Tender For Tender**: Restoration Of 132 Gis Bageshwar Sub-Station And Its Associated Line Under Cerc, U-Prepare
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Sep 2026
13 days left
EMD
75 Lakhs
Bank guarantee accepted
Document Fee
29500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Bageshwar → Uttarakhand
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Tender**: Restoration Of 132 Gis Bageshwar Sub-Station And Its Associated Line Under Cerc, U-Prepare
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 11-Sep-2026 | Corrigendum 1 | Other | 26-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Please Enable Macros to View BoQ information Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superitending Engineer (C AND P-II) Name of Work/Tender**: \\"Restoration of 132 GIS Bageshwar Sub-station and its associated line under CERC, U-PREPARE\\" Contract No: 01/CERC/WB/BAGESHAR/UPREPARE/PTCUL/2026 |
| 2 | Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NOTE:- The bidder has to fill the rates/details in green cells only NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SI. No. Description of Material Item Code / Make Qty. Unit Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P (without GST) Unit Freight Packing Forwarding Unloading & Stacking Insurance for transit cum 30 days storage RS P (Without GST) VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without GST inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 3 | Supply for (Restoration 132/33 kV GIS Substation Bageshwar) |
| 4 | 145kV GIS Equipments |
| 5 | 145 kV, SF6 gas insulated Feeder Bay Module each comprising of SF6 gas insulated Circuit Breaker, Current Transformer, two bus-bar disconnectors one with grounding switch and one without grounding switch, line disconnector with safety grounding switch, high speed fault acting earth switch, SF6 gas monitoring system for complete bay, LCC, SF6 to cable interface and accessories with GIS etc. to complete feeder bay module. |
| 6 | 145kV AIS Equipments |
| 7 | 145 kV Capacitive Voltage Transforner 1-ph. Without junction box |
| 8 | Junction Box for above 145 kV CVT |
| 9 | 120 kV Lightning Arrester with counter and leakage meter |
| 10 | 145 kV BPI |
| 11 | Miscellaneous Materials (Insulators Strings / Disc Insulators, Hardware fittings, Conductor, 4\\" IPS Aluminium Tube, Cable Trays, Bay MB, Clamps, Connector including equipments connectors and all accessories etc. |
| 12 | PLCC for 132kV Line feeder |
| 13 | Line Traps 0.5/1 mH, 40 kA |
| 14 | Coupling device ( Phase to Earth) |
| 15 | HF Cable |
| 16 | 1.1 kV Aromoured Control Cables (Copper) alongwith multidiameter moulded cable sealing, Lugs, Glands and straight joints, etc. |
| 17 | Control cables Copper (PVC) |
| 18 | 6 Cx2.5 Sq.mm |
| 19 | 132 kV Power Cable and accessories |
| 20 | 132 kV, 1Cx630 Sq.mm XLPE, Copper Power Cable for connecting 132 kV GIS Feeder Bay Module to Outdoor Termination. |
| 21 | Terminantion Kit for 132 kV XLPE Power cable |
| 22 | 132 kV Indoor termination suitable for 1CX630 Sqmm XLPE Power cable |
| 23 | 132 kV Outdoor termination suitable for 1CX630 Sqmm XLPE Power cable |
| 24 | 132 kV indoor termination suitable for 240 sqmm XLPE Copper Power cable |
| 25 | Steel structure |
| 26 | Lattice structure with bolts and nuts |
| 27 | Earthing System |
| 28 | 40 mm MS Rod |
| 29 | 40 mm MS 3 meter electrode |
| 30 | GS Flat 75x12 mm |
| 31 | Mandatory Spares as per the section \\"Mandatory Spares for Substation Equipments\\" |
| 32 | 145 kV CB GIS Type |
| 33 | 145 kV VT GIS Type |
| 34 | 145 kV CT GIS Type |
| 35 | 120 kV Surge Arrestor GIS Type (3 Nos) |
| 36 | 145 kV CVT Outdoor Type (3 Nos) |
| 37 | 120 kV LA Outdoor Type (3 Nos) |
| 38 | 1C x 630 Sq mm XLPE Copper Power cable |
| 39 | 132 kV Indoor termination suitable for 1CX630 Sqmm XLPE Power cable |
| 40 | 132 kV Outdoor termination suitable for 1CX630 Sqmm XLPE Power cable |
| 41 | 132 kV indoor termination suitable for 240 sqmm XLPE Copper Power cable |
| 42 | Supply for (Restoration of 132 kV Ranikhet-Bageshwar line) For overhead line |
| 43 | Design |
| 44 | Designing of 132 kV D/C Cable Termination type tower along with Body extensions (i.e. +3M, +6M & +9M ), normal stub & raised chimney stubs with Cleat, Bolts, Nuts & Washers, etc. as finalized by PTCUL. |
| 45 | Designing of Normal and Raised chimney RCC type foundations (DFR, Dry, Wet, Hard Rock soil) useable for 132 kV D/C Cable Termination type tower along with their extensions. |
| 46 | Fabrication, Galvanizing & Supply of Normal Stub/Raised Chimney Stub for various type of towers with cleat including Nuts & Bolt. |
| 47 | For DC type (30o- 60o)/DCR (30°- 43°) type tower |
| 48 | For 1CTTH (0o- 6o) type tower |
| 49 | Fabrication, Galvanizing and supply of various 132 kV D/C type of complete lattice towers with bolts & nuts, step bolts, pack washers, spring washers, D-shackles including Body extensions and Leg extensions. |
| 50 | Galvanized DC/DCR type D/C tower with Bolts, Nuts, flat washers, pack washers including 3 mtr. 6mtr. & 9mtr Body Extension and Leg Extensions (0 m, 1.5m, 3.0 mtr). |
| 51 | For 1CTTH (0o- 6o) type tower |
| 52 | ACSR Panther Conductor |
| 53 | GS Earth wire 7/10 SWG |
| 54 | Single Tension fitting for ACSR Panther Conductor suitbale for 120 KN Disc Insulator |
| 55 | Tension fitting for GS Earth wire 7/10 SWG |
| 56 | Accessories for conductor & earth wire |
| 57 | Vibration damper for Panther Conductor |
| 58 | Vibration damper for GS earth wire 7/10 SWG |
| 59 | Mid span compression joint for ACSR Panther Conductor |
| 60 | Mid span compression joint for GS Earth wire 7/10 SWG |
| 61 | Flexible Copper Bond |
| 62 | Repair sleeve for Panther Conductor |
| 63 | Disc Insualtor 120 KN |
| 64 | Supply of following tower accessories |
| 65 | Number plate |
| 66 | Danger Plate |
| 67 | circuit Plate (set of two) |
| 68 | Phase Plate(set of three) |
| 69 | Anti-Climbing device |
| 70 | Counterpoise Earthing set with 30 mtr. Long each with lugs (4 nos. set for each location) |
| 71 | Supply for (Restoration of 132 kV Ranikhet-Bageshwar line) For underground cable |
| 72 | Design, manufacturing & supply of 132 kV 630 sq. mm. Single Core XLPE insulated Aluminum Cable ( 6+1 Spare ). |
| 73 | Supply of 3.3 KV 240 Sqmm. Sheath bonding Cable |
| 74 | Supply of Polymer type outdoor termination kit suitable for 132 kV 630 Sq.mm Aluminum Cable. |
| 75 | Single Phase earthing link box with SVL. |
| 76 | Single Phase earthing link box without SVL. |
| 77 | Supply of polymer type Lighting Arrester suitable for 132 kV 630 Sq.mm. cable with surge counter meter. |
| 78 | Supply of route marker (@ 50 Meter interval |
| 79 | Supply of HDPE Pipes |
| 80 | 40 mm 3 meter deep Pipe Earthing for termination kit & Lighting Arrester |
| 81 | Warning tape in buried trench |
| 82 | Supply of earth continuity Conductor of 1.1 KV 1Cx240 Sq. mm.(for earthing) |
| 83 | Supply of Ms flat 75x12 mm Earthing material |
| 84 | Supply of Ms round 40 mm for earthing (having 3 mtr. length) |
| 85 | Mandatory Spare Items for Line |
| 86 | Polymer type Lighting Arrester suitable for 132 kV 630 Sq.mm. cable with surge counter meter. |
| 87 | Polymer type outdoor termination kit suitable for 132 kV 630 Sq.mm Aluminum Cable. |
| 88 | ACSR Panther Conductor |
| 89 | Supply of 3.3 KV 240 Sqmm. Sheath bonding Cable |
| 90 | Single Phase earthing link box with SVL. |
| 91 | Single Phase earthing link box without SVL. Total in Figures 0.0 23 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superitending Engineer (C AND P-II) Name of Work/Tender**: \\"Restoration of 132 GIS Bageshwar Sub-station and its associated line under CERC, U-PREPARE\\" Contract No: 01/CERC/WB/BAGESHAR/UPREPARE/PTCUL/2026 |
| 92 | Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NOTE:- The bidder has to fill the rates/details in green cells only NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SI.No. Description of Material Item Code / Make Qty. Unit Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P (without GST) Unit Freight Packing Forwarding Unloading & Stacking Insurance for transit cum 30 days storage RS P (Without GST) VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without GST InRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 93 | Erection for (Restoration 132/33 kV GIS Substation Bageshwar) |
| 94 | Dismantling of Existing GIS Modules1. 132 kV Transmission Line Feeder Bay Module - 2 Nos |
| 95 | 145kV GIS Equipments |
| 96 | 145kV, SF6 gas insulated Feeder Bay Module each comprising of SF6 gas insulated Circuit Breaker, Current Transformer, two bus-bar disconnectors one with grounding switch and one without grounding switch, line disconnector with safety grounding switch, high speed fault acting earth switch, SF6 gas monitoring system for complete bay, LCC, Cable termination and accessories with GIS etc. to complete feeder bay module. |
| 97 | 145kV AIS Equipments |
| 98 | 145 kV CVT Single ph. |
| 99 | Junction Box for above 145kV CVT |
| 100 | 120kV Lightning Arrester with counter and leakage meter |
| 101 | 145kV BPI |
| 102 | Miscellaneous Materials (Insulators Strings / Disc Insulators, Hardware fittings, Conductor, 4\\" IPS Aluminium Tube, Cable Trays, Bay MB, Clamps, Connector including equipments connectors and all accessories etc. |
| 103 | PLCC for 132kV Line feeder |
| 104 | Line Traps 0.5/1 mH, 40 kA |
| 105 | Coupling device ( Phase to Earth) |
| 106 | HF Cable |
| 107 | 1.1kV Aromoured Control Cables (Copper) alongwith multidiameter moulded cable sealing, Lugs, Glands and straight joints, etc. |
| 108 | Control cables Copper (PVC) |
| 109 | 6Cx2.5Sq.mm |
| 110 | Laying of XLPE Cable by Mechanical/manual method including all the works related to laying of XLPE Cable like excavation trenching, sand filling, RCC slab, warning tape,backfilling, removing of extra excavated earth etc placing of HDPE pipe in open cut trench complete in all respect including testing and commissioning of cable system |
| 111 | 132kV, 1Cx630 Sq.mm XLPE, Copper Power Cable for connecting 132kV GIS Feeder Bay Module to Outdoor Termination. |
| 112 | Terminantion Kit for 132 kV XLPE Power cable |
| 113 | 132kV Indoor termination suitable for 1CX630 Sqmm XLPE Power cable |
| 114 | 132kV Outdoor termination suitable for 1CX630 Sqmm XLPE Power cable |
| 115 | 132kV Indoor termination suitable for 240 sqmm XLPE Copper Power cable |
| 116 | Steel structure |
| 117 | Lattice structure with nuts and bolts |
| 118 | Earthing System |
| 119 | 40 mm MS Rod |
| 120 | 40 mm MS 3 meter electrode |
| 121 | GS Flat 75x12 mm |
| 122 | Operation, troubleshooting and familiarization of PTCUL staff with the installed system for a period of 6 Months |
| 123 | Earth work in Excavation by mechanical means in foundation trenches or pits of any size at yard for earthing work, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed including all leads and lifts. (in ordinary soil, earth mixed with boulders |
| 124 | Repair/ Retrofitting Work- |
| 125 | Repairing and Retrofitting of 145 kV, SF6 gas insulated Transformer Bay Module (complete section) comprising of dismantling of Bay, replacement of all affacted equipment like insulators, desicent bags, O rings, Gas denstity moniters etc at each compartment of bay. LCC Cables, Mounting Structures, Earthiing system etc with complete overhauling activity, recovery & refiiling of gas, alignment of EDS, DS and associated mechanism etc, Erection of Bay, Coupling with other Bays, Testing of Module require for successful commissioning of GIS Bay complete in all respect with 5 years warrrenty. (including cost of supply of accessories/equipmets a required.) |
| 126 | Repairing and Retrofitting of 145 kV, SF6 gas insulated Bus coupler Bay Module (complete section) comprising of dismantling of Bay, replacement of all affacted equipment like insulators, desicent bags, O rings, Gas denstity moniters etc at each compartment of bay. LCC Cables, Mounting Structures, Earthiing system etc with complete overhauling activity, recovery & refiiling of gas, alignment of EDS, DS and associated mechanism etc, Erection of Bay, Coupling with other Bays, Testing of Module require for successful commissioning of GIS Bay complete in all respect with 5 years warrrenty. (including cost of supply of accessories/equipmets a required.) |
| 127 | Repairing and Retrofitting of 145 kV, SF6 gas insulated Bus Bar Module (complete section with voltage Transformer and grounding switch) comprising of dismantling of Bay, replacement of all affacted equipment like insulators, desicent bags, O rings, Gas denstity moniters etc at each compartment of bay. LCC Cables, Mounting Structures, Earthiing system etc with complete overhauling activity, recovery & refiiling of gas, alignment of EDS, DS and associated mechanism etc, Erection of Bay, Coupling with other Bays, Testing of Module require for successful commissioning of GIS Bay complete in all respect with 5 years warrrenty. (including cost of supply of accessories/equipmets a required.) |
| 128 | Erection for (Restoration of 132 kv Ranikhet- Bageshwar line) for overhead line |
| 129 | Part - 1 |
| 130 | Survey |
| 131 | Detailed route Survey, Profiling, Alignment etc. including prepration of Tower schedule, optimisation of tower locations etc. Optimisation of tower locations etc. |
| 132 | Check surveyand final peg marking |
| 133 | Soil Investigation |
| 134 | Part - 2 |
| 135 | Setting of Stubs, inlcuding all foundation work but excluding the cost of concreting and excavation |
| 136 | For DC (30o- 60o)/DCR (30°- 43°) type tower |
| 137 | For 1CTTH (0o- 6o) type tower |
| 138 | Concrete for foundations including all material, shouring and shuttering if any, forming, concreting and curing of water inlcuding cost of cement for 1:1.5:3 & 1:3:6 mix, concrete (cost of supply of MS steel bar is not to be included) |
| 139 | M20 (1:1.5:3) |
| 140 | M10 (1:3:6) |
| 141 | Excavation of foundation pits including all earthwork, backfilling and levelling etc. |
| 142 | DFR/SFR |
| 143 | Benching work for making platform for Tower base |
| 144 | DFR/SFR |
| 145 | Super structure erection of various type of towers, tower part, tower extention (complete) and leg extention with bolts & nuts and including all work above ground level excluding hoisting of insulators & fitting of danger plate, number plate, phase plate, circuit plate, anti climbing devices and bird guards, but including punching of bolts. |
| 146 | DC/DCR type tower including Erection for 3 mtr. 6mtr. & 9mtr Body Extension and Leg Extensions (0m, 1.5m, 3.0 mtr). |
| 147 | 1CTTH type tower including Erection for 3 mtr. 6mtr. & 9mtr Body Extension |
| 148 | Laying, Stringing Tensioning, clamping, jointing etc. complete with ACSR Panther conductor including hoisting of insulators and fitting of vibration dampers, jumpers at tower etc. for complete route for S/C Panther conductor. |
| 149 | Laying, Stringing Tensioning, clamping, jointing, jumperting etc. complete with single earth wire 7/10 SWG including fixing of clamps and all accessories. |
| 150 | Grounding work for counter poise type earthing including excavation 0.6 mtr. deep trench and backfilling |
| 151 | Protection of tower footing |
| 152 | Random rubble masonary with hard stone in foundation plinth including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with 1:6 cement mortar (1 cement :6 coarse sand) all material, labour and T&P, excavation back filling, levelling etc. as per approved drawings. |
| 153 | Cement concretting requried for bottom pad for revetment work in 1:4:8 ratio |
| 154 | Cement concretting requried for top of revetment walls in 1:3:6 ratio |
| 155 | Tack welding on bolts and nuts on Ist section of towers |
| 156 | Fixing of the following tower accessories |
| 157 | Danger plate |
| 158 | Number plate |
| 159 | Phase Plate (set of three) |
| 160 | Circuit Plate (set of two) |
| 161 | Anti-Climbing device |
| 162 | MS Steel bars for reinforcements (including supply) |
| 163 | Erection for (Restoration of 132 kv Ranikhet- Bageshwar line) for Underground cable |
| 164 | Detailed Survey, Laying of 132 KV 630 Sq. mm. Single Core XLPE insulated Aluminum Cable ( 6+1 spare) including excavation of ground for min. 1.5 meter depth/as per the site requirement for trefoil arrangement and constraints in normal or hard soil Sand/brick installed, roads or any other site condition/underground conditions refiling, raining of earth etc. with suitable size RCC/HDPE pipes as cover on strategic locations for complete machanical protections of the Cable showing all danger sign etc. in the ground and above on the route including structure installation, earthing, bounding shielding size testing and commissioning in all respects. |
| 165 | Complete Route Survey, Check Survey including trial pits, Profiling, Alignment etc. including prepration of Tower schedule, pegmarking of locations etc. |
| 166 | Earth work excavation by mechanical means (hydraulic excavator) or manually means |
| 167 | Laying of 630 Sq.mm. 132 kV Cable including all the works related to laying of XLPE cable, sheath bonding cable and earth countinuty cable like excavation, sand filling, RCC slab, warning tape, backfilling, removing of extra excavated earth etc. complete in all respect including testing & commissioning of cable system. |
| 168 | Providing and laying of position cement concrete or specified grade including the cost of centering, shuttering, material, forming, concreting, curing of water and cost of CC for 1:3:6 (excluding the cost of Reinforcement of slab). |
| 169 | Providing and laying of position cement concrete or specified grade including the cost of centering, shuttering, material, forming, concreting, curing of water and cost of CC for 1:1.5:3 (excluding the cost of Reinforcement of slab) |
| 170 | Reinforcement of RCC work including cost of all size of bars, straightening, cutting, bending, placing in position and binding all complete upto plinth level cods twisted bars. |
| 171 | Brick work with commen brunt clay F.P.S. brick of class designation 7.5 in foundation & plinth as per requirement cement mortar 1:4 ( 1 cement : 4 Coarse sand ), work also include plaster of walls of ratio 1:6 & curing of water. |
| 172 | Installation polymer type outdoor termination kit suitable for 132 kV 630 Sq.mm Aluminum Cable (for monopole) including earthing etc. |
| 173 | 40 mm 3 meter Pipe earthing and connecting with 75x12 mm earth strip |
| 174 | Installation of Polymer Type Lightening Arrestor, Surge counter. |
| 175 | Erection of route marker @ 50 Meter interval |
| 176 | Installation of single phase link boxes |
| 177 | Laying of MS Flat 75x12 mm including cutting, bending and all welding work |
| 178 | Laying of MS round 40 mm including reiser cutting, bending and all welding work |
| 179 | Civil Works for (Construction of Gabion Wall for loose soil protection near colony at 132 KV GIS S/S Bageshwar.) |
| 180 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.- All kinds of soil |
| 181 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 182 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc+PVC coated, Mesh wire diameter 2.7/3.7mm mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied@ 3% by weight of Gabion boxes, filled with boulders with least dimension of200 mm, as per drawing, all complete as per direction of Engineer-in-charge |
| 183 | Civil Works for (Hill side slope stabilization work at 132 KV GIS S/S Bageshwar) |
| 184 | Carriage of Earth inlcuding loading, unloading and stacking (10 km).(Beyond 10 km upto 20 km rate added Rs. 18.85 per km) |
| 185 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.- All kinds of soil |
| 186 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). |
| 187 | Slope profile preparation as per drawing -Normal Soil |
| 188 | Slope profile preparation as per drawing -Hard rock |
| 189 | Application of 100mm thick shortcrete (M-25) in two layers 50mm each sandwiched with chain link fabric 50mmx50mm size including supply of all material for shortcrete (inclusive of rebound) and excluding the cost of chain link fabric ,labour ,T&P etc. for proper completion of work as per drawing ,technical specification and the direction of engineer -in-charge. |
| 190 | Supply and installation of G.I. chain link fabric fencing of required with in mesh size 50x50mm including 2mm dia binding wire or nuts,boult and washers as per required for proper completion of the work as per drawing ,technical specification and the direction of engineer -in-charge.made of G.I. wire of dia 4mm. |
| 191 | Supply and installation of self driven rock anchor made of 40 CR material with outer dia of 32mm and inner dia of 18.5mm ,yield load carrying capacity of minimum 230KN in soil/overburden/rock suitable for drilling ,placing and cemen grouting.installation with all accessories such as 51 mm dia drill bit,couplers,10mm thick base plate and nut and bolt complete in all respect. |
| 192 | cement pressure grouting through hollow soil/solid rock anchor of outer dia 75/51/38/32/25 in rock /overburden including all cost of material and equipment required to complete the grouting work at desired pressure. |
| 193 | Supply and fixing layer of Geo-jute mat with spraying of seeds of lemon grass/Dedonis/ Vetiver etc ,including all cost of material labour and T&P required to complete the work in all respect ,with following properties. a. Material 100% natural, b. Weight 500GSM, C. Minimum breaking load along machine direction (warp way) -10 kn/m , cross direction (weft way )- 10 kn/m .d. Max. Elongation at break (in %).Machine direction (warp way )-10. cross direction (weft way )-12. |
| 194 | Provoding and installing subsurface drainage pipes- perforated PVC pipe (lined with Non- Woven Geotextile) of 75mm internal diameter as per the drawing etc. complete including the cost of drilling and as directed by Engineer-in-charge. |
| 195 | Civil Works for (Construction of RCC wall & C.C. Blocks for protection of approach road at 132 KV GIS S/S Bageshwar) |
| 196 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil |
| 197 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 198 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil |
| 199 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 200 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources |
| 201 | Centering and shuttering including strutting, propping etc. and removal of form for foundation,footing ,bases of colums etc for mass concrete. |
| 202 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc. |
| 203 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold Twisted Bars |
| 204 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing andreinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate20 mm nominal size) |
| 205 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement. 1:1.5:3(1 cement : 1.5coarse sand : 3graded stone aggregate 20mm nominal size). |
| 206 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.110 mm diameter |
| 207 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets,gates and similar works |
| 208 | Hand pack stone filling in back of walls including cost of all material ,royalty T&P etc .complete as per direction of engineer in charge (As per PWD uttarakhand specification |
| 209 | Providing /laying geo synthetic clay liner(6mm to 8mm thick bentonite sandwiched between woven / non woven geotextile liner , needle punched ). in the area as directed of engineer in charge incluiding all T&P ,material labour required for proper completion of work as per dierction of engineer in charge . |
| 210 | Civil Works for (Renovation of GIS, Control Room and Store Building at 132 kV GIS Substation Bageshwar) |
| 211 | Construction of Store Shed (Plinth area to be measured) (Minimum Ceiling height-4.20 M) |
| 212 | Establishment of temporary PTCUL site cum transit office at site including all necessary arrangement as directed by Engineer incharge. |
| 213 | Construction of Boundary Wall |
| 214 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.- All kinds of soil |
| 215 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size) derived from natural sources. |
| 216 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). |
| 217 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. |
| 218 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold Twisted Bars |
| 219 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 220 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 221 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 222 | Random Rubble Masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 Coars Sand : 12 Graded stone aggregate 20 mm niminal size) upto plinth level with cement mortar (1:6 ) |
| 223 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.110 mm diameter |
| 224 | 12 mm cement plaster of mix: 1:4 ( 1 cement : 4 coarse sand) |
| 225 | Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design. With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 |
| 226 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : New work (two or more coats) over and including water thinnable priming coat with cement primer |
| 227 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 228 | Hand pack stone filling in back of walls including cost of all material ,royalty T&P etc .complete as per direction of engineer in charge (As per PWD uttarakhand specification ) |
| 229 | Civil Works for (Construction of New Switch Yard & Associated Work of 132/33 KV GIS S/S -Bageshwar) |
| 230 | LA foundation |
| 231 | CVT foundation |
| 232 | Termination Kit |
| 233 | Foundations for BPI/Wave Trap |
| 234 | Foundations for CSS |
| 235 | 1050 mm size trench with minimum depth 1050 mm |
| 236 | Switch yard turfing including leveling and dressing of area, PCC and gravels |
| 237 | Security (Chain link) Fencing 3.5 m high. |
| 238 | Construction of drain (0.45 M wide) |
| 239 | RCC wall (8.00 Metre height) |
| 240 | RCC wall (5.00 Metre height) |
| 241 | Interlocking tile path (4.00 metre wide with PCC 1:4:8) |
| 242 | Construction of water supply line at 132/33 KV GIS Substation Bageshwar. |
| 243 | Horticulture work Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superitending Engineer (C AND P-II) Name of Work/Tender**: \\"Restoration of 132 GIS Bageshwar Sub-station and its associated line under CERC, U-PREPARE\\" Contract No: 01/CERC/WB/BAGESHAR/UPREPARE/PTCUL/2026 |
| 244 | Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) * Tender is of composite nature comprising of supply of goods and supply of services NOTE:- The bidder has to fill the GST AMOUNT on The green cells of AMOUNT COLOUM(4) ONLY. In case any discrepancy is observed in amount carried from BoQ1 & BoQ2 sheet as below, the value given in BoQ1 & BoQ2 sheet shall prevail. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Particulars Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Pleas Enter ZERO Only AMOUNT VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 245 | Total Price Schedule-A (Supply) from BoQ1 sheet WITHOUT GST |
| 246 | Total Price Schedule-B (Erection and Civil Works) from BoQ2 sheet WITHOUT GST |
| 247 | Add GST* Amount on (Total of Price Schedule-A + Total of Price Schedule-B above) Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only |
AI Tender Summary
Tender Timeline
Sep 11, 2026
11:30 IST
Tender Published
Tender notice published.
Completed
Sep 26, 2026
18:00 IST
Corrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 13 daysSep 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender