Bids Are invited for Expression Of Interest For Integrated Fuel Transaction Management System Across Central Coalfields - Weighbridge Automation Software System With Dashboard, Base License With Support Upto 250 Licenses (To Be Hosted On Cloud Platform) In
Tender Overview
Project Description
Bids Are invited for Expression Of Interest For Integrated Fuel Transaction Management System Across Central Coalfields - Weighbridge Automation Software System With Dashboard, Base License With Support Upto 250 Licenses (To Be Hosted On Cloud Platform) Including Customizations As Per Requirement Of Ccl , Vehicle Tracking Application Module For 3 Years Including Gis Maps, Geofencing, Various Other Vehicle Tracking Modules Etc. (To Be Hosted On Cloud Platform) Including Customizations As Per Requirement Of Ccl. , Anpr Analytics Software License Component For 3 Years With Customizations As Per Requirement Of Ccl. (To Be Hosted On Cloud Platform Along With Deployment In Workstation-Pcs In Ccl Sites) , Integration With Other Vendor Applications Like Sap, Jimms, Weighment Scale/Digitizer Etc. , Rfid Reader/ Writer (Bis Certified)- Passive Long Range Uhf Rfid Reader With Tcp/Ip Port With Pole And Mounting Arrangement. , Desktop Rfid Writer - Uhf Reader And Writer With Usb Cable , Rfid Tags (Non Re-Usable, Non-Cloneable) , Reflective Acrylic Sticker With Standard Font On Windshield For Registration Number Recognition (To Pasted On The Interior Of The Vehicle On The Windshield) , Boom Barrier System - With Boom Machine, Trigger Switch, Safety Sensors, 5 Meters Boom, And 2 Colored Led Traffic Light , Weighbridge Centering System Along With All Necessary Accessories Like Sensors, Poles, Etc. As Per System Requirement , Workstation-Pc With Monitor, Usb Keyboard, Mouse And Other Printing And Power Backup Accessories. , Local Client Application Software License With Customizations As Per Requirement Of Ccl , Constant Voltage Transformerinput/Output Voltage 5.0 Kva Automatic Line Voltage Corrector (Step Type Auto Transformer) , Fixed Camera 4 Mp Fixed Lens Bullet Camera(To Be Installed As A Protusion From The Roof Of Wb/Checkpost Building, Along With Necessary Accessories For Installation) , Fixed Camera 5 Mp Motorised Varifocal Bullet Camera , Nvr 4 Channel Loaded With Hdd Capacity Of 10 Tb , Multiport Managed L2 Switch , 21 Led Display Monitor With Wall Mount & Hdmi Cable To Display The Camera View At Sites , 85 Led Tv With Wall Mount & Hdmi Cable To Display The Camera View At Ccl Hq With Laptop , 9U Indoor Rack , Complete Class I Chemical Earthing For All Equipment At Site , Lightning Arrestor As Per System Requirement , Surge Protection Devices (Spds) , Vehicle Tracking System With 4G -Dual Sim Gprs Based Gps Device Along With Installation In Vehicles , Installation, Testing & Commissioning Charges Including Electrical Piping, Cabling & Wiring Along With Sockets, Connectors, Plugs, Mcbs Etc., And All Other Material/Civil Jobs Required For Successful Commissioning Of The System As Per Scope Of Work. , Project I , Hosting Of Data Application On Cloud Platform Charges For 1St Year , Hosting Of Data Application On Cloud Platform Charges For 2Nd Year , Hosting Of Data Application On Cloud Platform Charges For 3Rd Year , Vts Annual Subscription Charges For 1St Year , Vts Annual Subscription Charges For 2Nd Year , Vts Annual Subscription Charges For 3Rd Year , Skilled Manpower Charges For 1St Year , Skilled Manpower Charges For 2Nd Year , Skilled Manpower Charges For 3Rd Year , Camc & O&M For Central Data Center Component And Software Services For 1St Year Post Warranty , Camc & O&M For Central Data Centre Component And Software Services For 2Nd Year Post Warranty , Camc & O&M For Weighbridges And Site Components And Vts For 1St Year Post Warranty , Camc & O&M For Weighbridges And Site Components And Vts For 2Nd Year Post Warranty
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Weighbridge Automation Software System with Dashboard, base license with support upto 250 Licenses (To be Hosted on Cloud Platform) including customizations as per requirement of CCL | Weighbridge Automation Software System with Dashboard, base license with support upto 250 Licenses (To be Hosted on Cloud Platform) including customizations as per requirement of CCL |
| 2 | Vehicle Tracking Application Module for 3 years including GIS Maps, Geofencing, various other vehicle tracking modules etc. (To be Hosted on Cloud Platform) including customizations as per requirement of CCL. | Vehicle Tracking Application Module for 3 years including GIS Maps, Geofencing, various other vehicle tracking modules etc. (To be Hosted on Cloud Platform) including customizations as per requirement of CCL. |
| 3 | ANPR analytics software license component for 3 years with customizations as per requirement of CCL. (To be hosted on Cloud Platform along with deployment in Workstation-PCs in CCL sites) | ANPR analytics software license component for 3 years with customizations as per requirement of CCL. (To be hosted on Cloud Platform along with deployment in Workstation-PCs in CCL sites) |
| 4 | Integration with other vendor applications like SAP, JIMMS, Weighment Scale/digitizer etc. | Integration with other vendor applications like SAP, JIMMS, Weighment Scale/digitizer etc. |
| 5 | RFID reader/ writer (BIS Certified)- Passive Long Range UHF RFID Reader with TCP/IP Port with pole and mounting arrangement. | RFID reader/ writer (BIS Certified)- Passive Long Range UHF RFID Reader with TCP/IP Port with pole and mounting arrangement. |
| 6 | Desktop RFID Writer - UHF Reader and Writer with USB Cable | Desktop RFID Writer - UHF Reader and Writer with USB Cable |
| 7 | RFID tags (non re-usable, non-cloneable) | RFID tags (non re-usable, non-cloneable) |
| 8 | Reflective acrylic sticker with standard font on windshield for registration number recognition (To pasted on the interior of the vehicle on the windshield) | Reflective acrylic sticker with standard font on windshield for registration number recognition (To pasted on the interior of the vehicle on the windshield) |
| 9 | Boom Barrier System - with Boom Machine, trigger switch, safety sensors, 5 meters Boom, and 2 colored LED Traffic Light | Boom Barrier System - with Boom Machine, trigger switch, safety sensors, 5 meters Boom, and 2 colored LED Traffic Light |
| 10 | Weighbridge Centering System along with all necessary accessories like sensors, poles, etc. as per system requirement | Weighbridge Centering System along with all necessary accessories like sensors, poles, etc. as per system requirement |
| 11 | Workstation-PC with Monitor, USB Keyboard, Mouse and other printing and power backup accessories. | Workstation-PC with Monitor, USB Keyboard, Mouse and other printing and power backup accessories. |
| 12 | Local client application software license with customizations as per requirement of CCL | Local client application software license with customizations as per requirement of CCL |
| 13 | Constant Voltage TransformerInput/Output voltage 5.0 KVA Automatic Line Voltage Corrector (Step Type Auto Transformer) | Constant Voltage TransformerInput/Output voltage 5.0 KVA Automatic Line Voltage Corrector (Step Type Auto Transformer) |
| 14 | Fixed Camera 4 MP Fixed Lens Bullet Camera(To be installed as a protusion from the roof of WB/checkpost building, along with necessary accessories for installation) | Fixed Camera 4 MP Fixed Lens Bullet Camera(To be installed as a protusion from the roof of WB/checkpost building, along with necessary accessories for installation) |
| 15 | Fixed Camera 5 MP Motorised Varifocal Bullet Camera | Fixed Camera 5 MP Motorised Varifocal Bullet Camera |
| 16 | NVR 4 Channel loaded with HDD capacity of 10 TB | NVR 4 Channel loaded with HDD capacity of 10 TB |
| 17 | Multiport managed L2 switch | Multiport managed L2 switch |
| 18 | 21\\" LED display monitor with Wall mount & HDMI cable to display the camera view at sites | 21\\" LED display monitor with Wall mount & HDMI cable to display the camera view at sites |
| 19 | 85\\" LED TV with Wall mount & HDMI cable to display the camera view at CCL HQ with Laptop | 85\\" LED TV with Wall mount & HDMI cable to display the camera view at CCL HQ with Laptop |
| 20 | 9U indoor rack | 9U indoor rack |
| 21 | Complete Class I chemical Earthing for All Equipment at site | Complete Class I chemical Earthing for All Equipment at site |
| 22 | Lightning arrestor as per system requirement | Lightning arrestor as per system requirement |
| 23 | Surge Protection Devices (SPDs) | Surge Protection Devices (SPDs) |
| 24 | Vehicle Tracking System with 4G -dual SIM GPRS based GPS device along with installation in vehicles | Vehicle Tracking System with 4G -dual SIM GPRS based GPS device along with installation in vehicles |
| 25 | Installation, Testing & Commissioning Charges including electrical piping, cabling & wiring along with sockets, connectors, plugs, MCBs etc., and all other material/civil jobs required for successful commissioning of the System as per Scope of Work. | Installation, Testing & Commissioning Charges including electrical piping, cabling & wiring along with sockets, connectors, plugs, MCBs etc., and all other material/civil jobs required for successful commissioning of the System as per Scope of Work. |
| 26 | PROJECT I | PROJECT I |
| 27 | Hosting of Data Application on Cloud Platform Charges for 1st year | Hosting of Data Application on Cloud Platform Charges for 1st year |
| 28 | Hosting of Data Application on Cloud Platform Charges for 2nd year | Hosting of Data Application on Cloud Platform Charges for 2nd year |
| 29 | Hosting of Data Application on Cloud Platform Charges for 3rd year | Hosting of Data Application on Cloud Platform Charges for 3rd year |
| 30 | VTS Annual subscription charges for 1st year | VTS Annual subscription charges for 1st year |
| 31 | VTS Annual subscription charges for 2nd year | VTS Annual subscription charges for 2nd year |
| 32 | VTS Annual subscription charges for 3rd year | VTS Annual subscription charges for 3rd year |
| 33 | Skilled Manpower charges for 1st year | Skilled Manpower charges for 1st year |
| 34 | Skilled Manpower charges for 2nd year | Skilled Manpower charges for 2nd year |
| 35 | Skilled Manpower charges for 3rd year | Skilled Manpower charges for 3rd year |
| 36 | CAMC & O&M for central data center component and Software Services for 1st year post warranty | CAMC & O&M for central data center component and Software Services for 1st year post warranty |
| 37 | CAMC & O&M for central data Centre component and Software Services for 2nd year post warranty | CAMC & O&M for central data Centre component and Software Services for 2nd year post warranty |
| 38 | CAMC & O&M for weighbridges and site components and VTS for 1st year post warranty | CAMC & O&M for weighbridges and site components and VTS for 1st year post warranty |
| 39 | CAMC & O&M for weighbridges and site components and VTS for 2nd year post warranty | CAMC & O&M for weighbridges and site components and VTS for 2nd year post warranty |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender