Tender For Operation And Minor Maintenance Of Slurry Water Pumping Station Of Garden Reach Water Works For Three Years..
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 Sep 2026
22 days left
EMD
50000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Operation And Minor Maintenance Of Slurry Water Pumping Station Of Garden Reach Water Works For Three Years..
BOQ
| Sl. No. | Item Description |
| 1 | Operation and minor maintenance of Slurry Water Pumping Station of Garden Reach Water Works for providing adequate number of working personnel per shift round the clock (like daily operation of L.T. pump-motor sets during all the pre-scheduled time spans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of first 12 months. |
| 2 | Labour component:(85.77% of Total cost) This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the first increment will be in effect. |
| 3 | Non-labour component: (14.23% of Total cost) This monthly rate/cost will remain unaltered from the date of commencement of the O&M-work till end of the first twelve months. This also indicates the base-cost upon which monthly cost of second year of O&M-work will be determined. |
| 4 | Operation and minor maintenance of Slurry Water Pumping Station of Garden Reach Water Works for providing adequate number of working personnel per shift round the clock (like daily operation of L.T. pump-motor sets during all the pre-scheduled time spans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of first 12 months: For the period of Second 12 months. |
| 5 | Labour component: This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequient increment will be in effect. |
| 6 | Non-labour component: This monthly cost is increased at the rate of Three percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. |
| 7 | Operation and minor maintenance of Slurry Water Pumping Station of Garden Reach Water Works for providing adequate number of working personnel per shift round the clock (like daily operation of L.T. pump-motor sets during all the pre-scheduled time spans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of first 12 months: For the period of Third 12 months. |
| 8 | Labour component: This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequient (if any) increment will be in effect. |
| 9 | Non-labour component: This monthly cost is increased at the rate of Three percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 22, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 14, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 22 daysSep 16, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 24 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender