Bids Are invited for Centrifugalhouse Fabrication Work 1 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (12Inch). , Centrifugalhouse Fabrication Work 2 - Ce
Tender Overview
Project Description
Bids Are invited for Centrifugalhouse Fabrication Work 1 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (12Inch). , Centrifugalhouse Fabrication Work 2 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (6Inch). , Centrifugalhouse Fabrication Work 3 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (4Inch). , Centrifugalhouse Fabrication Work 4 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (3Inch). , Centrifugalhouse Fabrication Work 5 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (2Inch). , Centrifugalhouse Fabrication Work 6 - Fabricate And Install Bends At Various Locations In The Centrifugal House (12Inch). , Centrifugalhouse Fabrication Work 7 - Fabricate And Install Bends At Various Locations In The Centrifugal House (8Inch). , Centrifugalhouse Fabrication Work 8 - Fabricate And Install Bends At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 9 - Fabricate And Install Bends At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 10 - Fabricate And Install Bends At Various Locations In The Centrifugal House (3Inch). , Centrifugalhouse Fabrication Work 11 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (12Inch). , Centrifugalhouse Fabrication Work 12 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 13 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 14 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 15 - Fabricate And Install Nipples At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 16 - Fabricate And Install Nipples At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 17 - Open And Reassemble Valves At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 18 - Open And Reassemble Valves At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 19 - Open And Reassemble Valves At Various Locations In The Centrifugal House (3Inch). , Centrifugalhouse Fabrication Work 20 - Open And Reassemble Valves At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 21 - Centrifugal No. 1 & 2 And Kcp Machine No. 1 & 2, Cut And Remove The Damaged Monitor Casing And Ribs, Repair Them Using 10/12 Mm Ms Plate, And Carry Out A Satisfactory Trial. , Centrifugalhouse Fabrication Work 22 - In Kcp Machine No. 1 & 2, Cut And Remove The Damaged Center Shaft And Arm Inside The Pug Mill, Fabricate A New One From 8 To10 Mm Plate, Install It, And Conduct A Satisfactory Trial. , Centrifugalhouse Fabrication Work 23 - Dismantle The Damaged Portion Of The Upper Cover Of Continuous Machines No. 6 And 7 And Put It In The Scrap Yard, Then Fabricate And Install A New Cover Using 10/12 Mm Plate, Making Holes As Per The S Le, And Fit The Feed/Flow Pipe , Centrifugalhouse Fabrication Work 24 - Dismantle The Damaged Plate Of The Sugar Discharge Chute From The Sugar Elevator To The Sugar Grader, Fabricate And Install A New One From 6 Mm Thick Plate, And Dispose Of The Scrap In The Scrap Yard. , Centrifugalhouse Fabrication Work 25 - Remove The Old Tray Of Sugar Hopper No. 1, Dispose Of It In The Scrap Yard, Fabricate And Install A New One From 3/5 Mm Ms Plate, And Carry Out A Satisfactory Trial. , Centrifugalhouse Fabrication Work 26 - Remove The Transient Heater Installed Above The C Centi Machine, Open Its Side Plates, Clean It, Carry Out Hydraulic Testing, Reinstall It In Its Original Position, And Complete All Connections. , Centrifugalhouse Fabrication Work 27 - Centrifugal Machine No. 4, Cut And Remove The Damaged/Weak Top And Bottom Sugar Discharge Chute Along With The Flange, And Dispose Of It In The Scrap Yard. Fabricate A New Chute As Per The S Le Using A 6 Mm Ms Plate, Prepare All Required Connections Such As Angles, Channels, Etc., Install It On The Side, And Conduct A Satisfactory Trial.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | centrifugalhouse fabrication work 1 | Centrifugal & drier house dismantle the damaged pipeline at various locations, dispose of it in the scrap yard, and install a new pipeline (12inch). |
| 2 | centrifugalhouse fabrication work 2 | Centrifugal & drier house dismantle the damaged pipeline at various locations, dispose of it in the scrap yard, and install a new pipeline (6inch). |
| 3 | centrifugalhouse fabrication work 3 | Centrifugal & drier house dismantle the damaged pipeline at various locations, dispose of it in the scrap yard, and install a new pipeline (4inch). |
| 4 | centrifugalhouse fabrication work 4 | Centrifugal & drier house dismantle the damaged pipeline at various locations, dispose of it in the scrap yard, and install a new pipeline (3inch). |
| 5 | centrifugalhouse fabrication work 5 | Centrifugal & drier house dismantle the damaged pipeline at various locations, dispose of it in the scrap yard, and install a new pipeline (2inch). |
| 6 | centrifugalhouse fabrication work 6 | Fabricate and install bends at various locations in the centrifugal house (12inch). |
| 7 | centrifugalhouse fabrication work 7 | Fabricate and install bends at various locations in the centrifugal house (8inch). |
| 8 | centrifugalhouse fabrication work 8 | Fabricate and install bends at various locations in the centrifugal house (6inch). |
| 9 | centrifugalhouse fabrication work 9 | Fabricate and install bends at various locations in the centrifugal house (4inch). |
| 10 | centrifugalhouse fabrication work 10 | Fabricate and install bends at various locations in the centrifugal house (3inch). |
| 11 | centrifugalhouse fabrication work 11 | Fabricate and install flanges at various locations in the centrifugal house (12inch). |
| 12 | centrifugalhouse fabrication work 12 | Fabricate and install flanges at various locations in the centrifugal house (6inch). |
| 13 | centrifugalhouse fabrication work 13 | Fabricate and install flanges at various locations in the centrifugal house (4inch). |
| 14 | centrifugalhouse fabrication work 14 | Fabricate and install flanges at various locations in the centrifugal house (2inch). |
| 15 | centrifugalhouse fabrication work 15 | Fabricate and install nipples at various locations in the centrifugal house (4inch). |
| 16 | centrifugalhouse fabrication work 16 | Fabricate and install nipples at various locations in the centrifugal house (2inch). |
| 17 | centrifugalhouse fabrication work 17 | Open and reassemble valves at various locations in the centrifugal house (6inch). |
| 18 | centrifugalhouse fabrication work 18 | Open and reassemble valves at various locations in the centrifugal house (4inch). |
| 19 | centrifugalhouse fabrication work 19 | Open and reassemble valves at various locations in the centrifugal house (3inch). |
| 20 | centrifugalhouse fabrication work 20 | Open and reassemble valves at various locations in the centrifugal house (2inch). |
| 21 | centrifugalhouse fabrication work 21 | Centrifugal No. 1 & 2 and KCP Machine No. 1 & 2, cut and remove the damaged monitor casing and ribs, repair them using 10/12 mm MS plate, and carry out a satisfactory trial. |
| 22 | centrifugalhouse fabrication work 22 | In KCP Machine No. 1 & 2, cut and remove the damaged center shaft and arm inside the pug mill, fabricate a new one from 8 to10 mm plate, install it, and conduct a satisfactory trial. |
| 23 | centrifugalhouse fabrication work 23 | Dismantle the damaged portion of the upper cover of continuous machines No. 6 and 7 and put it in the scrap yard, then fabricate and install a new cover using 10/12 mm plate, making holes as per the sample, and fit the feed/flow pipe |
| 24 | centrifugalhouse fabrication work 24 | Dismantle the damaged plate of the sugar discharge chute from the sugar elevator to the sugar grader, fabricate and install a new one from 6 mm thick plate, and dispose of the scrap in the scrap yard. |
| 25 | centrifugalhouse fabrication work 25 | Remove the old tray of Sugar Hopper No. 1, dispose of it in the scrap yard, fabricate and install a new one from 3/5 mm MS plate, and carry out a satisfactory trial. |
| 26 | centrifugalhouse fabrication work 26 | Remove the transient heater installed above the C Centi machine, open its side plates, clean it, carry out hydraulic testing, reinstall it in its original position, and complete all connections. |
| 27 | centrifugalhouse fabrication work 27 | Centrifugal machine No. 4, cut and remove the damaged/weak top and bottom sugar discharge chute along with the flange, and dispose of it in the scrap yard. Fabricate a new chute as per the sample using a 6 mm MS plate, prepare all required connections such as angles, channels, etc., install it on the side, and conduct a satisfactory trial. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender