Tender For Loosening/Dismantling & Vulcanized Head Drum Lagging, Gear Box Maintenance Along With Guide Channel Arrangement Rectification & Supporting Platform With Safety Fence Rectification Of Unit No. 123 Belt Conveyor And Rectification Of Damaged
Tender Overview
Project Description
Tender for Loosening/Dismantling & Vulcanized Head Drum Lagging, Gear Box Maintenance Along With Guide Channel Arrangement Rectification & Supporting Platform With Safety Fence Rectification Of Unit No. 123 Belt Conveyor And Rectification Of Damaged Tail Frame (Non-Drive) Arrangement Along With Replacement Of Worn-Out Chain Link Assly. Tail & Head Sprocket Assly. Bottom & Side Liner Plate, Bottom & Top Runner With Mother Angel Of Unit No. 213 Chain Conv. Of Main Plant Of Kedla Washery. Nit No-Po/Kw/E-Tender/26-27/23 Date:-22.08.2026
BOQ
| Sl. No. | Item Description |
| 1 | A. Loosening/dismantling & vulcanized head drum lagging, gear box maintenance along with guide channel arrangement rectification & supporting platform with safety fence rectification of unit no. 123 belt conveyor. (a) Dismantling of conv. belt+gear box+head drme+takeup arrangement.=7.078+4.158+2.096+8.860=22.192MT |
| 2 | (b) Shifting of Iron & steel items at site belt and Shifting of old & scrap items to scrapyard. |
| 3 | (c) Dismantling of old 40% of new(3.556MT)=1.422MT |
| 4 | (d) Fabrication & Erection of iron & steel items. |
| 5 | (e) Installation and alignment of conv. belt+gear box,head drum, take-up arrangement after work as above said work.-7.864+4.158+2.096+8.860=22.978MT. |
| 6 | B. Rectification of damaged tail frame (non-drive) arrangement along with replacement of worn-out chain link assly. tail & head sprocket assly. bottom & side liner plate, bottom & top runner with mother angel of unit no. 213 chain conv. (a) Shifiting of new chain link assly. + head & tail spkt assly. +tail frame arrangement materials. (2.360+1.268+3.106+4.693)=11.427 MT and Shifting of old to scrapyard.(2.539+3.119)=5.658MT |
| 7 | (b) Assembling of chain link assly. And chain link lining and Installation of chain link assly.+ H&T spkt. Assly. 2.36+3.628=5.988MT |
| 8 | (c) Dismantling of chain link and H & T spkt assly. 70%bof new (3.628MT)=2.539MT |
| 9 | (d) Dismantling of liner & plate and tail frame arrangement 40% of new (7.799MT) (4.693+3.106)=7.799 |
| 10 | (d) Fabarication & erection of liners & plate and tail frame arrangement. |
| 11 | C. Plate fixing on discharge chute of 213 chain conveyor . (a) Shifting of new plate and Shifting of old to scrapyard. |
| 12 | (b) Dismantling of old 40% of new (3MT)=1.2MT |
| 13 | (c) Fabarication & erection of plate. |
| 14 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
TodayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender