Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; 11 Kv Line Shifting Work Under Eddkulpahar Mahoba - Supply Of Following Materials :- , Eye Hook , Dead & Cl
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; 11 Kv Line Shifting Work Under Eddkulpahar Mahoba - Supply Of Following Materials :- , Eye Hook , Dead & Cl , 11 Kv Kv 3X185 Sqmm Cable Jointing Kit Outdoortype As Per Resspo Manual. , Nut & Bolt Washer , 11 Kv Danger Board With Cl & Nut & Bolt , Stone Pad , Suspension Cl , Piercing Connector , Erection/Instalation/Fixing Of Following :- , Erection Of Eye Hook , Erection Dead & Cl , Filling Of 11 Kv Kv 3X185 Sqmm Cable Jointing Kit Outdoortype As Per Resspo Manual. , Erection Nut & Bolt Washer , Erection Of 11 Kv Danger Board With Cl & Nut & Bolt , Erection Of Stone Pad , Erection Of Suspension Cl , Erection Of Piercing Connector , Erection Of 11 Kv Composite Polymer Pin Insulator (Provided By The Dept.) , 11 Kv Disc Inslulator With Fitting (Provided By The Dept.) , Erection Of 11 Kv Polymer Disc Insulator (T&C) 45Kn (Provided By The Dept.) , Erection Of 11 Kv Cross Arm Cl (Provided By The Dept.) , Erection Of 11 Kv M/S Base Angle (Provided By The Dept.) , Erection Of Cross Arm V-Type 11 Kv (Provided By The Dept.) , Erection Of Dp Cl For Pcc Pole 8.5 Mtr. Long (Provided By The Dept.) , Erection Of F Cl For Pcc Pole 8.5 Mtr. Long (Provided By The Dept.) , Erection Of 11 Kv Dropper Channel 100X50x5x2028 (Provided By The Dept.) , Erection Of Top Channel 100X50x5x2240 (Provided By The Dept.) , Erection Of T-Off Channel 100X50x5x1300 Mm (Provided By The Dept.) , Erection Of Stay Complete (Provided By The Dept.) , Erection Of Earthing Complate (Provided By The Dept.) , Lt Cl For Pcc Pole 8.5 Mtr. (Provided By The Dept.) , Erection Of Gi Wire 10 Swg (Provided By The Dept.) , Erection Of Gi Wire 6 Swg (Provided By The Dept.) , Laying, Stringing Acsr Weasel Conductor (Provided By The Dept.) , Laying Of 11 Kv Cable Including Cost Of Sand & Bricks 3X185 Sqmm Xlpe Cable As Required As Per Respo Norms And Direction By Supervising Engineer. (Cable Provided By The Dept.) , Laying, Stringing, Binding And Termination Etc. Of Lt Ab Cable 3X50+1X35+1X16 Mm Sq. On The Newly Erected Line As Per Direction Of Supervising Engineer/Resspo Manual (A.B. Cable Provided By The Dept.) , Fixing Of Distribution Box 3 Phase With Cl Nut & Bolt (Provided By The Dept.) , Cartage & Erection Of St Pole 11 Mtr. Long (Provided By The Dept.) , Cartage & Erection Of Pcc Pole 8.5 Mtr. Long (Provided By The Dept.) , Resagging & Re-Erection Of Tilted Pole Of 0.8 Km Line , Tree Cutting , Concreting Of Support Stay Set. Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Concreting Of Support Pcc/St Pole. Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Note: Any Quantity Of Item From Sl No. 1 To Sl No. 2.34 May Vary To Any Limit Within The Financial Value Of Agreement Against This Tender.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-Sep-2026 | 10-Sep-2026 | ||
| 2 | 16-Sep-2026 | 21-Sep-2026 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Supply of following materials :- | Supply of following materials :- |
| 2 | Eye Hook | Eye Hook |
| 3 | Dead & Clamp | Dead & Clamp |
| 4 | 11 KV KV 3X185 Sqmm Cable Jointing Kit OutdoorType as per RESSPO manual. | 11 KV KV 3X185 Sqmm Cable Jointing Kit OutdoorType as per RESSPO manual. |
| 5 | Nut & Bolt Washer | Nut & Bolt Washer |
| 6 | 11 KV Danger Board with Clamp & Nut & Bolt | 11 KV Danger Board with Clamp & Nut & Bolt |
| 7 | Stone Pad | Stone Pad |
| 8 | Suspension Clamp | Suspension Clamp |
| 9 | Piercing Connector | Piercing Connector |
| 10 | Erection/Instalation/Fixing of following :- | Erection/Instalation/Fixing of following :- |
| 11 | Erection of Eye Hook | Erection of Eye Hook |
| 12 | Erection Dead & Clamp | Erection Dead & Clamp |
| 13 | Filling of 11 KV KV 3X185 Sqmm Cable Jointing Kit OutdoorType as per RESSPO manual. | Filling of 11 KV KV 3X185 Sqmm Cable Jointing Kit OutdoorType as per RESSPO manual. |
| 14 | Erection Nut & Bolt Washer | Erection Nut & Bolt Washer |
| 15 | Erection of 11 KV Danger Board with Clamp & Nut & Bolt | Erection of 11 KV Danger Board with Clamp & Nut & Bolt |
| 16 | Erection of Stone Pad | Erection of Stone Pad |
| 17 | Erection of Suspension Clamp | Erection of Suspension Clamp |
| 18 | Erection of Piercing Connector | Erection of Piercing Connector |
| 19 | Erection of 11 KV Composite Polymer Pin Insulator (Provided by the Dept.) | Erection of 11 KV Composite Polymer Pin Insulator (Provided by the Dept.) |
| 20 | 11 KV Disc Inslulator with Fitting (Provided by the Dept.) | 11 KV Disc Inslulator with Fitting (Provided by the Dept.) |
| 21 | Erection of 11 KV Polymer Disc Insulator (T&C) 45KN (Provided by the Dept.) | Erection of 11 KV Polymer Disc Insulator (T&C) 45KN (Provided by the Dept.) |
| 22 | Erection of 11 KV Cross Arm Clamp (Provided by the Dept.) | Erection of 11 KV Cross Arm Clamp (Provided by the Dept.) |
| 23 | Erection of 11 KV M/S Base Angle (Provided by the Dept.) | Erection of 11 KV M/S Base Angle (Provided by the Dept.) |
| 24 | Erection of Cross Arm V-Type 11 KV (Provided by the Dept.) | Erection of Cross Arm V-Type 11 KV (Provided by the Dept.) |
| 25 | Erection of DP Clamp for PCC Pole 8.5 Mtr. Long (Provided by the Dept.) | Erection of DP Clamp for PCC Pole 8.5 Mtr. Long (Provided by the Dept.) |
| 26 | Erection of F Clamp for PCC Pole 8.5 Mtr. Long (Provided by the Dept.) | Erection of F Clamp for PCC Pole 8.5 Mtr. Long (Provided by the Dept.) |
| 27 | Erection of 11 KV Dropper Channel 100X50X5X2028 (Provided by the Dept.) | Erection of 11 KV Dropper Channel 100X50X5X2028 (Provided by the Dept.) |
| 28 | Erection of Top Channel 100X50X5X2240 (Provided by the Dept.) | Erection of Top Channel 100X50X5X2240 (Provided by the Dept.) |
| 29 | Erection of T-Off Channel 100X50X5X1300 MM (Provided by the Dept.) | Erection of T-Off Channel 100X50X5X1300 MM (Provided by the Dept.) |
| 30 | Erection of Stay Complete (Provided by the Dept.) | Erection of Stay Complete (Provided by the Dept.) |
| 31 | Erection of Earthing Complate (Provided by the Dept.) | Erection of Earthing Complate (Provided by the Dept.) |
| 32 | LT Clamp for PCC Pole 8.5 Mtr. (Provided by the Dept.) | LT Clamp for PCC Pole 8.5 Mtr. (Provided by the Dept.) |
| 33 | Erection of GI Wire 10 SWG (Provided by the Dept.) | Erection of GI Wire 10 SWG (Provided by the Dept.) |
| 34 | Erection of GI Wire 6 SWG (Provided by the Dept.) | Erection of GI Wire 6 SWG (Provided by the Dept.) |
| 35 | Laying, stringing ACSR Weasel Conductor (Provided by the Dept.) | Laying, stringing ACSR Weasel Conductor (Provided by the Dept.) |
| 36 | Laying of 11 KV Cable including cost of Sand & Bricks 3x185 sqmm xlpe cable as required as per RESPO norms and direction by supervising Engineer. (Cable Provided by the Dept.) | Laying of 11 KV Cable including cost of Sand & Bricks 3x185 sqmm xlpe cable as required as per RESPO norms and direction by supervising Engineer. (Cable Provided by the Dept.) |
| 37 | Laying, stringing, binding and Termination etc. of LT AB Cable 3x50+1x35+1x16 mm sq. on the newly erected Line as per direction of supervising engineer/RESSPO manual (A.B. CABLE Provided by the Dept.) | Laying, stringing, binding and Termination etc. of LT AB Cable 3x50+1x35+1x16 mm sq. on the newly erected Line as per direction of supervising engineer/RESSPO manual (A.B. CABLE Provided by the Dept.) |
| 38 | Fixing of Distribution Box 3 Phase with Clamp Nut & Bolt (Provided by the Dept.) | Fixing of Distribution Box 3 Phase with Clamp Nut & Bolt (Provided by the Dept.) |
| 39 | Cartage & Erection of ST Pole 11 Mtr. Long (Provided by the Dept.) | Cartage & Erection of ST Pole 11 Mtr. Long (Provided by the Dept.) |
| 40 | Cartage & Erection of PCC Pole 8.5 Mtr. Long (Provided by the Dept.) | Cartage & Erection of PCC Pole 8.5 Mtr. Long (Provided by the Dept.) |
| 41 | Resagging & Re-Erection of Tilted Pole of 0.8 KM Line | Resagging & Re-Erection of Tilted Pole of 0.8 KM Line |
| 42 | Tree Cutting | Tree Cutting |
| 43 | Concreting of Support Stay Set. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support Stay Set. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 44 | Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 45 | Note: Any quantity of item from sl no. 1 to sl no. 2.34 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 2.34 may vary to any limit within the financial value of agreement against this tender. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender