Supply Of Set of FRP Ceiling for LHB SCN /GS Coaches. => Limited
Tender Overview
Project Description
Supply Of set of frp ceiling for lhb scn /gs coaches. , set of frp ceiling panels for lhb gs coaches with vacuum bagging/vartm/sm c process complying to hl-3 as per en 45545-2. mdts-43373 rev.01 along with corrigendu m-1(as per dy.cme/df l.no. md35131 dated 29.01.2026) & corrigendum-2 (as per dy.cme/df l. no. md35131 dated 10.03.2026) to be followed in place of mdts-133/mdts-084. for smc pro cess, properties of product shall as per para 6 of mdts 24401 rev-01 instead of table 4 i n para 9 of mdts-43373 rev-01. follow colour scheme as per design l.no. md46271 dated 30.01.2021., as per drawing: mplrclgs version 0 . [ warranty period: 84 months after the date of delivery ] ] , set of ceiling sheet for lhb scn coaches with vacuum bagging/vartm/smc p rocess complying to hl-3 as per en 45545-2. mdts-43373 rev.01 along with corrigendum-1 (as per dy.cme/df l.no. md35131 dated 29.01.2026) & corrigendum-2 (as per dy.cme/df l.no. md35131 dated 10.03.2026) to be followed in place of mdts-133/mdts-084. for smc proces s, properties of product shall as per para 6 of mdts 24401 rev-01 instead of table 4 in pa ra 9 of mdts-43373 rev-01. follow colour scheme as per design l.no. md46271 dated 30.0 1.2021., as per drawing: ls44220 alt c without item no. 12, 21, 22, 24, 25 & 27 . [ warranty per iod: 84 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | SET OF FRP CEILING PANELS FOR LHB GS COACHES WITH VACUUM BAGGING/VARTM/SM C PROCESS COMPLYING TO HL-3 AS PER EN 45545-2. MDTS-43373 REV.01 ALONG WITH CORRIGENDU M-1(AS PER DY.CME/DF L.NO. MD35131 DATED 29.01.2026) & CORRIGENDUM-2 (AS PER DY.CME/DF L. NO. MD35131 DATED 10.03.2026) TO BE FOLLOWED IN PLACE OF MDTS-133/MDTS-084. FOR SMC PRO CESS, PROPERTIES OF PRODUCT SHALL AS PER PARA 6 OF MDTS 24401 REV-01 INSTEAD OF TABLE 4 I N PARA 9 OF MDTS-43373 REV-01. FOLLOW COLOUR SCHEME AS PER DESIGN L.NO. MD46271 DATED 30.01.2021., as per Drawing: MPLRCLGS VERSION 0 . [ Warranty Period: 84 Months after the date of delivery ] ] |
| 2 | SET OF CEILING SHEET FOR LHB SCN COACHES WITH VACUUM BAGGING/VARTM/SMC P ROCESS COMPLYING TO HL-3 AS PER EN 45545-2. MDTS-43373 REV.01 ALONG WITH CORRIGENDUM-1 (AS PER DY.CME/DF L.NO. MD35131 DATED 29.01.2026) & CORRIGENDUM-2 (AS PER DY.CME/DF L.NO. MD35131 DATED 10.03.2026) TO BE FOLLOWED IN PLACE OF MDTS-133/MDTS-084. FOR SMC PROCES S, PROPERTIES OF PRODUCT SHALL AS PER PARA 6 OF MDTS 24401 REV-01 INSTEAD OF TABLE 4 IN PA RA 9 OF MDTS-43373 REV-01. FOLLOW COLOUR SCHEME AS PER DESIGN L.NO. MD46271 DATED 30.0 1.2021., as per Drawing: LS44220 ALT c WITHOUT ITEM NO. 12, 21, 22, 24, 25 & 27 . [ Warranty Per iod: 84 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender