Tender For Construction Of Boundary Wall At Upgraded Middle School Marangloiya At Vill-Marangloiya , G.P-Marangloiya, Block-Balumath,District-Latehar
Tender Value
27.91 Lakhs
Estimated cost
Bid Submission
10 Sep 2026
11 days left
EMD
56000
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Latehar → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Boundary Wall At Upgraded Middle School Marangloiya At Vill-Marangloiya , G.P-Marangloiya, Block-Balumath,District-Latehar
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation in foundation trenches in hard soil (vide classification of soil item-A+B) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. |
| 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royaly and taxes all complete as per building specification and direction of E/l. |
| 3 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)B.C.D. S.O.R. Item No. 5.3.9.1 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).B.C.D. S.O.R. Item No. 5.3.11 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) |
| 10 | Centering and shuttering including strutting, propping etc.and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 11 | Providiag designation 75B brick work in Cement Mortar (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per building specificition and direction of E/l. |
| 12 | Providing 12 mm thick cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding, taxes and royalty all complete as per specification and direcition of E/l. |
| 13 | Providing TMT steel reinforcement as per approved design and drawing excluding carriage of M.S bar to work site, cutting, bending end binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I. |
| 14 | Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper, soaping, curing and taxes all complete as per building specification and direcition of E/l. |
| 15 | Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper, soaping, curing and taxes all complete as per building specification and direcition of E/l. |
| 16 | Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper, soaping, curing and taxes all complete as per building specification and direcition of E/l. |
| 17 | Carriage of materials including loading, unloading, stacking -do- -do- all complete as per specification and direction of E/I. (i) Cement |
| 18 | (ii) Sand |
| 19 | (iii) Stone Chips |
| 20 | (iv) Steel |
| 21 | (v) Bricks |
| 22 | Supplying, fitting and fixing M.S. grill gate with M.S. grills made of 20 x 6 mm M.S flats or 16mm M.S square bars fitted on 25 x 5 x 6mm M.S angle frame of size 60 x 60 x 6mm including cost of fabrication providing necessary locking arrangement with haskal end dommy duly fixed in P.C.C. (1:2:4) block of required size, applying a priming red lead paint over steel work including cost of fabrication, carriage to site taxes all complete as per drawing specification and direction of E/I. |
| 23 | Providing two coat of painting with ready mixed paint over primer coat of red lead paint of approved make over new steel surface including preparing the surface after cleaning, removing rust, dirt, scales, grease and cleaning the surface thoroughly including cost of scaffolding and taxes all complete as per building specification and direction of E/I. |
| 24 | Add 18% GST |
| 25 | Add 1% Labour Cess Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 24, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 10, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysSep 12, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender