Power Boards / Undertakings / PSU Closing in 17 days TDR #57161969

Tender For Giving Lt Ht Sc To Consumers Under Banlekh Section Under Edsd 2Nd Bageshwar Under Nsc Head

Issued by Boards / Undertakings / PSU · Bageshwar, Uttarakhand
Tender Value
15 Lakhs
Estimated cost
Bid Submission
10 Sep 2026
17 days left
EMD
45000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bageshwar → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Giving Lt Ht Sc To Consumers Under Banlekh Section Under Edsd 2Nd Bageshwar Under Nsc Head- 1 Supply Of Items :- 2 Lt Shackle Insulator 100X115 Mm With N&B 3 Lt Shackle Insulator Clamp For Sp-10 Pole With N&B 4 Lt Shackle Insulator Clamp For Sp-21 Pole With N&B 5 Lt Stay Insulator 6 Lt Stay Clamp For Sp-10 Pole With N&B 7 Lt Stay Clamp For Sp-21 Pole With N&B 8 Earth Wire Clamp For Sp-10 Pole With N&B 9 Earth Wire Clamp For Sp-21 Pole With N&B 10 Holding Clamp For Sp-23 Pole With N&B 11 Stay Clamp S/Ended For Sp-23 Pole With N&B 12 Stay Clamp D/Ended For Sp-23 Pole With N&B 13 Breasing Clamp Top For Sp-23 Pole With N&B 14 Breasing Clamp Bottom For Sp-23 Pole With N&B 15 Earth Wire Clamp For Sp-23 With N&B 16 E-Clamp For 11 Kv Pin 17 Tpmo Handle Holding Clamp For Sp-23 Pole With N&B 18 11 Kv Fuse Set 19 Pg Clamp Rabbit To Rabbit 20 Pg Clamp Weasel To Weasel 21 Ht Stay Inulator 22 Labour Charges :- 23 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (0-20Km) 24 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (21-50Km) 25 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (51-70Km) 26 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (71-100Km) 27 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (100-150Km) 28 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (150-200Km) 29 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (0-20Km) 30 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (21-50Km) 31 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (51-70Km) 32 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (71-100Km) 33 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (100-150Km) 34 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (150-200Km) 35 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (0-20Km) 36 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (21-50Km) 37 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (51-70Km) 38 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (71-100Km) 39 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (100-150Km) 40 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (150-200Km) 41 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (0-20Km) 42 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (21-50Km) 43 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (51-70Km) 44 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (71-100Km) 45 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (100-150Km) 46 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (150-200Km) 47 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (0-20Km) 48 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (21-50Km) 49 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (51-70Km) 50 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (71-100Km) 51 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (100-150Km) 52 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (150-200Km) 53 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (0-20Km) 54 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (21-50Km) 55 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (51-70Km) 56 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (71-100Km) 57 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (100-150Km) 58 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (150-200Km) 59 Head Load Cartage Of St Pole 8.0 Mtr Sp-10 From Road To Site (Upto 0.0 To 1.0 Km) 60 Head Load Cartage Of St Pole 8.0 Mtr Sp-10 From Road To Site (Upto 1.0 To 3.0 Km) 61 Head Load Cartage Of St Pole 8.5 Mtr Sp-21/23 From Road To Site (Upto 0.0 To 1.0 Km) 62 Head Load Cartage Of St Pole 8.5 Mtr Sp-21/23 From Road To Site (Upto 1.0 To 3.0 Km) 63 Head Load Cartage Of Small Material. (Up To 0.0 To 1.0 Km) 64 Head Load Cartage Of Small Material. (Up To 1.0 To 3.0 Km) 65 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 16Kva Along With Loading/ Unloading At Both Points. (Up To 0 To 1 Km) 66 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 16Kva Along With Loading/ Unloading At Both Points. (Up To 1 To 3 Km) 67 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 25Kva Along With Loading/ Unloading At Both Points. (Up To 0 To 1 Km) 68 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 25Kva Along With Loading/ Unloading At Both Points. (Up To 1 To 3 Km) 69 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 63Kva Along With Loading/ Unloading At Both Points. (Up To 0 To 1 Km) 70 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 63Kva Along With Loading/ Unloading At Both Points. (Up To 1 To 3 Km) 71 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 100Kva Along With Loading/ Unloading At Both Points. (Up To 0 To 1 Km) 72 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 100Kva Along With Loading/ Unloading At Both Points. (Up To 1 To 3 Km) 73 Excavation Of Earth For Pole Pit Of Size 0.9X0.6X1/6 Of Full Length Of Ple For Erection Of Pole In All Type Of Soil Including Proper Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed Complete Work. 74 Erection Of St Pole 8.0 Mtr Sp-10 Single Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel & Clamps As Per Resspo Construction Manual. 75 Erection Of St Pole 8.0 Mtr Sp-21 Single Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel & Clamps As Per Resspo Construction Manual. 76 Erection Of St Pole 8.0 Mtr Sp-23 Single Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel & Clamps As Per Resspo Construction Manual. 77 Erection Of Sp-23 Double Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel, X-Bracing & Clamps As Per Resspo Construction Manual. 78 Grouting Of Pole In Size 0.45X0.45X1/9 Of The Support In Cc Ratio 1:4:8 (1 Cement: 4 Graded Stone 20 Mm Nominal Size : 8 Coarse Sand) Block Including Cost Of Cement , Sand And Stone Ballast Back Filling Of Soil And Boulders In Pit And Ramming And Proper Alignment , Leveling As Per Resspo Construction Manual. 79 Muffing Of Poles Size 0.45 Cm X 0.60 Cm Radious With Cc 1:3:6 (1 Cement: 3 Coarse Sand: 6 Graded Stone 10 Mm Nominal Size) Block Size 45 Cm Height From Ground Level Including Cost Of Cement , Stone And Sand Etc. 80 Fabrication Of M.S Channel Angle Iron After Cutting In Required Sizes With Drilling Of Holes Up To Good Finish For Top Channel, Bracing And Special Type Bracket Etc. As Per Resspo Sehedule And Local Approved Drawing. 81 Excavation Of Earth For Stay Pit Of Size 0.6X0.6X1.2 Mtr In All Type Of Soil Including Proper Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed Complete Work. 82 Fixing, Tightening And Nozzalling Of Lt Stay With Pole And Stay Rod On Required Tension As Per Drawing / Resspo Manual. 83 Fixing, Tightening And Nozzalling Of 11Kv Line Stay With Pole And Stay Rod On Required Tension As Per Drawing / Resspo Manual. 84 Grouting Of Stay In Size 0.6X0.6X0.3 In Cc Ratio 1:4:8 (1 Cement: 4 Graded Stone 20 Mm Nominal Size : 8 Coarse Sand) Block Including Cost Of Cement , Sand And Stone Ballast Back Filling Of Soil And Boulders In Pit And Ramming And Proper Alignment , Leveling As Per Resspo Manual. 85 Earthing Of Support With M.S. Earth Rod Of 2.5 Meter Long By Hammaring Of M.S. Rod To Proper Depth And Connecting The Earth Electrode With The Help Of G.I. Wire As Per Construction Manual. 86 Laying, Spreading, Stringing And Sagging Of 11 Kv /33Kv Line In 3 Phase ( 3 Phase 4 Wire) Of The Acsr Weasel Conductor As Phase Wire With G.I. Earth Wire Complete Including Fixing Of All Accessories In 3 Nos. Conductor In Parallel With Binding And Jumpering As Per Profile And Sagging Chart. 87 Laying Spreading Stringing And Sagging Of 11 Kv /33Kv Line In 3 Phase ( 3 Phase 4 Wire) Of The Acsr Rabbit Conductor As Phase Wire With G.I. Earth Wire Complete Including Fixing Of All Accessories In 3 Nos. Conductor In Parallel With Binding And Jumpering As Per Profile And Sagging Chart. 88 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 3Phase5Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 89 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 3Phase4Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 90 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 2Phase3Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 91 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 1Phase2Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 92 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 3Phase5Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 93 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 3Phase4Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 94 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 2Phase3Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 95 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 1Phase2Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 96 Laying Sagging And Stringing Of Lt Ab Cable Of Size 3X25/35 Sqmm. 97 Laying Sagging And Stringing Of Lt Ab Cable Of Size 1X25/35 Sqmm. 98 Chemical Earthing : Earthing Of Distribution Transformer Including Digging Of Pit Of Size 2.5 Mtr Depth And Make Hole Of Size 150 Mm. Placing Of Earthing Electrode (To Be Supplied By Contractor As Per Drawing No. A ) As Drawing B, Connecting The Same With G.I Strip ( To Be Supplied By Contractor ) Of Size 35X6 Mm As Per Drawing Cfor A Minimum Length 6 M. Treatment Of Soil With Highly Condctive Substance As Per Is 30343 Complete In All Respect, Result Of Earthing Resistance After Earthing Should Be Less Than 1 Ohm. 99 Guarding Of Lt/11Kv Line Over ( Telephone / Road /L.T. Line Crossing As Per Drawing With 6/8 Swg G.I. Including Fixing Of Guarding Channel / Angle As Per Ressp Manual L.T /11 Kv. 100 Laying And Erection Of L.T. Pvc Cable Including Crimping Of Lugs Of Size 1X70,120,150 Sq. Mm. (Including All Cost Of Material) 101 Laying And Erection Of L.T. Pvc Single Lead Cable Including Crimping Of Lugs Of Size 1X240,400,680 Sq. Mm. Etc (Including All Cost Of Material) 102 Mounting & Fixing Of Tpmo On Double Pole Structures Including Making Of Connections Complete Work. 103 Mounting & Fixing Of Fuse Sets On Double Pole Structures Including Making Of Connections Complete Work 104 Mounting And Fixing Of Lighting Arrestor Set (3 Nos.) On Double Pole Structure Including Making All Connections By G.I. Strip Size 35X6 Mm To Earth Point Complete Work (Excluding Cost Of G.I. Strip) 105 Painting Of St Pole Sp-23/21 Poles With Angle Channel And All Steel Part By One Coat Of Rod Oxide Primer And Two Coats Of Aluminium Paint And Two Strip Of Fluorescent Altemate Red And Whiter Paint 30 Cm Wide Up To 1.5 Mtrs. From Ground Level. 106 Painting Of St Pole Sp-10 Poles With Angle Channel And All Steel Part By One Coat Of Rod Oxide Primer And Two Coats Of Aluminium Paint And Two Strip Of Fluorescent Altemate Red And Whiter Paint 30 Cm Wide Up To 1.5 Mtrs. From Ground Level. 107 Jointing And Fixing Of 11Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor/ Outdoor Cable Bosex. 108 Dismantling Of 100Kva Transformers From Double Pole /Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 109 Dismantling Of 63Kva Transformers From Double Pole /Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 110 Dismantling Of 25Kva Transformers From Double Pole /Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 111 Dismantling Of 16Kva Transformers From Double Pole /Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 112 Installation / Mounting Of New 100Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 113 Installation / Mounting Of New 63Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 114 Installation / Mounting Of New 25Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 115 Installation / Mounting Of New 16Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 116 Route Cleareance By Cutting Of Tree Branches / Proning, Loping And Chopping Of Trees For L.T, 11& 33 Kv Line. 117 T - Off Connection Complete 11 Kv Line. 118 Providing And Fixing Of Danger Board And Number Plate Complete By Providing Of Mrs. Flat 50X6 Mm And Nuts & Bolts, Danger Boards Of M.S Sheet 2 Mm Thick 11\X7\ Size (Including Cost Of All Material)

AI Tender Summary

OUR REF NO 57161969
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 15 Lakhs
LAST DATE 10-09-2026
Authority
Authority Name Uttarakhand Power Corporation Limited
Work Description Tender For Giving Lt Ht Sc To Consumers Under Banlekh Section Under Edsd 2Nd Bageshwar Under Nsc Head- 1 Supply Of Items :- 2 Lt Shackle Insulator 100X115 Mm With N&B 3 Lt Shackle Insulator Clamp For Sp-10 Pole With N&B 4 Lt Shackle Insulator Clamp For Sp-21 Pole With N&B 5 Lt Stay Insulator 6 Lt Stay Clamp For Sp-10 Pole With N&B 7 Lt Stay Clamp For Sp-21 Pole With N&B 8 Earth Wire Clamp For Sp-10 Pole With N&B 9 Earth Wire Clamp For Sp-21 Pole With N&B 10 Holding Clamp For Sp-23 Pole With N&B 11 Stay Clamp S/Ended For Sp-23 Pole With N&B 12 Stay Clamp D/Ended For Sp-23 Pole With N&B 13 Breasing Clamp Top For Sp-23 Pole With N&B 14 Breasing Clamp Bottom For Sp-23 Pole With N&B 15 Earth Wire Clamp For Sp-23 With N&B 16 E-Clamp For 11 Kv Pin 17 Tpmo Handle Holding Clamp For Sp-23 Pole With N&B 18 11 Kv Fuse Set 19 Pg Clamp Rabbit To Rabbit 20 Pg Clamp Weasel To Weasel 21 Ht Stay Inulator 22 Labour Charges :- 23 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (0-20Km) 24 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (21-50Km) 25 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (51-70Km) 26 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (71-100Km) 27 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (100-150Km) 28 Cartage Of St Pole 8.0 Mtr Sp- 10 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (150-200Km) 29 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (0-20Km) 30 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (21-50Km) 31 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (51-70Km) 32 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (71-100Km) 33 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (100-150Km) 34 Cartage Of St Pole 8.5 Mtr Sp- 21/23 From Store Centre To Construction Site With Loading, Unloading At Both Points And Proper Stacking (150-200Km) 35 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (0-20Km) 36 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (21-50Km) 37 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (51-70Km) 38 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (71-100Km) 39 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (100-150Km) 40 Cartage Of Material (Other Than Poles) By Vehicle From Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends (150-200Km) 41 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (0-20Km) 42 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (21-50Km) 43 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (51-70Km) 44 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (71-100Km) 45 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (100-150Km) 46 Cartage Of The Transformer 11/0.4Kv, 16/25 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (150-200Km) 47 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (0-20Km) 48 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (21-50Km) 49 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (51-70Km) 50 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (71-100Km) 51 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (100-150Km) 52 Cartage Of The Transformer 11/0.4Kv, 63 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (150-200Km) 53 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (0-20Km) 54 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (21-50Km) 55 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (51-70Km) 56 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (71-100Km) 57 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (100-150Km) 58 Cartage Of The Transformer 11/0.4Kv, 100 Kva Capacity From Store Center To Construction Site With Loading And Unloading At Both Points (150-200Km) 59 Head Load Cartage Of St Pole 8.0 Mtr Sp-10 From Road To Site (Upto 0.0 To 1.0 Km) 60 Head Load Cartage Of St Pole 8.0 Mtr Sp-10 From Road To Site (Upto 1.0 To 3.0 Km) 61 Head Load Cartage Of St Pole 8.5 Mtr Sp-21/23 From Road To Site (Upto 0.0 To 1.0 Km) 62 Head Load Cartage Of St Pole 8.5 Mtr Sp-21/23 From Road To Site (Upto 1.0 To 3.0 Km) 63 Head Load Cartage Of Small Material. (Up To 0.0 To 1.0 Km) 64 Head Load Cartage Of Small Material. (Up To 1.0 To 3.0 Km) 65 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 16Kva Along With Loading/ Unloading At Both Points. (Up To 0 To 1 Km) 66 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 16Kva Along With Loading/ Unloading At Both Points. (Up To 1 To 3 Km) 67 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 25Kva Along With Loading/ Unloading At Both Points. (Up To 0 To 1 Km) 68 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 25Kva Along With Loading/ Unloading At Both Points. (Up To 1 To 3 Km) 69 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 63Kva Along With Loading/ Unloading At Both Points. (Up To 0 To 1 Km) 70 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 63Kva Along With Loading/ Unloading At Both Points. (Up To 1 To 3 Km) 71 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 100Kva Along With Loading/ Unloading At Both Points. (Up To 0 To 1 Km) 72 Head Load Cartage/ Manual Shifting/ Lifting With Crane/Hydra Of The Transformer 11/0.4Kv, 100Kva Along With Loading/ Unloading At Both Points. (Up To 1 To 3 Km) 73 Excavation Of Earth For Pole Pit Of Size 0.9X0.6X1/6 Of Full Length Of Ple For Erection Of Pole In All Type Of Soil Including Proper Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed Complete Work. 74 Erection Of St Pole 8.0 Mtr Sp-10 Single Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel & Clamps As Per Resspo Construction Manual. 75 Erection Of St Pole 8.0 Mtr Sp-21 Single Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel & Clamps As Per Resspo Construction Manual. 76 Erection Of St Pole 8.0 Mtr Sp-23 Single Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel & Clamps As Per Resspo Construction Manual. 77 Erection Of Sp-23 Double Support Pole In Proper Level And Alignment Along With Fixing Of All Accessories, Like Top Channel, X-Bracing & Clamps As Per Resspo Construction Manual. 78 Grouting Of Pole In Size 0.45X0.45X1/9 Of The Support In Cc Ratio 1:4:8 (1 Cement: 4 Graded Stone 20 Mm Nominal Size : 8 Coarse Sand) Block Including Cost Of Cement , Sand And Stone Ballast Back Filling Of Soil And Boulders In Pit And Ramming And Proper Alignment , Leveling As Per Resspo Construction Manual. 79 Muffing Of Poles Size 0.45 Cm X 0.60 Cm Radious With Cc 1:3:6 (1 Cement: 3 Coarse Sand: 6 Graded Stone 10 Mm Nominal Size) Block Size 45 Cm Height From Ground Level Including Cost Of Cement , Stone And Sand Etc. 80 Fabrication Of M.S Channel Angle Iron After Cutting In Required Sizes With Drilling Of Holes Up To Good Finish For Top Channel, Bracing And Special Type Bracket Etc. As Per Resspo Sehedule And Local Approved Drawing. 81 Excavation Of Earth For Stay Pit Of Size 0.6X0.6X1.2 Mtr In All Type Of Soil Including Proper Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed Complete Work. 82 Fixing, Tightening And Nozzalling Of Lt Stay With Pole And Stay Rod On Required Tension As Per Drawing / Resspo Manual. 83 Fixing, Tightening And Nozzalling Of 11Kv Line Stay With Pole And Stay Rod On Required Tension As Per Drawing / Resspo Manual. 84 Grouting Of Stay In Size 0.6X0.6X0.3 In Cc Ratio 1:4:8 (1 Cement: 4 Graded Stone 20 Mm Nominal Size : 8 Coarse Sand) Block Including Cost Of Cement , Sand And Stone Ballast Back Filling Of Soil And Boulders In Pit And Ramming And Proper Alignment , Leveling As Per Resspo Manual. 85 Earthing Of Support With M.S. Earth Rod Of 2.5 Meter Long By Hammaring Of M.S. Rod To Proper Depth And Connecting The Earth Electrode With The Help Of G.I. Wire As Per Construction Manual. 86 Laying, Spreading, Stringing And Sagging Of 11 Kv /33Kv Line In 3 Phase ( 3 Phase 4 Wire) Of The Acsr Weasel Conductor As Phase Wire With G.I. Earth Wire Complete Including Fixing Of All Accessories In 3 Nos. Conductor In Parallel With Binding And Jumpering As Per Profile And Sagging Chart. 87 Laying Spreading Stringing And Sagging Of 11 Kv /33Kv Line In 3 Phase ( 3 Phase 4 Wire) Of The Acsr Rabbit Conductor As Phase Wire With G.I. Earth Wire Complete Including Fixing Of All Accessories In 3 Nos. Conductor In Parallel With Binding And Jumpering As Per Profile And Sagging Chart. 88 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 3Phase5Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 89 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 3Phase4Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 90 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 2Phase3Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 91 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Weasel Conductor 1Phase2Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 92 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 3Phase5Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 93 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 3Phase4Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 94 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 2Phase3Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 95 Laying, Spreading, Stringing And Sagging Of L.T.Lines Of The Acsr Rabbit Conductor 1Phase2Wire As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 96 Laying Sagging And Stringing Of Lt Ab Cable Of Size 3X25/35 Sqmm. 97 Laying Sagging And Stringing Of Lt Ab Cable Of Size 1X25/35 Sqmm. 98 Chemical Earthing : Earthing Of Distribution Transformer Including Digging Of Pit Of Size 2.5 Mtr Depth And Make Hole Of Size 150 Mm. Placing Of Earthing Electrode (To Be Supplied By Contractor As Per Drawing No. A ) As Drawing B, Connecting The Same With G.I Strip ( To Be Supplied By Contractor ) Of Size 35X6 Mm As Per Drawing Cfor A Minimum Length 6 M. Treatment Of Soil With Highly Condctive Substance As Per Is 30343 Complete In All Respect, Result Of Earthing Resistance After Earthing Should Be Less Than 1 Ohm. 99 Guarding Of Lt/11Kv Line Over ( Telephone / Road /L.T. Line Crossing As Per Drawing With 6/8 Swg G.I. Including Fixing Of Guarding Channel / Angle As Per Ressp Manual L.T /11 Kv. 100 Laying And Erection Of L.T. Pvc Cable Including Crimping Of Lugs Of Size 1X70,120,150 Sq. Mm. (Including All Cost Of Material) 101 Laying And Erection Of L.T. Pvc Single Lead Cable Including Crimping Of Lugs Of Size 1X240,400,680 Sq. Mm. Etc (Including All Cost Of Material) 102 Mounting & Fixing Of Tpmo On Double Pole Structures Including Making Of Connections Complete Work. 103 Mounting & Fixing Of Fuse Sets On Double Pole Structures Including Making Of Connections Complete Work 104 Mounting And Fixing Of Lighting Arrestor Set (3 Nos.) On Double Pole Structure Including Making All Connections By G.I. Strip Size 35X6 Mm To Earth Point Complete Work (Excluding Cost Of G.I. Strip) 105 Painting Of St Pole Sp-23/21 Poles With Angle Channel And All Steel Part By One Coat Of Rod Oxide Primer And Two Coats Of Aluminium Paint And Two Strip Of Fluorescent Altemate Red And Whiter Paint 30 Cm Wide Up To 1.5 Mtrs. From Ground Level. 106 Painting Of St Pole Sp-10 Poles With Angle Channel And All Steel Part By One Coat Of Rod Oxide Primer And Two Coats Of Aluminium Paint And Two Strip Of Fluorescent Altemate Red And Whiter Paint 30 Cm Wide Up To 1.5 Mtrs. From Ground Level. 107 Jointing And Fixing Of 11Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor/ Outdoor Cable Bosex. 108 Dismantling Of 100Kva Transformers From Double Pole /Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 109 Dismantling Of 63Kva Transformers From Double Pole /Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 110 Dismantling Of 25Kva Transformers From Double Pole /Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 111 Dismantling Of 16Kva Transformers From Double Pole /Plinth Including Opening Of All Connetions , Circuts & Earthing Strip Etc. 112 Installation / Mounting Of New 100Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 113 Installation / Mounting Of New 63Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 114 Installation / Mounting Of New 25Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 115 Installation / Mounting Of New 16Kva Transformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Complete Commissioning. 116 Route Cleareance By Cutting Of Tree Branches / Proning, Loping And Chopping Of Trees For L.T, 11& 33 Kv Line. 117 T - Off Connection Complete 11 Kv Line. 118 Providing And Fixing Of Danger Board And Number Plate Complete By Providing Of Mrs. Flat 50X6 Mm And Nuts & Bolts, Danger Boards Of M.S Sheet 2 Mm Thick 11\X7\ Size (Including Cost Of All Material)
Basic Detail
Tender No 09/2026-27
Bidding Type Tender
Location
City Bageshwar
State Uttarakhand
Key Dates
Publish Date 22 Aug 2026
Submission Date 10 Sep 2026
Open Date 11 Sep 2026
Finance
Tender Value 15 Lakhs
Tender Fee 1180
EMD 45000
Exemption Not Available
Document List
BOQ_117054.xls
d70e0010-db08-4d47-8141-51dbd7b375fa.html
Tendernotice_1 (19).pdf
TF092627.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 17 days
Sep 11, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_117054.xls

html

d70e0010-db08-4d47-8141-51dbd7b375fa.html

pdf

Tendernotice_1 (19).pdf

pdf

TF092627.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders