33Kv Xlpe Cable 3X120/3X185/3X300 Sq.Mm Single Phase Ab Cable 35/50/95 Sq.Mm Three Phase Ab Cable 3X50/3X95/3X120 Sq.Mm 11 Kv Ct/Pt Unit 33 Kv Ct/Pt Unit 11 Kv Metering Cubical 33 Kv Metering Cubical Acsr Weasel Conductor Acsr Dog Conductor Acsr Rabbit Conductor Acsr Panthar Conductor 11 Kv Vcb 33 Kv/11 Kv Jointing Kit Outdoor/Indoor Carriage Of Following Capacity Transformer From Electricity Store Center, Muzaffarnagar To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge From Je Store/Store Center Muzaffarnagar/Other Store Center Within The Range Of 0-50 Km). (A) 10/16 Kva (B) 25/63/100 Kva (C) 250 To 400 Kva Erection Of 11Kv Four-Pole Structure After Digging Of Suitable Pits On Following Pole With Fabrication And Fixing Of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 Kv Pin Insulator With Pin, Disc Insulator With Disc Fitting Etc., As Per Respo Norms By Providing All Clamps Made Of M.S. Flat Of Size 65X6 Mm With Proper Size Nuts And Bolts And Stone Pad With Jumpering Etc Work, And As Per Direction Of Site Incharge. All Clamp & Nut Bolt Will Be Provided By Contractor. Pcc Pole 8.5 Mtrs/9 Mtrs Pcc Pole 11 Mtrs St Pole 13 Mtrs Erection Of 33Kv Four-Pole Structure After Digging Of Suitable Pits On Following Pole With Fabrication And Fixing Of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 33 Kv Pin Insulator With Pin, Disc Insulator With Disc Fitting Etc., As Per Respo Norms By Providing All Clamps Made Of M.S. Flat Of Size 65X8 Mm With Proper Size Nuts And Bolts And Stone Pad With Jumpering Etc Work, And As Per Direction Of Site Incharge. All Clamp & Nut Bolt Will Be Provided By Contractor. Pcc Pole 11 Mtrs St Pole 13 Mtrs Erection & Fixing Of Single Pole Structure Of Following Pole Of I L Kv Line Along With X-Arm And Pin Insulator After Digging Of Suitable Pits Including Fixing Of Requisite All Accessories As Per Respo Drawing Norms By Providing F-Bracket And Holding Clamps Made Of M.S. Flat Of Size 65X6 Mm With Proper Size Nuts And Bolts, Stone Pad With As Per Direction Of Site Incharge. Pcc Pole 8.5 Mtrs/9 Mtrs Pcc Pole 11 Mtrs St Pole 9 Mtrs/11 Mtrs St Pole 13 Mtrs Erection & Fixing Of Single Pole Structure Of Following Pole Of 33 Kv Line Along With X-Arm And Pin Insulator After Digging Of Suitable Pits Including Fixing Of Requisite All Accessories As Per Respo Drawing Norms By Providing F-Bracket And Holding Clamps Made Of M.S. Flat Of Size 65X8 Mm With Proper Size Nuts And Bolts And Stone Pad With As Per Direction Of Site Incharge. Pcc Pole 11 Mtrs Pcc Pole 9 Mtrs St Pole 9 Mtrs/11 Mtrs St Pole 13 Mtrs Erection & Fixing Of Single Pole Structure Of Following Pole Of Lt Line Along With With Shakle Insulator After Digging Of Suitable Pits Including Fixing Of Requisite All Accessories As Per Respo Drawing Norms By Providing Holding Clamps Made Of M.S. Flat Of Size 35X5 Mm With Proper Size Nuts And Bolts And Stone Pad With As Per Direction Of Site Incharge. Pcc Pole 8.5 Mtrs St Pole 9 Mtrs Erection Of Double Pole Structure For 33Kv Line After Digging Of Suitable Pits On Following Pole. With Fabrication And Fixing Of M.S. Top & Dropper Channel, M.S. T/F Angle, E Bracket, 33Kv Pin Insulator With Pin, Disc Insulator With Disc Fitting Etc., As Per Respo Norms By Providing All Clamps Made Of M.S. Flat Of Size 65X8 Mm With Proper Size Nuts And Bolts And Stone Pad With Jumpering Etc Work, As Per Direction Of Site Incharge. All Clamp & Nut Bolt Will Be Provided By Contractor. Pcc Pole 11 Mtrs Pcc Pole 9 Mtrs St Pole 13 Mtrs Erection Of Double Pole Structure For 11Kv Line After Digging Of Suitable Pits On Following Pole. With Fabrication And Fixing Of M.S. Top & Dropper Channel, M.S. T/F Angle, E Bracket, 11Kv Pin Insulator With Pin, Disc Insulator With Disc Fitting Etc., As Per Respo Norms By Providing All Clamps Made Of M.S. Flat O Size 65X6 Mm With Proper Size Nuts And Bolts And Stone Pad With Jumpering Etc Work, As Per Direction Of Site Incharge. All Clamp & Nut Bolt Will Be Provided By Contractor. Pcc Pole 8.5 Mtrs Pcc Pole 11 Mtrs St Pole 9 Mtrs/11 Mtrs St Pole 13 Mtrs Grouting Of Following St/Pcc Supports In Cc 1:3:6 (Cement, Sand & 40Mm Brick Ballast) Grouting Will Be Done In The Block Of Size (450X450)Mm X1/6Th Of Full Length Of The Support, Up To Ground Level, 300Mm Plinth Above The Ground Level With Cc 1:3:6 (Cement, Core Sand And Stone Grit) With Mufting As Per Drawing, Work Includes Back Filling & Proper Ramming By Providing All Required Grouting Materials, As Per Direction Of Site Incharge. Stp 13 Mtrs Long Pcc/Stp Pole 8.5/9.0 Mtr. Long St/Pcc Pole 11 Mtr. Long Erection & Fixing Of 11Kv. Fuse Set On Stp/Pcc Pole, By Providing All Required Fixing Materials As Per Respo/Norms And As Per Direction Of Site Incharge. (Only Fuse Set Will Be Provided By The Department. Providing, Erection & Fixing Of 11Kv. Tpmo Set On Stp/Pcc Pole, By Providing All Required Fixing Materials As Per Respo/Norms And As Per Direction Of Site Incharge. (Only Tpmo Set Will Be Provided By The Department). Providing Erection & Fixing Of 3 Phase Lt Distribution Box On Pole By Providing 02 Nos. Dib Clamps & Proper Size Nut & Bolts, Jumpring Wire As Per Direction Of Site Incharge. Construction Of T/F Plinth Suitable For 160/250/400 Kva T/F (Size 2X2X1.5 Mtr) After Digging Of Earth And Construction With Cement, Fine Sand, Coarse.Sand, Brick Ballast, 1St Class Bricks, Stone Ballast (40Mm), Ms Channel 125X65Mm, Ms Twisted Bar 20 Mm & Ramming The Same, Including Cost Of All Material & Labour, As Per Direction Of Site Incharge. (All Matreial/ Labour/ T&P Use For Construction Of Plinth Will Be Provided By Contractor) Construction Of Safety Fencing (Ms) Size 3X3X2 Mtr. For Dist. Transformer 11/0.4 Kv Sub Station, With Supply Of Material Required For Ms Fencing (50X50X3 Mm) M.S. Wire Mesh Construction Utilizing Vertical Post Duly Grouted/Fitted In Ground/On Floor. Horizontal Angle/T-Iron To Be Fitted On Vertical Posts. Pickets (If Required) Fitted To Rail And Gate To Facilitate Entry And Exit. The Vertical Posts/Horizontal Post Shall Be Made Of M.S. Angle 65X65X6Mm. Such Post Shall Be Kept Preferably At Distance Of 800-1000 Mm. And Shall Be Grounded With Cc Ratio 1:4:8. The Length Of Vertical Post Shall Be Sufficient To Take Care Of Fencing As Requirement At Site, And As Per Direction Of Site Incharge. (All Matreial/ Labour/ T&P Use For Construction Of Plinth Will Be Provided By Contractor) Safely Installing And Fixing The New Following Capacity Transformer With The Help Of Crane/Manual Labour At Lt Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge. All Clamps And Nut Bolt Will Be Provided By Contractor (A) 10/16 Kva (B) 25/63/100 Kva (C) 250 To 400 Kva Safely Installing And Fixing The Following Ct/Pt Unit With The Help Of Crane/Manual Labour At Sub-Station Double Pole, As Per Direction Of Site Incharge. All Clamps And Nut Bolt Will Be Provided By Contractor 11 Kv Ct/Pt 33 Kv Ct/Pt Laying Of Overhead 11Kv Abc/Xlpe Of Various Capacity On Stp/Pcc Pole. Work Include Hanging Of 11 Kv Cable Properly With The Help Of Necessary Clamps And Complete Work Properly As Per Respo Norms And As Per Direction Of Site Incharge.(Rate Will Be Charge As Per Actual Length Of Work). All Clamps And Nut Bolt Will Be Provided By Contractor Laying Of Overhead Lt Abc Of Various Capacity On Stp/Pcc Pole. Work Include Hanging Of Lt Cable Properly With The Help Of Necessary Clamps And Complete Work Properly As Per Respo Norms And As Per Direction Of Site Incharge.(Rate Will Be Charge As Per Actual Length Of Work). All Clamps And Nut Bolt Will Be Provided By Contractor (A) Single Phase Lt Abc (B) Three Phase Lt Abc Laying Of Following Lt Pvc Cable Of All Size On Stp/Pcc Pole Overhead And Complete Work Properly, As Per Respo Norms, And As Per Direction Of Site Incharge. All Clamps And Nut Bolt Will Be Provided By Contractor. Single Core Three Core Supply And Laying Of Following Pn-4Pe-80 Pn-4 Grade Uv Stabilized Hdpe Pipe From Drill Method/Trenchless As Per Is Of 6Meter, For Laying Of Underground Cable As Per Respo/Norms, As Per Direction Of Site Incharge. (Rate Will Be Charge As Per Actual Length Of Work) 140 Mm Dia 160 Mm Dia 200 Mm Dia Laying Of Following Xlpe Cable Undergound Into Hdpe Pipe, Spare Cable Shall Be Left In The Loop Shape At Both Ends As Per Respo/Norms, As Per Direction Of Site Incharge.(Rate Will Be Charge As Per Actual Length Of Work) (A) 33 Kv Xlpe Cable Of Size 3X185/3X240/3X300 Sq.Mm (B) 11 Kv Xlpe Cable Of Size 3X70/3X120/3X185/3X240/3X300 Sq.Mm Digging Of Earth 30 Cm Width Single Core Cable 1.0 Meter Deep And Refling And Finishiung As Same With Road Restoration Charge For Laying Of 33 Kv/11 Kv Xlpe Cable As Per Respo Norms. (The Firm Will Be Fully Responsible For This Work And Taking Necessary Permission), As Per Direction Of Site Incharge (Rate Will Be Charge As Per Actual Length Of Work). Foot Path/ Kaccha Road Pucca Road Digging Of Earth 60 Cm Width 1.0 Meter Deep And For Laying Of Double Cable Refling And Finising As Same With Road Restoration Charge For Laying Of 33 Kv/11 Kv Xlpe Cable As Per Respo Norms. (The Firm Will Be Fully Responsible For This Work And Taking Necessary Permission), As Per Direction Of Site Incharge (Rate Will Be Charge As Per Actual Length Of Work). Foot Path/ Kaccha Road Pucca Road After Digging Of Pit Laying Of Underground Cable With 1St Class Pucca Brick And Concrete Sand As Per Respo/Norms As Per Direction Of Site Incharge. Only Xlpe/ Pvc Cable Will Be Provided By Department. 11Kv 3X70 Sq.Mm. 11Kv 3X120 Sq.Mm. 11Kv 3X185 Sq.Mm. 33 Kv 3X120 Sq.Mm. 33 Kv 3X300 Sq.Mm. Supply, Fabrication & Fixing Of T Off-Channel On Pole By Providing Holding Clamps, F-Clamps & Proper Size Nuts & Bolts, As Per Respo/Norms And As Per Direction Of Site Incharge. Supply, Fabrication & Fixing Of Guarding Angle Other Requisites Material For Guarding By Drawing 02Nos G.I Wire And Making Loop At Suitable Distance As Per Respo Norms By Providing Holding Clamps, 02Nos. Eye Bolts Made Of M.S. Round Size 12Mm Dia-100Mm Long & Cross Arm Clamps Made Of M.S. Flat Of Size 65X6Mm And Bolts As Per Norms Of Respo Lucknow, And As Per Direction Of Site Incharge. (Only Guarding Angle & Gi Wire Will Be Provided By Department). Providing And Wrapping Of Barbed Wire On St/Pcc Poles As Anti-Climbing Device For A Length Of 0.9Mtrs. Wire Pitch/Gap 13Mm And Fixing Upper And Lower End Keeping Lower End At A Hieght Of 2.75 Mtr From The Ground Complete, Including Providing & Fixing Of Lower End & Upper End Clamps Made Of M.S. Flat 40X5Mm Complete With Nuts & Bolts And All Other Required Material And T&P., As Per Direction Of Site Incharge. Grouting & Fixing Of Stay Rods (20X1800)Mm Including All Work Of Excavation, Cement Concrete In Size (0.60X0.60X0.30)M In Ratio 1:4:8 Cement, Sand, 40Mm Brick Ballast As Per Drg. Including Back Filling, Proper Ramming Etc And Fixing Tightening & Nozzling Of Stay Wire With Stay Rod With The Poles Of Required Tension As Per Drawing As Per Respo Norms By Providing All Grouting Material And Stay Clamp Made Of M.S. Flat Of Size 65X6Mm With Proper Size Bolts & Nuts & Loops, As Per Direction Of Site Incharge. Earthing Of Supports With Ms Earth Rod Of (20X2500)Mm Long Including Excavation Of Pit And Driving M.S. Rod 3.0 M Apart From Support And 0.5M Below The Ground Level And Connection Below The Earth Electrodes With The Help Of G.I. Wire & Earthing Lugs As Per Respo Norms By Providing Proper Size Nuts & Bolts, As Per Direction Of Site Incharge. Only Earth Rod And Gi Wire Will Be Provided By Department. Providing And Fixing Earthing Of Neutral & Body Of T/F By Boring And Lowering Of G.I. Pipe Size 32 Mm Dia… Into The Ground Up To Water Level 120 Fit. With The Lower End Of Solid Copper Cone Approx. 225Mm Long And 750 Gm. In Weight Shall Be Provided And Screwed In Pipe As Well As Bringing Out A Continuous Copper Wire 6 Swg From The Cone Up To The Ground Surface Where It Will Be Bolted To The M.S. Earth Strip For T/F Neutral Connection, The Earth Strip Will Be Welded To The G.I. Pipe And Neutral Earthing Support, As Per Direction Of Site Incharge. Providing & Fixing Of G.I. Pipe 6\Dia Class-B Over 11Kv/33 Kv Xlpe Cable Before Mounting The Cable At Double Pole. The Work Includes Fitting Of Clamps, Sealing Of Top And Bottom Of Pipe And One End Of Pipe Is To Be Burried Under Earth About 500Mm Earch Including Mounting And Clamping The Cable On Double Pole Structure And Making Connection With Overhead Line At Both Ends, As Per Direction Of Site Incharge. Providing And Fixing Of Suspension Clamp With Eye Hook As Per Respo/Norms And As Per Direction Of Site Incharge. Providing And Fixing Of Dead End Clamp With Eye Hook, As Per Respo/Norms And As Per Direction Of Site Incharge. Providing & Fixing Of Stone Pad 300X300X75 Mm As Per Respo Norms And Per Direction Of Site Incharge. Providing And Fixing Of Complete Lt Pannel With Arrangement Of 3 Phase Lt Mccb And Bus Bar For 24 Nos Cable Service As Per Instruction Of Site Incharge 200 Amp 400 Amp 630 Amp Providing & Fixing Of Danger Board, Including Fixing Of All Accessories By Providing All Required Materials (Like Suitable Clamps, Nuts & Bolts Etc.) As Per Respo Norms And As Per Direction Of Site Incharge. Providing & Fixing Of Number Plate Alongwith All Required Accessories (Like Suitable Clamps, Nuts & Bolts Etc.) As Per Respo Norms And As Per Direction Of Site Incharge. Making And Filling Of 11Kv Cable Jointing Kit, Indoor/Outdoor Type, After Duly Plumbing And Taping Of Suitable Xlpe Cable, Providing, Fixing And Crimping Of Proper Size Good Quality Lugs, Including Cost Of Lugs And Tape Etc., As Per Respo Norms, And As Per Direction Of Site Incharge. Making And Filling Of 33Kv Cable Jointing Kit, Indoor/Outdoor Type, After Duly Plumbing And Taping Of Suitable Xlpe Cable, Providing, Fixing And Crimping Of Proper Size Good Quality Lugs, Including Cost Of Lugs And Tape Etc., As Per Respo Norms, And As Per Direction Of Site Incharge. Installation Of Metering Cubical Complete Work As Per Respo Norms, And As Per Direction Of Site Incharge. 11 Kv 33 Kv Providing 2 Coat Red Oxide Paint Isi Make & Painting Of 11/13 Mtr St Supports Its As Per Respo/Norms And As Per Direction Of Site Incharge. All Material Provided By Contractor. Providing 2 Coat Alluminium Paint & Painting Of 11/13 Mtr St Supports By Its As Per Respo/Norms And As Per Direction Of Site Incharge. All Material Provided By Contractor. Diging Of Pit With Manual Digging Method And Laying Of O/D Pn-6Pe-80 Pn-4 Grade Uv Stabilized Hdpe Pipe As Per Is Of 6 Meter Long, For Laying Of Underground Cable As Per Respo/Norms, Work Including Cost Of Hdpe Pipe, As Per Direction Of Site Incharge. 140 Mm Dia 160 Mm Dia 200 Mm Dia Laying, Stringing And Final Sagging Of Acsr Weasel Conductor, As Per Respo Norms And As Per Direction Of Site Incharge. Laying, Stringing And Final Sagging Of Acsr Rabbit Conductor, As Per Respo Norms And As Per Direction Of Site Incharge. Laying, Stringing And Final Sagging Of Acsr Dog Conductor, As Per Respo Norms And As Per Direction Of Site Incharge. Laying, Stringing And Final Sagging Of Acsr Panthar Conductor, As Per Respo Norms And As Per Direction Of Site Incharge. Providing And Fixing Of Al Lugs Of T/F 30 Sq.Mm 120 Sq.Mm 185 Sq.Mm 300 Sq.Mm Providing And Installation Of Maintenance Free Multifaceted Proactive And Corrosion Free Chemical Earthing Electrod Size 80Mm X 3000Mm Complete With 50Kg Backfill Compound With All Required Accessories For Body/Neutral Earthing Of Transformers, Including Cost Of M.S. Earth Strip For Connection The Earth Strip Will Be Welded To The Earthing And Neutral Support, As Per Respo/Norms And As Per Direction Of Site Incharge. Jumpheing Work Of Lt/Ht Line For Proper Energization Of Line. Safely Dismantling Work Properly And Carriage Of Old & Used Stp Pole & Other Material From Site Of Work To Electricity Store Center, Muzaffarnagar With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge. St Pole 11/13 Mtrs. Long Iron Scrap Abc/Pvc/Xlpe Cable Rail Pole/Rs Joist Safely Dismantling/Removal And Carriage Of Old & Used Acsr Conductor From Site Of Work To Electricity Store Center, Muzaffarnagar With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge. Saftly Dismantling Work Properly And Carriage Of Old & Used TransformerS From Site Of Work To Electricity Store Center, Muzaffarnagar With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge. (A) 10/16 Kva (B) 25/63/100 Kva (C) 250 To 400 Kva Saftly Dismantling Work Properly And Carriage Of Old & Used 11 Kv Ct/Pt, 33 Kv Ct/Pt And Metering Cubical From Site Of Work To Electricity Store Center, Muzaffarnagar With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge. 11 Kv Ct/Pt 33 Kv Ct/Pt 33 Kv/ 11Kv Metering Cubical Carrage Of Old & Used Conductor And Opening Of All Accessories. (Iron/Steel Scrap) Including Carriage Of Above Material From Site Of Work To Je Store/Esc-Muzaffarnagar. With Loading And Unloading At Both Ends On Kachha Packka Road As Per Direction Of Site Incharge. Installing Of 11 Kv Vcb Properly With Grouting And Making All Connection Properly For Safe Energization. Providing And Making Jointing Kit Of 3 Phase Lt Cable For

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 24-Aug-2026 Terms and Conditions Technical Bid 31-Aug-2026

BOQ

Name of Work:- vf/kkklh vfHk;Urk] fo|qr uxjh; forj.k [k.M&rduhdh] eqt¶Qjuxj ds v/khu lgk;d vfHk;Urk] ¼rduhdh&lqtMw½ ds dk;Z{ks= esa ^iw.kZ tek ;kstuk* en esa gksus okys dk;Z jfuax d‚UVªsDV ds vkèkkj ij :0 20-00 yk[k dh foÙkh; lhek rdA
Sl. No. Item Description
1Carriage of all petty material of estimate, from Electricity store center, Muzaffarnagar to 33/11KV Sub-Station/site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge from JE Store/Store center Muzaffarnagar/other store center within the range of 0-50 Km).
2Carriage of following material from Electricity store center, Muzaffarnagar/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge from JE Store/Store center Muzaffarnagar/other store center within the range of 0-50 Km).
3ST Pole 11/13 mtrs. Long
4PCC Pole 11 mtrs. Long
5PCC Pole 8.5/9.0 mtrs. Long
6STP Pole 9.0 Mtrs long
711KV Xlpe Cable 3x70/3x120/3x185/3x300 sq.mm
833KV Xlpe Cable 3x120/3x185/3x300 sq.mm
9Single phase AB Cable 35/50/95 sq.mm
10Three phase AB Cable 3x50/3x95/3x120 sq.mm
1111 KV CT/PT Unit
1233 KV CT/PT Unit
1311 KV Metering Cubical
1433 KV Metering Cubical
15ACSR Weasel Conductor
16ACSR Dog Conductor
17ACSR Rabbit Conductor
18ACSR Panthar Conductor
1911 KV VCB
2033 KV/11 KV Jointing kit outdoor/indoor
21Carriage of following capacity transformer from Electricity store center, Muzaffarnagar to site of work with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge from JE Store/Store center Muzaffarnagar/other store center within the range of 0-50 Km).
22(a) 10/16 KVA
23(b) 25/63/100 KVA
24(C) 250 to 400 KVA
25Erection of 11KV Four-pole structure after digging of suitable pits on following pole with fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Norms by providing all clamps made of M.S. Flat of size 65x6 mm with proper size nuts and bolts and Stone Pad with jumpering etc work, and as per direction of site incharge. All Clamp & Nut bolt will be provided by contractor.
26PCC Pole 8.5 Mtrs/9 Mtrs
27PCC Pole 11 Mtrs
28ST Pole 13 Mtrs
29Erection of 33KV Four-pole structure after digging of suitable pits on following pole with fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 33 KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Norms by providing all clamps made of M.S. Flat of size 65x8 mm with proper size nuts and bolts and Stone Pad with jumpering etc work, and as per direction of site incharge. All Clamp & Nut bolt will be provided by contractor.
30PCC Pole 11 Mtrs
31ST Pole 13 Mtrs
32Erection & Fixing of single pole structure of following pole of I l KV line along with X-Arm and pin insulator after digging of suitable pits including fixing of requisite all accessories as per RESPO Drawing norms by providing F-Bracket and holding Clamps made of M.S. Flat of size 65x6 mm with proper size nuts and bolts, Stone Pad with as per direction of site incharge.
33PCC Pole 8.5 Mtrs/9 Mtrs
34PCC Pole 11 Mtrs
35ST Pole 9 Mtrs/11 Mtrs
36ST Pole 13 Mtrs
37Erection & Fixing of single pole structure of following pole of 33 KV line along with X-Arm and pin insulator after digging of suitable pits including fixing of requisite all accessories as per RESPO Drawing norms by providing F-Bracket and holding Clamps made of M.S. Flat of size 65x8 mm with proper size nuts and bolts and Stone Pad with as per direction of site incharge.
38PCC Pole 11 Mtrs
39PCC Pole 9 Mtrs
40ST Pole 9 Mtrs/11 Mtrs
41ST Pole 13 Mtrs
42Erection & Fixing of single pole structure of following pole of LT line along with with shakle insulator after digging of suitable pits including fixing of requisite all accessories as per RESPO Drawing norms by providing holding Clamps made of M.S. Flat of size 35x5 mm with proper size nuts and bolts and Stone Pad with as per direction of site incharge.
43PCC Pole 8.5 Mtrs
44ST Pole 9 Mtrs
45Erection of double pole structure for 33KV Line after digging of suitable pits on following pole. with fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E Bracket, 33KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Norms by providing all clamps made of M.S. Flat of size 65x8 mm with proper size nuts and bolts and Stone Pad with jumpering etc work, as per direction of site incharge. All Clamp & Nut bolt will be provided by contractor.
46PCC Pole 11 Mtrs
47PCC Pole 9 Mtrs
48ST Pole 13 Mtrs
49Erection of double pole structure for 11KV Line after digging of suitable pits on following pole. with fabrication and fixing of M.S. Top & Dropper Channel, M.S. T/F Angle, E Bracket, 11KV Pin insulator with Pin, Disc Insulator with Disc fitting etc., as per RESPO Norms by providing all clamps made of M.S. Flat o size 65x6 mm with proper size nuts and bolts and stone pad with jumpering etc work, as per direction of site incharge. All Clamp & Nut bolt will be provided by contractor.
50PCC Pole 8.5 Mtrs
51PCC Pole 11 Mtrs
52ST Pole 9 Mtrs/11 Mtrs
53ST Pole 13 Mtrs
54Grouting of following ST/PCC supports in CC 1:3:6 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials, as per direction of site incharge.
55STP 13 Mtrs Long
56PCC/STP Pole 8.5/9.0 mtr. Long
57ST/PCC Pole 11 mtr. Long
58Erection & Fixing of 11KV. Fuse set on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge. (Only Fuse Set will be provided by the Department.
59Providing, Erection & Fixing of 11KV. TPMO set on STP/PCC Pole, by providing all required fixing materials as per RESPO/Norms and as per direction of site incharge. (Only TPMO Set will be provided by the Department).
60Providing Erection & Fixing of 3 Phase LT Distribution Box on pole by providing 02 Nos. DIB Clamps & proper size nut & bolts, Jumpring wire as per direction of site incharge.
61Construction of T/F plinth suitable for 160/250/400 KVA T/F (size 2x2x1.5 mtr) after digging of earth and construction with cement, fine sand, Coarse.sand, Brick Ballast, 1st Class Bricks, Stone Ballast (40mm), MS Channel 125x65mm, MS Twisted bar 20 mm & ramming the same, including cost of all material & labour, as per direction of site incharge. (all matreial/ labour/ T&P use for construction of plinth will be provided by contractor)
62Construction of safety fencing (MS) size 3x3x2 mtr. for Dist. Transformer 11/0.4 KV Sub Station, With supply of material required for MS fencing (50X50X3 MM) M.S. wire mesh construction utilizing vertical post duly grouted/fitted in ground/on floor. Horizontal angle/T-iron to be fitted on vertical posts. Pickets (if required) fitted to rail and gate to facilitate entry and exit. The vertical Posts/Horizontal post shall be made of M.S. angle 65x65x6mm. Such post shall be kept preferably at distance of 800-1000 MM. and shall be grounded with CC ratio 1:4:8. The length of vertical post shall be sufficient to take care of fencing as requirement at site, and as per direction of site incharge. (all matreial/ labour/ T&P use for construction of plinth will be provided by contractor)
63Safely installing and fixing the New following capacity transformer with the help of crane/manual labour at LT Sub-Station Double Pole/Plinth, as per direction of site incharge. All clamps and nut bolt will be provided by contractor
64(a) 10/16 KVA
65(b) 25/63/100 KVA
66(C) 250 to 400 KVA
67Safely installing and fixing the following CT/PT Unit with the help of crane/manual labour at Sub-Station Double Pole, as per direction of site incharge. All clamps and nut bolt will be provided by contractor
6811 KV CT/PT
6933 KV CT/PT
70Laying of overhead 11KV ABC/XLPE of various capacity on STP/PCC Pole. Work include hanging of 11 KV Cable properly with the help of necessary clamps and complete work properly as per RESPO Norms and as per direction of site incharge.(Rate will be charge as per actual length of work). All clamps and nut bolt will be provided by contractor
71Laying of overhead LT ABC of various capacity on STP/PCC Pole. Work include hanging of LT Cable properly with the help of necessary clamps and complete work properly as per RESPO Norms and as per direction of site incharge.(Rate will be charge as per actual length of work). All clamps and nut bolt will be provided by contractor
72(a) Single Phase LT ABC
73(b) Three Phase LT ABC
74Laying of following LT PVC Cable of all size on STP/PCC pole overhead and complete work properly, as per RESPO Norms, and as per direction of site incharge. All clamps and nut bolt will be provided by contractor.
75Single Core
76Three Core
77Supply and Laying of following PN-4PE-80 PN-4 grade UV stabilized HDPE pipe from drill method/trenchless as per IS of 6meter, for laying of underground Cable as per RESPO/Norms, as per direction of site incharge. (Rate will be charge as per actual length of work)
78140 mm dia
79160 mm dia
80200 mm dia
81Laying of following XLPE Cable undergound into HDPE Pipe, spare cable shall be left in the loop shape at both ends as per RESPO/Norms, as per direction of site incharge.(Rate will be charge as per actual length of work)
82(a) 33 KV XLPE Cable of size 3x185/3x240/3x300 sq.mm
83(b) 11 KV XLPE Cable of size 3x70/3x120/3x185/3x240/3x300 sq.mm
84Digging of earth 30 cm width single core cable 1.0 meter deep and refling and finishiung as same with road restoration charge for laying of 33 KV/11 KV XLPE Cable as per RESPO Norms. (The Firm will be fully responsible for this work and taking necessary permission), as per direction of site incharge (Rate will be charge as per actual length of work).
85Foot path/ Kaccha Road
86Pucca Road
87Digging of earth 60 cm width 1.0 meter deep and for laying of double cable refling and finising as same with road restoration charge for laying of 33 KV/11 KV XLPE Cable as per RESPO Norms. (The Firm will be fully responsible for this work and taking necessary permission), as per direction of site incharge (Rate will be charge as per actual length of work).
88Foot path/ Kaccha Road
89Pucca Road
90After digging of pit laying of underground Cable with 1st class pucca brick and concrete sand as per RESPO/Norms as per direction of site incharge. Only XLPE/ PVC Cable will be provided by department.
9111KV 3x70 sq.mm.
9211KV 3x120 sq.mm.
9311KV 3x185 sq.mm.
9433 KV 3x120 sq.mm.
9533 KV 3x300 sq.mm.
96Supply, Fabrication & Fixing of T off-Channel on pole by providing Holding Clamps, F-Clamps & Proper size nuts & bolts, as per RESPO/Norms and as per direction of site incharge.
97Supply, Fabrication & Fixing of Guarding Angle other requisites material for guarding by drawing 02Nos G.I Wire and making loop at suitable distance as per RESPO Norms by providing holding clamps, 02Nos. Eye bolts made of M.S. round size 12mm dia-100mm long & Cross Arm clamps made of M.S. Flat of size 65x6mm and bolts as per norms of RESPO Lucknow, and as per direction of site incharge. (only Guarding Angle & GI Wire will be provided by Department).
98Providing and Wrapping of barbed wire on ST/PCC poles as anti-climbing device for a length of 0.9mtrs. Wire pitch/gap 13mm and fixing upper and lower end keeping lower end at a hieght of 2.75 mtr from the ground complete, including providing & fixing of lower end & upper end clamps made of M.S. Flat 40X5mm complete with nuts & bolts and all other required material and T&P., as per direction of site incharge.
99Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Norms by providing all grouting material and stay clamp made of M.S. Flat of size 65x6mm with proper size bolts & nuts & loops, as per direction of site incharge.
100Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Norms by providing proper size nuts & bolts, as per direction of site incharge. only earth rod and GI wire will be provided by department.
101Providing and fixing Earthing of neutral & body of T/F By Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 120 fit. With the lower end of solid copper cone approx. 225mm long and 750 gm. in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth strip for T/F neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support, as per direction of site incharge.
102Providing & Fixing of G.I. pipe 6\\"dia Class-B over 11KV/33 KV XLPE cable before mounting the cable at double pole. The work includes fitting of clamps, sealing of top and bottom of pipe and one end of pipe is to be burried under earth about 500mm earch including mounting and clamping the cable on double pole structure and making connection with overhead line at both ends, as per direction of site incharge.
103Providing and fixing of Suspension Clamp with Eye Hook as per RESPO/Norms and as per direction of site incharge.
104Providing and fixing of Dead End Clamp with Eye Hook, as per RESPO/Norms and as per direction of site incharge.
105Providing & Fixing of Stone Pad 300x300x75 mm as per RESPO Norms and per direction of site incharge.
106Providing and Fixing of complete LT Pannel with arrangement of 3 phase LT MCCB and Bus Bar for 24 Nos cable service as per instruction of site incharge
107200 amp
108400 amp
109630 amp
110Providing & Fixing of Danger Board, including fixing of all accessories by providing all required materials (like suitable clamps, nuts & bolts etc.) as per RESPO Norms and as per direction of site incharge.
111Providing & Fixing of Number Plate alongwith all required accessories (like suitable clamps, nuts & bolts etc.) as per RESPO Norms and as per direction of site incharge.
112Making and filling of 11KV Cable Jointing Kit, Indoor/outdoor type, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms, and as per direction of site incharge.
113Making and filling of 33KV Cable Jointing Kit, Indoor/outdoor type, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms, and as per direction of site incharge.
114Installation of Metering Cubical Complete work as per RESPO Norms, and as per direction of site incharge.
11511 KV
11633 KV
117Providing 2 coat Red Oxide paint ISI Make & Painting of 11/13 Mtr ST supports its as per RESPO/Norms and as per direction of site incharge. All material provided by contractor.
118Providing 2 coat alluminium paint & Painting of 11/13 Mtr ST supports by its as per RESPO/Norms and as per direction of site incharge. All material provided by contractor.
119diging of pit with Manual digging method and laying of O/D PN-6PE-80 PN-4 grade UV stabilized HDPE pipe as per IS of 6 meter long, for laying of underground Cable as per RESPO/Norms, work including cost of HDPE pipe, as per direction of site incharge.
120140 mm dia
121160 mm dia
122200 mm dia
123Laying, Stringing and final sagging of ACSR Weasel Conductor, as per RESPO Norms and as per direction of site incharge.
124Laying, Stringing and final sagging of ACSR Rabbit Conductor, as per RESPO Norms and as per direction of site incharge.
125Laying, Stringing and final sagging of ACSR Dog Conductor, as per RESPO Norms and as per direction of site incharge.
126Laying, Stringing and final sagging of ACSR Panthar Conductor, as per RESPO Norms and as per direction of site incharge.
127Providing and fixing of Al Lugs of T/F
12830 sq.mm
129120 sq.mm
130185 sq.mm
131300 sq.mm
132Providing and installation of maintenance free multifaceted proactive and corrosion free chemical earthing electrod size 80mm x 3000mm complete with 50KG backfill compound with all required accessories for Body/neutral earthing of Transformers, including cost of M.S. earth strip for connection the earth strip will be welded to the earthing and neutral support, as per RESPO/Norms and as per direction of site incharge.
133Jumpheing work of LT/HT line for proper energization of line.
134Safely dismantling work properly and carriage of old & used STP pole & other material from site of work to Electricity store center, Muzaffarnagar with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
135ST Pole 11/13 mtrs. Long
136Iron Scrap
137ABC/PVC/XLPE Cable
138Rail pole/RS Joist
139Safely dismantling/removal and carriage of old & used ACSR Conductor from site of work to Electricity store center, Muzaffarnagar with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
140Saftly dismantling work properly and carriage of old & used Transformer's from site of work to Electricity store center, Muzaffarnagar with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
141(a) 10/16 KVA
142(b) 25/63/100 KVA
143(C) 250 to 400 KVA
144Saftly dismantling work properly and carriage of old & used 11 KV CT/PT, 33 KV CT/PT and metering cubical from site of work to Electricity store center, Muzaffarnagar with loading and unloading at both ends on Kachha Packka road, as per direction of site incharge.
14511 KV CT/PT
14633 KV CT/PT
14733 KV/ 11KV Metering Cubical
148Carrage of old & used conductor and opening of all accessories. (Iron/steel Scrap) including carriage of above material from site of work to JE Store/ESC-Muzaffarnagar. With loading and unloading at both ends on Kachha Packka road as per direction of site incharge.
149Installing of 11 KV VCB properly with grouting and making all connection properly for safe energization.
150Providing and making jointing kit of 3 phase LT Cable for
1513x120 sq.mm
1523x240 sq.mm
1533x400 sq.mm
154Providing and making jointing kit of 1 phase LT Cable with cable jointing kit for 1x120, 1x240, 1x400 sq.mm. cable
1551x120 sq.mm.
1561x240 sq.mm
1571x400 sq.mm Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57168808
AUTHORITY Government Departments
TENDER VALUE 20 Lakhs
LAST DATE 31-08-2026
Authority
Authority Name Paschimanchal Vidyut Vitran Nigam Limited
Work Description Tender For Various Works Under The Full Deposit Scheme Head, In The Area Of The Assistant Engineer (Technical-Suzru) Under The Executive Engineer, Electricity Urban Distribution Division (Technical), Muzaffarnagar To Be Executed On A Running Contract Basis- St Pole 11/13 Mtrs. Long Pcc Pole 11 Mtrs. Long Pcc Pole 8.5/9.0 Mtrs. Long Stp Pole 9.0 Mtrs Long 11Kv Xlpe Cable 3X70/3X120/3X185/3X300 Sq.Mm 33Kv Xlpe Cable 3X120/3X185/3X300 Sq.Mm Single Phase Ab Cable 35/50/95 Sq.Mm Three Phase Ab Cable 3X50/3X95/3X120 Sq.Mm 11 Kv Ct/Pt Unit 33 Kv Ct/Pt Unit 11 Kv Metering Cubical 33 Kv Metering Cubical Acsr Weasel Conductor Acsr Dog Conductor Acsr Rabbit Conductor Acsr Panthar Conductor 11 Kv Vcb 33 Kv/11 Kv Jointing Kit Outdoor/Indoor Carriage Of Following Capacity Transformer From Electricity Store Center, Muzaffarnagar To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge From Je Store/Store Center Muzaffarnagar/Other Store Center Within The Range Of 0-50 Km). (A) 10/16 Kva (B) 25/63/100 Kva (C) 250 To 400 Kva Erection Of 11Kv Four-Pole Structure After Digging Of Suitable Pits On Following Pole With Fabrication And Fixing Of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 11 Kv Pin Insulator With Pin, Disc Insulator With Disc Fitting Etc., As Per Respo Norms By Providing All Clamps Made Of M.S. Flat Of Size 65X6 Mm With Proper Size Nuts And Bolts And Stone Pad With Jumpering Etc Work, And As Per Direction Of Site Incharge. All Clamp & Nut Bolt Will Be Provided By Contractor. Pcc Pole 8.5 Mtrs/9 Mtrs Pcc Pole 11 Mtrs St Pole 13 Mtrs Erection Of 33Kv Four-Pole Structure After Digging Of Suitable Pits On Following Pole With Fabrication And Fixing Of M.S. Top & Dropper Channel, M.S. T/F Angle, E-Bracket, 33 Kv Pin Insulator With Pin, Disc Insulator With Disc Fitting Etc., As Per Respo Norms By Providing All Clamps Made Of M.S. Flat Of Size 65X8 Mm With Proper Size Nuts And Bolts And Stone Pad With Jumpering Etc Work, And As Per Direction Of Site Incharge. All Clamp & Nut Bolt Will Be Provided By Contractor. Pcc Pole 11 Mtrs St Pole 13 Mtrs Erection & Fixing Of Single Pole Structure Of Following Pole Of I L Kv Line Along With X-Arm And Pin Insulator After Digging Of Suitable Pits Including Fixing Of Requisite All Accessories As Per Respo Drawing Norms By Providing F-Bracket And Holding Clamps Made Of M.S. Flat Of Size 65X6 Mm With Proper Size Nuts And Bolts, Stone Pad With As Per Direction Of Site Incharge. Pcc Pole 8.5 Mtrs/9 Mtrs Pcc Pole 11 Mtrs St Pole 9 Mtrs/11 Mtrs St Pole 13 Mtrs Erection & Fixing Of Single Pole Structure Of Following Pole Of 33 Kv Line Along With X-Arm And Pin Insulator After Digging Of Suitable Pits Including Fixing Of Requisite All Accessories As Per Respo Drawing Norms By Providing F-Bracket And Holding Clamps Made Of M.S. Flat Of Size 65X8 Mm With Proper Size Nuts And Bolts And Stone Pad With As Per Direction Of Site Incharge. Pcc Pole 11 Mtrs Pcc Pole 9 Mtrs St Pole 9 Mtrs/11 Mtrs St Pole 13 Mtrs Erection & Fixing Of Single Pole Structure Of Following Pole Of Lt Line Along With With Shakle Insulator After Digging Of Suitable Pits Including Fixing Of Requisite All Accessories As Per Respo Drawing Norms By Providing Holding Clamps Made Of M.S. Flat Of Size 35X5 Mm With Proper Size Nuts And Bolts And Stone Pad With As Per Direction Of Site Incharge. Pcc Pole 8.5 Mtrs St Pole 9 Mtrs Erection Of Double Pole Structure For 33Kv Line After Digging Of Suitable Pits On Following Pole. With Fabrication And Fixing Of M.S. Top & Dropper Channel, M.S. T/F Angle, E Bracket, 33Kv Pin Insulator With Pin, Disc Insulator With Disc Fitting Etc., As Per Respo Norms By Providing All Clamps Made Of M.S. Flat Of Size 65X8 Mm With Proper Size Nuts And Bolts And Stone Pad With Jumpering Etc Work, As Per Direction Of Site Incharge. All Clamp & Nut Bolt Will Be Provided By Contractor. Pcc Pole 11 Mtrs Pcc Pole 9 Mtrs St Pole 13 Mtrs Erection Of Double Pole Structure For 11Kv Line After Digging Of Suitable Pits On Following Pole. With Fabrication And Fixing Of M.S. Top & Dropper Channel, M.S. T/F Angle, E Bracket, 11Kv Pin Insulator With Pin, Disc Insulator With Disc Fitting Etc., As Per Respo Norms By Providing All Clamps Made Of M.S. Flat O Size 65X6 Mm With Proper Size Nuts And Bolts And Stone Pad With Jumpering Etc Work, As Per Direction Of Site Incharge. All Clamp & Nut Bolt Will Be Provided By Contractor. Pcc Pole 8.5 Mtrs Pcc Pole 11 Mtrs St Pole 9 Mtrs/11 Mtrs St Pole 13 Mtrs Grouting Of Following St/Pcc Supports In Cc 1:3:6 (Cement, Sand & 40Mm Brick Ballast) Grouting Will Be Done In The Block Of Size (450X450)Mm X1/6Th Of Full Length Of The Support, Up To Ground Level, 300Mm Plinth Above The Ground Level With Cc 1:3:6 (Cement, Core Sand And Stone Grit) With Mufting As Per Drawing, Work Includes Back Filling & Proper Ramming By Providing All Required Grouting Materials, As Per Direction Of Site Incharge. Stp 13 Mtrs Long Pcc/Stp Pole 8.5/9.0 Mtr. Long St/Pcc Pole 11 Mtr. Long Erection & Fixing Of 11Kv. Fuse Set On Stp/Pcc Pole, By Providing All Required Fixing Materials As Per Respo/Norms And As Per Direction Of Site Incharge. (Only Fuse Set Will Be Provided By The Department. Providing, Erection & Fixing Of 11Kv. Tpmo Set On Stp/Pcc Pole, By Providing All Required Fixing Materials As Per Respo/Norms And As Per Direction Of Site Incharge. (Only Tpmo Set Will Be Provided By The Department). Providing Erection & Fixing Of 3 Phase Lt Distribution Box On Pole By Providing 02 Nos. Dib Clamps & Proper Size Nut & Bolts, Jumpring Wire As Per Direction Of Site Incharge. Construction Of T/F Plinth Suitable For 160/250/400 Kva T/F (Size 2X2X1.5 Mtr) After Digging Of Earth And Construction With Cement, Fine Sand, Coarse.Sand, Brick Ballast, 1St Class Bricks, Stone Ballast (40Mm), Ms Channel 125X65Mm, Ms Twisted Bar 20 Mm & Ramming The Same, Including Cost Of All Material & Labour, As Per Direction Of Site Incharge. (All Matreial/ Labour/ T&P Use For Construction Of Plinth Will Be Provided By Contractor) Construction Of Safety Fencing (Ms) Size 3X3X2 Mtr. For Dist. Transformer 11/0.4 Kv Sub Station, With Supply Of Material Required For Ms Fencing (50X50X3 Mm) M.S. Wire Mesh Construction Utilizing Vertical Post Duly Grouted/Fitted In Ground/On Floor. Horizontal Angle/T-Iron To Be Fitted On Vertical Posts. Pickets (If Required) Fitted To Rail And Gate To Facilitate Entry And Exit. The Vertical Posts/Horizontal Post Shall Be Made Of M.S. Angle 65X65X6Mm. Such Post Shall Be Kept Preferably At Distance Of 800-1000 Mm. And Shall Be Grounded With Cc Ratio 1:4:8. The Length Of Vertical Post Shall Be Sufficient To Take Care Of Fencing As Requirement At Site, And As Per Direction Of Site Incharge. (All Matreial/ Labour/ T&P Use For Construction Of Plinth Will Be Provided By Contractor) Safely Installing And Fixing The New Following Capacity Transformer With The Help Of Crane/Manual Labour At Lt Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge. All Clamps And Nut Bolt Will Be Provided By Contractor (A) 10/16 Kva (B) 25/63/100 Kva (C) 250 To 400 Kva Safely Installing And Fixing The Following Ct/Pt Unit With The Help Of Crane/Manual Labour At Sub-Station Double Pole, As Per Direction Of Site Incharge. All Clamps And Nut Bolt Will Be Provided By Contractor 11 Kv Ct/Pt 33 Kv Ct/Pt Laying Of Overhead 11Kv Abc/Xlpe Of Various Capacity On Stp/Pcc Pole. Work Include Hanging Of 11 Kv Cable Properly With The Help Of Necessary Clamps And Complete Work Properly As Per Respo Norms And As Per Direction Of Site Incharge.(Rate Will Be Charge As Per Actual Length Of Work). All Clamps And Nut Bolt Will Be Provided By Contractor Laying Of Overhead Lt Abc Of Various Capacity On Stp/Pcc Pole. Work Include Hanging Of Lt Cable Properly With The Help Of Necessary Clamps And Complete Work Properly As Per Respo Norms And As Per Direction Of Site Incharge.(Rate Will Be Charge As Per Actual Length Of Work). All Clamps And Nut Bolt Will Be Provided By Contractor (A) Single Phase Lt Abc (B) Three Phase Lt Abc Laying Of Following Lt Pvc Cable Of All Size On Stp/Pcc Pole Overhead And Complete Work Properly, As Per Respo Norms, And As Per Direction Of Site Incharge. All Clamps And Nut Bolt Will Be Provided By Contractor. Single Core Three Core Supply And Laying Of Following Pn-4Pe-80 Pn-4 Grade Uv Stabilized Hdpe Pipe From Drill Method/Trenchless As Per Is Of 6Meter, For Laying Of Underground Cable As Per Respo/Norms, As Per Direction Of Site Incharge. (Rate Will Be Charge As Per Actual Length Of Work) 140 Mm Dia 160 Mm Dia 200 Mm Dia Laying Of Following Xlpe Cable Undergound Into Hdpe Pipe, Spare Cable Shall Be Left In The Loop Shape At Both Ends As Per Respo/Norms, As Per Direction Of Site Incharge.(Rate Will Be Charge As Per Actual Length Of Work) (A) 33 Kv Xlpe Cable Of Size 3X185/3X240/3X300 Sq.Mm (B) 11 Kv Xlpe Cable Of Size 3X70/3X120/3X185/3X240/3X300 Sq.Mm Digging Of Earth 30 Cm Width Single Core Cable 1.0 Meter Deep And Refling And Finishiung As Same With Road Restoration Charge For Laying Of 33 Kv/11 Kv Xlpe Cable As Per Respo Norms. (The Firm Will Be Fully Responsible For This Work And Taking Necessary Permission), As Per Direction Of Site Incharge (Rate Will Be Charge As Per Actual Length Of Work). Foot Path/ Kaccha Road Pucca Road Digging Of Earth 60 Cm Width 1.0 Meter Deep And For Laying Of Double Cable Refling And Finising As Same With Road Restoration Charge For Laying Of 33 Kv/11 Kv Xlpe Cable As Per Respo Norms. (The Firm Will Be Fully Responsible For This Work And Taking Necessary Permission), As Per Direction Of Site Incharge (Rate Will Be Charge As Per Actual Length Of Work). Foot Path/ Kaccha Road Pucca Road After Digging Of Pit Laying Of Underground Cable With 1St Class Pucca Brick And Concrete Sand As Per Respo/Norms As Per Direction Of Site Incharge. Only Xlpe/ Pvc Cable Will Be Provided By Department. 11Kv 3X70 Sq.Mm. 11Kv 3X120 Sq.Mm. 11Kv 3X185 Sq.Mm. 33 Kv 3X120 Sq.Mm. 33 Kv 3X300 Sq.Mm. Supply, Fabrication & Fixing Of T Off-Channel On Pole By Providing Holding Clamps, F-Clamps & Proper Size Nuts & Bolts, As Per Respo/Norms And As Per Direction Of Site Incharge. Supply, Fabrication & Fixing Of Guarding Angle Other Requisites Material For Guarding By Drawing 02Nos G.I Wire And Making Loop At Suitable Distance As Per Respo Norms By Providing Holding Clamps, 02Nos. Eye Bolts Made Of M.S. Round Size 12Mm Dia-100Mm Long & Cross Arm Clamps Made Of M.S. Flat Of Size 65X6Mm And Bolts As Per Norms Of Respo Lucknow, And As Per Direction Of Site Incharge. (Only Guarding Angle & Gi Wire Will Be Provided By Department). Providing And Wrapping Of Barbed Wire On St/Pcc Poles As Anti-Climbing Device For A Length Of 0.9Mtrs. Wire Pitch/Gap 13Mm And Fixing Upper And Lower End Keeping Lower End At A Hieght Of 2.75 Mtr From The Ground Complete, Including Providing & Fixing Of Lower End & Upper End Clamps Made Of M.S. Flat 40X5Mm Complete With Nuts & Bolts And All Other Required Material And T&P., As Per Direction Of Site Incharge. Grouting & Fixing Of Stay Rods (20X1800)Mm Including All Work Of Excavation, Cement Concrete In Size (0.60X0.60X0.30)M In Ratio 1:4:8 Cement, Sand, 40Mm Brick Ballast As Per Drg. Including Back Filling, Proper Ramming Etc And Fixing Tightening & Nozzling Of Stay Wire With Stay Rod With The Poles Of Required Tension As Per Drawing As Per Respo Norms By Providing All Grouting Material And Stay Clamp Made Of M.S. Flat Of Size 65X6Mm With Proper Size Bolts & Nuts & Loops, As Per Direction Of Site Incharge. Earthing Of Supports With Ms Earth Rod Of (20X2500)Mm Long Including Excavation Of Pit And Driving M.S. Rod 3.0 M Apart From Support And 0.5M Below The Ground Level And Connection Below The Earth Electrodes With The Help Of G.I. Wire & Earthing Lugs As Per Respo Norms By Providing Proper Size Nuts & Bolts, As Per Direction Of Site Incharge. Only Earth Rod And Gi Wire Will Be Provided By Department. Providing And Fixing Earthing Of Neutral & Body Of T/F By Boring And Lowering Of G.I. Pipe Size 32 Mm Dia… Into The Ground Up To Water Level 120 Fit. With The Lower End Of Solid Copper Cone Approx. 225Mm Long And 750 Gm. In Weight Shall Be Provided And Screwed In Pipe As Well As Bringing Out A Continuous Copper Wire 6 Swg From The Cone Up To The Ground Surface Where It Will Be Bolted To The M.S. Earth Strip For T/F Neutral Connection, The Earth Strip Will Be Welded To The G.I. Pipe And Neutral Earthing Support, As Per Direction Of Site Incharge. Providing & Fixing Of G.I. Pipe 6\Dia Class-B Over 11Kv/33 Kv Xlpe Cable Before Mounting The Cable At Double Pole. The Work Includes Fitting Of Clamps, Sealing Of Top And Bottom Of Pipe And One End Of Pipe Is To Be Burried Under Earth About 500Mm Earch Including Mounting And Clamping The Cable On Double Pole Structure And Making Connection With Overhead Line At Both Ends, As Per Direction Of Site Incharge. Providing And Fixing Of Suspension Clamp With Eye Hook As Per Respo/Norms And As Per Direction Of Site Incharge. Providing And Fixing Of Dead End Clamp With Eye Hook, As Per Respo/Norms And As Per Direction Of Site Incharge. Providing & Fixing Of Stone Pad 300X300X75 Mm As Per Respo Norms And Per Direction Of Site Incharge. Providing And Fixing Of Complete Lt Pannel With Arrangement Of 3 Phase Lt Mccb And Bus Bar For 24 Nos Cable Service As Per Instruction Of Site Incharge 200 Amp 400 Amp 630 Amp Providing & Fixing Of Danger Board, Including Fixing Of All Accessories By Providing All Required Materials (Like Suitable Clamps, Nuts & Bolts Etc.) As Per Respo Norms And As Per Direction Of Site Incharge. Providing & Fixing Of Number Plate Alongwith All Required Accessories (Like Suitable Clamps, Nuts & Bolts Etc.) As Per Respo Norms And As Per Direction Of Site Incharge. Making And Filling Of 11Kv Cable Jointing Kit, Indoor/Outdoor Type, After Duly Plumbing And Taping Of Suitable Xlpe Cable, Providing, Fixing And Crimping Of Proper Size Good Quality Lugs, Including Cost Of Lugs And Tape Etc., As Per Respo Norms, And As Per Direction Of Site Incharge. Making And Filling Of 33Kv Cable Jointing Kit, Indoor/Outdoor Type, After Duly Plumbing And Taping Of Suitable Xlpe Cable, Providing, Fixing And Crimping Of Proper Size Good Quality Lugs, Including Cost Of Lugs And Tape Etc., As Per Respo Norms, And As Per Direction Of Site Incharge. Installation Of Metering Cubical Complete Work As Per Respo Norms, And As Per Direction Of Site Incharge. 11 Kv 33 Kv Providing 2 Coat Red Oxide Paint Isi Make & Painting Of 11/13 Mtr St Supports Its As Per Respo/Norms And As Per Direction Of Site Incharge. All Material Provided By Contractor. Providing 2 Coat Alluminium Paint & Painting Of 11/13 Mtr St Supports By Its As Per Respo/Norms And As Per Direction Of Site Incharge. All Material Provided By Contractor. Diging Of Pit With Manual Digging Method And Laying Of O/D Pn-6Pe-80 Pn-4 Grade Uv Stabilized Hdpe Pipe As Per Is Of 6 Meter Long, For Laying Of Underground Cable As Per Respo/Norms, Work Including Cost Of Hdpe Pipe, As Per Direction Of Site Incharge. 140 Mm Dia 160 Mm Dia 200 Mm Dia Laying, Stringing And Final Sagging Of Acsr Weasel Conductor, As Per Respo Norms And As Per Direction Of Site Incharge. Laying, Stringing And Final Sagging Of Acsr Rabbit Conductor, As Per Respo Norms And As Per Direction Of Site Incharge. Laying, Stringing And Final Sagging Of Acsr Dog Conductor, As Per Respo Norms And As Per Direction Of Site Incharge. Laying, Stringing And Final Sagging Of Acsr Panthar Conductor, As Per Respo Norms And As Per Direction Of Site Incharge. Providing And Fixing Of Al Lugs Of T/F 30 Sq.Mm 120 Sq.Mm 185 Sq.Mm 300 Sq.Mm Providing And Installation Of Maintenance Free Multifaceted Proactive And Corrosion Free Chemical Earthing Electrod Size 80Mm X 3000Mm Complete With 50Kg Backfill Compound With All Required Accessories For Body/Neutral Earthing Of Transformers, Including Cost Of M.S. Earth Strip For Connection The Earth Strip Will Be Welded To The Earthing And Neutral Support, As Per Respo/Norms And As Per Direction Of Site Incharge. Jumpheing Work Of Lt/Ht Line For Proper Energization Of Line. Safely Dismantling Work Properly And Carriage Of Old & Used Stp Pole & Other Material From Site Of Work To Electricity Store Center, Muzaffarnagar With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge. St Pole 11/13 Mtrs. Long Iron Scrap Abc/Pvc/Xlpe Cable Rail Pole/Rs Joist Safely Dismantling/Removal And Carriage Of Old & Used Acsr Conductor From Site Of Work To Electricity Store Center, Muzaffarnagar With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge. Saftly Dismantling Work Properly And Carriage Of Old & Used TransformerS From Site Of Work To Electricity Store Center, Muzaffarnagar With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge. (A) 10/16 Kva (B) 25/63/100 Kva (C) 250 To 400 Kva Saftly Dismantling Work Properly And Carriage Of Old & Used 11 Kv Ct/Pt, 33 Kv Ct/Pt And Metering Cubical From Site Of Work To Electricity Store Center, Muzaffarnagar With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge. 11 Kv Ct/Pt 33 Kv Ct/Pt 33 Kv/ 11Kv Metering Cubical Carrage Of Old & Used Conductor And Opening Of All Accessories. (Iron/Steel Scrap) Including Carriage Of Above Material From Site Of Work To Je Store/Esc-Muzaffarnagar. With Loading And Unloading At Both Ends On Kachha Packka Road As Per Direction Of Site Incharge. Installing Of 11 Kv Vcb Properly With Grouting And Making All Connection Properly For Safe Energization. Providing And Making Jointing Kit Of 3 Phase Lt Cable For
Basic Detail
Tender No SHORT TERM 10/EUDC MZN/2026-27
Bidding Type Tender
Location
City Muzaffarnagar
State Uttar Pradesh
Key Dates
Publish Date 24 Aug 2026
Submission Date 31 Aug 2026
Open Date 01 Jan 0001
Finance
Tender Value 20 Lakhs
Tender Fee 3540
EMD 20000
Exemption Not Available
Document List
32c2d1ee-9646-41b2-80aa-a524c68e87fe.html
BOQ_2215615.xls
DOC10202627.pdf
Tendernotice_1 (61).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 24, 2026
11:30 IST

Tender Published

Tender notice published.

Today
Aug 31, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 7 days
Aug 31, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
html

32c2d1ee-9646-41b2-80aa-a524c68e87fe.html

xls

BOQ_2215615.xls

pdf

DOC10202627.pdf

pdf

Tendernotice_1 (61).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders