Agriculture Cooperative Closing in 9 days TDR #57148694

Bids Are invited for Centrifugalhouse Fabrication Work 1 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (12Inch). , Centrifugalhouse Fabrication Work 2 - Ce

Issued by Cooperative · Bijnor, Uttar Pradesh
Tender Value
2.30 Lakhs
Estimated cost
Bid Submission
01 Sep 2026
9 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bijnor → Uttar Pradesh
EMD Exemption
Not Available
Quantity
154

Project Description

Bids Are invited for Centrifugalhouse Fabrication Work 1 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (12Inch). , Centrifugalhouse Fabrication Work 2 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (6Inch). , Centrifugalhouse Fabrication Work 3 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (4Inch). , Centrifugalhouse Fabrication Work 4 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (3Inch). , Centrifugalhouse Fabrication Work 5 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (2Inch). , Centrifugalhouse Fabrication Work 6 - Fabricate And Install Bends At Various Locations In The Centrifugal House (12Inch). , Centrifugalhouse Fabrication Work 7 - Fabricate And Install Bends At Various Locations In The Centrifugal House (8Inch). , Centrifugalhouse Fabrication Work 8 - Fabricate And Install Bends At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 9 - Fabricate And Install Bends At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 10 - Fabricate And Install Bends At Various Locations In The Centrifugal House (3Inch). , Centrifugalhouse Fabrication Work 11 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (12Inch). , Centrifugalhouse Fabrication Work 12 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 13 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 14 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 15 - Fabricate And Install Nipples At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 16 - Fabricate And Install Nipples At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 17 - Open And Reassemble Valves At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 18 - Open And Reassemble Valves At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 19 - Open And Reassemble Valves At Various Locations In The Centrifugal House (3Inch). , Centrifugalhouse Fabrication Work 20 - Open And Reassemble Valves At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 21 - Centrifugal No. 1 & 2 And Kcp Machine No. 1 & 2, Cut And Remove The Damaged Monitor Casing And Ribs, Repair Them Using 10/12 Mm Ms Plate, And Carry Out A Satisfactory Trial. , Centrifugalhouse Fabrication Work 22 - In Kcp Machine No. 1 & 2, Cut And Remove The Damaged Center Shaft And Arm Inside The Pug Mill, Fabricate A New One From 8 To10 Mm Plate, Install It, And Conduct A Satisfactory Trial. , Centrifugalhouse Fabrication Work 23 - Dismantle The Damaged Portion Of The Upper Cover Of Continuous Machines No. 6 And 7 And Put It In The Scrap Yard, Then Fabricate And Install A New Cover Using 10/12 Mm Plate, Making Holes As Per The S Le, And Fit The Feed/Flow Pipe , Centrifugalhouse Fabrication Work 24 - Dismantle The Damaged Plate Of The Sugar Discharge Chute From The Sugar Elevator To The Sugar Grader, Fabricate And Install A New One From 6 Mm Thick Plate, And Dispose Of The Scrap In The Scrap Yard. , Centrifugalhouse Fabrication Work 25 - Remove The Old Tray Of Sugar Hopper No. 1, Dispose Of It In The Scrap Yard, Fabricate And Install A New One From 3/5 Mm Ms Plate, And Carry Out A Satisfactory Trial. , Centrifugalhouse Fabrication Work 26 - Remove The Transient Heater Installed Above The C Centi Machine, Open Its Side Plates, Clean It, Carry Out Hydraulic Testing, Reinstall It In Its Original Position, And Complete All Connections. , Centrifugalhouse Fabrication Work 27 - Centrifugal Machine No. 4, Cut And Remove The Damaged/Weak Top And Bottom Sugar Discharge Chute Along With The Flange, And Dispose Of It In The Scrap Yard. Fabricate A New Chute As Per The S Le Using A 6 Mm Ms Plate, Prepare All Required Connections Such As Angles, Channels, Etc., Install It On The Side, And Conduct A Satisfactory Trial.

BOQ

Sl. No. Item TitleItem Description
1centrifugalhouse fabrication work 1Centrifugal & drier house dismantle the damaged pipeline at various locations, dispose of it in the scrap yard, and install a new pipeline (12inch).
2centrifugalhouse fabrication work 2Centrifugal & drier house dismantle the damaged pipeline at various locations, dispose of it in the scrap yard, and install a new pipeline (6inch).
3centrifugalhouse fabrication work 3Centrifugal & drier house dismantle the damaged pipeline at various locations, dispose of it in the scrap yard, and install a new pipeline (4inch).
4centrifugalhouse fabrication work 4Centrifugal & drier house dismantle the damaged pipeline at various locations, dispose of it in the scrap yard, and install a new pipeline (3inch).
5centrifugalhouse fabrication work 5Centrifugal & drier house dismantle the damaged pipeline at various locations, dispose of it in the scrap yard, and install a new pipeline (2inch).
6centrifugalhouse fabrication work 6Fabricate and install bends at various locations in the centrifugal house (12inch).
7centrifugalhouse fabrication work 7Fabricate and install bends at various locations in the centrifugal house (8inch).
8centrifugalhouse fabrication work 8Fabricate and install bends at various locations in the centrifugal house (6inch).
9centrifugalhouse fabrication work 9Fabricate and install bends at various locations in the centrifugal house (4inch).
10centrifugalhouse fabrication work 10Fabricate and install bends at various locations in the centrifugal house (3inch).
11centrifugalhouse fabrication work 11Fabricate and install flanges at various locations in the centrifugal house (12inch).
12centrifugalhouse fabrication work 12Fabricate and install flanges at various locations in the centrifugal house (6inch).
13centrifugalhouse fabrication work 13Fabricate and install flanges at various locations in the centrifugal house (4inch).
14centrifugalhouse fabrication work 14Fabricate and install flanges at various locations in the centrifugal house (2inch).
15centrifugalhouse fabrication work 15Fabricate and install nipples at various locations in the centrifugal house (4inch).
16centrifugalhouse fabrication work 16Fabricate and install nipples at various locations in the centrifugal house (2inch).
17centrifugalhouse fabrication work 17Open and reassemble valves at various locations in the centrifugal house (6inch).
18centrifugalhouse fabrication work 18Open and reassemble valves at various locations in the centrifugal house (4inch).
19centrifugalhouse fabrication work 19Open and reassemble valves at various locations in the centrifugal house (3inch).
20centrifugalhouse fabrication work 20Open and reassemble valves at various locations in the centrifugal house (2inch).
21centrifugalhouse fabrication work 21Centrifugal No. 1 & 2 and KCP Machine No. 1 & 2, cut and remove the damaged monitor casing and ribs, repair them using 10/12 mm MS plate, and carry out a satisfactory trial.
22centrifugalhouse fabrication work 22In KCP Machine No. 1 & 2, cut and remove the damaged center shaft and arm inside the pug mill, fabricate a new one from 8 to10 mm plate, install it, and conduct a satisfactory trial.
23centrifugalhouse fabrication work 23Dismantle the damaged portion of the upper cover of continuous machines No. 6 and 7 and put it in the scrap yard, then fabricate and install a new cover using 10/12 mm plate, making holes as per the sample, and fit the feed/flow pipe
24centrifugalhouse fabrication work 24Dismantle the damaged plate of the sugar discharge chute from the sugar elevator to the sugar grader, fabricate and install a new one from 6 mm thick plate, and dispose of the scrap in the scrap yard.
25centrifugalhouse fabrication work 25Remove the old tray of Sugar Hopper No. 1, dispose of it in the scrap yard, fabricate and install a new one from 3/5 mm MS plate, and carry out a satisfactory trial.
26centrifugalhouse fabrication work 26Remove the transient heater installed above the C Centi machine, open its side plates, clean it, carry out hydraulic testing, reinstall it in its original position, and complete all connections.
27centrifugalhouse fabrication work 27Centrifugal machine No. 4, cut and remove the damaged/weak top and bottom sugar discharge chute along with the flange, and dispose of it in the scrap yard. Fabricate a new chute as per the sample using a 6 mm MS plate, prepare all required connections such as angles, channels, etc., install it on the side, and conduct a satisfactory trial.

AI Tender Summary

OUR REF NO 57148694
AUTHORITY Cooperative
TENDER VALUE 2.30 Lakhs
LAST DATE 01-09-2026
Authority
Authority Name Uttar Pradesh Cooperative Sugar Factories Federation Limited
Work Description Bids Are invited for Centrifugalhouse Fabrication Work 1 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (12Inch). , Centrifugalhouse Fabrication Work 2 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (6Inch). , Centrifugalhouse Fabrication Work 3 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (4Inch). , Centrifugalhouse Fabrication Work 4 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (3Inch). , Centrifugalhouse Fabrication Work 5 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (2Inch). , Centrifugalhouse Fabrication Work 6 - Fabricate And Install Bends At Various Locations In The Centrifugal House (12Inch). , Centrifugalhouse Fabrication Work 7 - Fabricate And Install Bends At Various Locations In The Centrifugal House (8Inch). , Centrifugalhouse Fabrication Work 8 - Fabricate And Install Bends At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 9 - Fabricate And Install Bends At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 10 - Fabricate And Install Bends At Various Locations In The Centrifugal House (3Inch). , Centrifugalhouse Fabrication Work 11 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (12Inch). , Centrifugalhouse Fabrication Work 12 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 13 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 14 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 15 - Fabricate And Install Nipples At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 16 - Fabricate And Install Nipples At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 17 - Open And Reassemble Valves At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 18 - Open And Reassemble Valves At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 19 - Open And Reassemble Valves At Various Locations In The Centrifugal House (3Inch). , Centrifugalhouse Fabrication Work 20 - Open And Reassemble Valves At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 21 - Centrifugal No. 1 & 2 And Kcp Machine No. 1 & 2, Cut And Remove The Damaged Monitor Casing And Ribs, Repair Them Using 10/12 Mm Ms Plate, And Carry Out A Satisfactory Trial. , Centrifugalhouse Fabrication Work 22 - In Kcp Machine No. 1 & 2, Cut And Remove The Damaged Center Shaft And Arm Inside The Pug Mill, Fabricate A New One From 8 To10 Mm Plate, Install It, And Conduct A Satisfactory Trial. , Centrifugalhouse Fabrication Work 23 - Dismantle The Damaged Portion Of The Upper Cover Of Continuous Machines No. 6 And 7 And Put It In The Scrap Yard, Then Fabricate And Install A New Cover Using 10/12 Mm Plate, Making Holes As Per The S Le, And Fit The Feed/Flow Pipe , Centrifugalhouse Fabrication Work 24 - Dismantle The Damaged Plate Of The Sugar Discharge Chute From The Sugar Elevator To The Sugar Grader, Fabricate And Install A New One From 6 Mm Thick Plate, And Dispose Of The Scrap In The Scrap Yard. , Centrifugalhouse Fabrication Work 25 - Remove The Old Tray Of Sugar Hopper No. 1, Dispose Of It In The Scrap Yard, Fabricate And Install A New One From 3/5 Mm Ms Plate, And Carry Out A Satisfactory Trial. , Centrifugalhouse Fabrication Work 26 - Remove The Transient Heater Installed Above The C Centi Machine, Open Its Side Plates, Clean It, Carry Out Hydraulic Testing, Reinstall It In Its Original Position, And Complete All Connections. , Centrifugalhouse Fabrication Work 27 - Centrifugal Machine No. 4, Cut And Remove The Damaged/Weak Top And Bottom Sugar Discharge Chute Along With The Flange, And Dispose Of It In The Scrap Yard. Fabricate A New Chute As Per The S Le Using A 6 Mm Ms Plate, Prepare All Required Connections Such As Angles, Channels, Etc., Install It On The Side, And Conduct A Satisfactory Trial.
Basic Detail
Tender No GEM/2026/B/7950584
Bidding Type Tender
Location
City Bijnor
State Uttar Pradesh
Key Dates
Publish Date 22 Aug 2026
Submission Date 01 Sep 2026
Open Date 01 Sep 2026
Finance
Tender Value 2.30 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
2831366c-99c2-41a6-bf0f-93df6399e534.pdf
950_2026-08-22-12-18-30_6dd7c4c80117708a866a3cc2eb4eab3d.pdf
9793754_Boq_1.xlsx

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 01, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Sep 01, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
pdf

2831366c-99c2-41a6-bf0f-93df6399e534.pdf

pdf

950_2026-08-22-12-18-30_6dd7c4c80117708a866a3cc2eb4eab3d.pdf

xlsx

9793754_Boq_1.xlsx

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders