Power Boards / Undertakings / PSU Closing in 19 days TDR #57136785

Bids Are invited for Custom Bid For Services - Modification And Execution Of Piping Works Along With Other Miscellaneous Work Activities Such As Painting Etc At Wip Trombay - Preparation Of Cell, Operating Gallery And Different Area Walls And Floors

Issued by Boards / Undertakings / PSU · Mumbai Suburban, Maharashtra
Tender Value
14.65 Lakhs
Estimated cost
Bid Submission
11 Sep 2026
19 days left
EMD
29300
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai Suburban → Maharashtra
EMD Exemption
Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - Modification And Execution Of Piping Works Along With Other Miscellaneous Work Activities Such As Painting Etc At Wip Trombay - Preparation Of Cell, Operating Gallery And Different Area Walls And Floors At Wip, Trombay, Including Surface Descaling, Removal And Repair Of Dents & Cavities, Surface Levelling And Polishing, Followed By The Application Of One Coat Of Primer. After Primer Application, Levelling, Polishing, And Primer Thickness Measurement And Subsequently, The First And Second Coats Of Epoxy Paint As Per The Attached Technical Specification. , Fabrication Of Support Structure And Walkway Using Ss 304 Beams, Ss304 Channels, Ss304 Angles, Ss304 Plates For Piping And Equipment Installation Works. , Execution Of Radiographic-Quality Butt Welding (Gtaw) For Ss304l Pipes And Pipe Fittings Of Various Sizes Inside Hot Cells And Other Designated Areas, Using High-Purity Argon Gas (Minimum 99.995%) For Shielding And Back Purging. The Work Included Liquid Penetrant Examination (Lpe) Of The Root And Final Welds, Local Passivation Of Completed Weld Joints, Permanent Identification Marking Of Weld Joint Numbers, And All Associated Activities Such As Preparation Of As Built Final Drawings And Scope Drawings, Line Tracing And Testing Using Different Fluid Such As Air Or Water Etc. Carried Out In Accordance With The Approved Welding Procedures And Technical Specifications. , Fillet Welding (Gtaw) For All Stainless Steel Pipelines Using High Purity Argon Gas (99.995% Min) For Shielding & Back Purging Followed By Liquid Penetrant Examination For Root & Final Weld And Final Approval Of These Welds After Pressure Testing Shall Be Carried Out As Per Tender Technical Specification. , Radiography Of Butt Welding Joints On The Basis Of Relevant Standards And Approved Procedure As Per Attached Tender Technical Specifications. , Collection Of Free Issue Materials Such As Pipes, Angles And Fittings Etc., Erection, Installation, Supporting ( Utilizing Ss/ Ms Structural Members Such As Angles, Channels, Beam Etc.), Testing And Commissioning Of Ss304l Piping In Sizes From 8 Mm Nb To 200 Mm Nb [This Work Involves Identification Of Existing Pipelines, Piping Spool/ Nozzles Of Equipment Inside The Cell, Taking Site Measurements Inside And Outside The Cell, Incorporating The Required Changes In Ga Drawings, Preparation & Approval Of Pipe Spool Drawings Prior To Any Fabrication Activity, Identification Of All Materials, Taking Delivery Of The Same From Departmental Stores, Complete Handling, Transportation, Cleaning, Detergent Washing, Pickling & Passivation, Iron And Chloride Contamination Checks, Rinsing, Marking, Cutting Of Pipes And Edge Preparation, Fabrication Of Ss Pipe Bends With 5D And More Radius With Lpe, Fit-Up, Tack Welding, Full Welding With Lpe, Alignment, Maintaining Slope, Line Tagging, Weld Joint Tagging, Supporting, Local Passivation Of Weld Joint, Pneumatic Testing Of Lines, Complete Erection, Preparation Of As Built Drawings Etc. And Readying The Same For Gtaw Welding As Per Approved Spool Drawings]. Pressure Testing Of All Pipe Lines & Embedded Plugs/Pipe Eps During Commissioning Shall Also Be In The Scope Of The Supplier. Additionally, The Work Shall Also Involve Erection Of Eic Approved Safe Working Platform, Scaffolding, Handling Gadgets Such As Jib Crane, Chain Pulley Bock, Arrangement Of Working Tools And Tackels, Personal Protective Equipment & Safety Gear/Garments Such As Gloves, Safety Glasses And Shoes, Earplugs Or Muffs, Hard Hats, Respirators, Or Coveralls, Vests And Full Body Suits Etc. Shall Be In The Scope Of The Supplier. , Handling, Shifting, Transportation To Designated Place/Location, Erection And Installation Of All Process Equipments, Mounting Of Headers/Alp/Dp/Sbp And Other Assemblies Such As Off Gas Heaters, Tanks, Columns, Furnace Assemblies, Glove Boxes, Different Pots And Other Remote Handling Equipments Etc. Inside The Cell.

BOQ

Sl. No. Item TitleItem Description
1Preparation of cell, operating gallery and different area walls and floors at WIP, Trombay, including surface descaling, removal and repair of dents & cavities, surface levelling and polishing, followed by the application of one coat of primer. After primer application, levelling, polishing, and primer thickness measurement and subsequently, the first and second coats of epoxy paint as per the attached technical specification.Preparation of cell, operating gallery and different area walls and floors at WIP, Trombay, including surface descaling, removal and repair of dents & cavities, surface levelling and polishing, followed by the application of one coat of primer. After primer application, levelling, polishing, and primer thickness measurement and subsequently, the first and second coats of epoxy paint as per the attached technical specification.
2Fabrication of support structure and walkway using SS 304 beams, SS304 channels, SS304 angles, SS304 plates for piping and equipment installation works.Fabrication of support structure and walkway using SS 304 beams, SS304 channels, SS304 angles, SS304 plates for piping and equipment installation works.
3Execution of radiographic-quality butt welding (GTAW) for SS304L pipes and pipe fittings of various sizes inside hot cells and other designated areas, using high-purity argon gas (minimum 99.995%) for shielding and back purging. The work included liquid penetrant examination (LPE) of the root and final welds, local passivation of completed weld joints, permanent identification marking of weld joint numbers, and all associated activities such as preparation of as built final drawings and scope drawings, line tracing and testing using different fluid such as air or water etc. carried out in accordance with the approved welding procedures and technical specifications.Execution of radiographic-quality butt welding (GTAW) for SS304L pipes and pipe fittings of various sizes inside hot cells and other designated areas, using high-purity argon gas (minimum 99.995%) for shielding and back purging. The work included liquid penetrant examination (LPE) of the root and final welds, local passivation of completed weld joints, permanent identification marking of weld joint numbers, and all associated activities such as preparation of as built final drawings and scope drawings, line tracing and testing using different fluid such as air or water etc. carried out in accordance with the approved welding procedures and technical specifications.
4Fillet welding (GTAW) for all stainless steel pipelines using high purity Argon gas (99.995% min) for shielding & back purging followed by Liquid Penetrant Examination for root & final weld and final approval of these welds after pressure testing shall be carried out as per tender technical specification.Fillet welding (GTAW) for all stainless steel pipelines using high purity Argon gas (99.995% min) for shielding & back purging followed by Liquid Penetrant Examination for root & final weld and final approval of these welds after pressure testing shall be carried out as per tender technical specification.
5Radiography of butt welding joints on the basis of relevant standards and approved procedure as per attached tender technical specifications.Radiography of butt welding joints on the basis of relevant standards and approved procedure as per attached tender technical specifications.
6Collection of Free issue materials such as pipes, angles and fittings etc., Erection, installation, supporting ( utilizing SS/ MS structural members such as angles, channels, beam etc.), testing and commissioning of SS304L Piping in sizes from 8 mm NB to 200 mm NB [This work involves identification of existing pipelines, piping spool/ nozzles of equipment inside the cell, taking site measurements inside and outside the cell, incorporating the required changes in GA drawings, preparation & approval of pipe spool drawings prior to any fabrication activity, identification of all materials, taking delivery of the same from departmental stores, complete handling, transportation, cleaning, detergent washing, pickling & passivation, iron and chloride contamination checks, rinsing, marking, cutting of pipes and edge preparation, fabrication of SS pipe bends with 5D and more radius with LPE, fit-up, tack welding, full welding with LPE, alignment, maintaining slope, line tagging, weld joint tagging, supporting, local passivation of weld joint, pneumatic testing of lines, complete erection, preparation of as built drawings etc. and readying the same for GTAW welding as per approved spool drawings]. Pressure testing of all pipe lines & Embedded plugs/pipe EP's during commissioning shall also be in the scope of the supplier. Additionally, the work shall also involve erection of EIC approved safe working platform, scaffolding, handling gadgets such as jib crane, chain pulley bock, arrangement of working tools and tackels, personal protective equipment & safety gear/garments such as gloves, safety glasses and shoes, earplugs or muffs, hard hats, respirators, or coveralls, vests and full body suits etc. shall be in the scope of the supplier.Collection of Free issue materials such as pipes, angles and fittings etc., Erection, installation, supporting ( utilizing SS/ MS structural members such as angles, channels, beam etc.), testing and commissioning of SS304L Piping in sizes from 8 mm NB to 200 mm NB [This work involves identification of existing pipelines, piping spool/ nozzles of equipment inside the cell, taking site measurements inside and outside the cell, incorporating the required changes in GA drawings, preparation & approval of pipe spool drawings prior to any fabrication activity, identification of all materials, taking delivery of the same from departmental stores, complete handling, transportation, cleaning, detergent washing, pickling & passivation, iron and chloride contamination checks, rinsing, marking, cutting of pipes and edge preparation, fabrication of SS pipe bends with 5D and more radius with LPE, fit-up, tack welding, full welding with LPE, alignment, maintaining slope, line tagging, weld joint tagging, supporting, local passivation of weld joint, pneumatic testing of lines, complete erection, preparation of as built drawings etc. and readying the same for GTAW welding as per approved spool drawings]. Pressure testing of all pipe lines & Embedded plugs/pipe EP's during commissioning shall also be in the scope of the supplier. Additionally, the work shall also involve erection of EIC approved safe working platform, scaffolding, handling gadgets such as jib crane, chain pulley bock, arrangement of working tools and tackels, personal protective equipment & safety gear/garments such as gloves, safety glasses and shoes, earplugs or muffs, hard hats, respirators, or coveralls, vests and full body suits etc. shall be in the scope of the supplier.
7Handling, shifting, transportation to designated place/location, erection and installation of all process equipments, mounting of headers/ALP/DP/SBP and other assemblies such as off gas heaters, tanks, columns, furnace assemblies, glove boxes, different pots and other remote handling equipments etc. inside the cell.Handling, shifting, transportation to designated place/location, erection and installation of all process equipments, mounting of headers/ALP/DP/SBP and other assemblies such as off gas heaters, tanks, columns, furnace assemblies, glove boxes, different pots and other remote handling equipments etc. inside the cell.

AI Tender Summary

OUR REF NO 57136785
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 14.65 Lakhs
LAST DATE 11-09-2026
Authority
Authority Name Bhabha Atomic Research Centre
Work Description Bids Are invited for Custom Bid For Services - Modification And Execution Of Piping Works Along With Other Miscellaneous Work Activities Such As Painting Etc At Wip Trombay - Preparation Of Cell, Operating Gallery And Different Area Walls And Floors At Wip, Trombay, Including Surface Descaling, Removal And Repair Of Dents & Cavities, Surface Levelling And Polishing, Followed By The Application Of One Coat Of Primer. After Primer Application, Levelling, Polishing, And Primer Thickness Measurement And Subsequently, The First And Second Coats Of Epoxy Paint As Per The Attached Technical Specification. , Fabrication Of Support Structure And Walkway Using Ss 304 Beams, Ss304 Channels, Ss304 Angles, Ss304 Plates For Piping And Equipment Installation Works. , Execution Of Radiographic-Quality Butt Welding (Gtaw) For Ss304l Pipes And Pipe Fittings Of Various Sizes Inside Hot Cells And Other Designated Areas, Using High-Purity Argon Gas (Minimum 99.995%) For Shielding And Back Purging. The Work Included Liquid Penetrant Examination (Lpe) Of The Root And Final Welds, Local Passivation Of Completed Weld Joints, Permanent Identification Marking Of Weld Joint Numbers, And All Associated Activities Such As Preparation Of As Built Final Drawings And Scope Drawings, Line Tracing And Testing Using Different Fluid Such As Air Or Water Etc. Carried Out In Accordance With The Approved Welding Procedures And Technical Specifications. , Fillet Welding (Gtaw) For All Stainless Steel Pipelines Using High Purity Argon Gas (99.995% Min) For Shielding & Back Purging Followed By Liquid Penetrant Examination For Root & Final Weld And Final Approval Of These Welds After Pressure Testing Shall Be Carried Out As Per Tender Technical Specification. , Radiography Of Butt Welding Joints On The Basis Of Relevant Standards And Approved Procedure As Per Attached Tender Technical Specifications. , Collection Of Free Issue Materials Such As Pipes, Angles And Fittings Etc., Erection, Installation, Supporting ( Utilizing Ss/ Ms Structural Members Such As Angles, Channels, Beam Etc.), Testing And Commissioning Of Ss304l Piping In Sizes From 8 Mm Nb To 200 Mm Nb [This Work Involves Identification Of Existing Pipelines, Piping Spool/ Nozzles Of Equipment Inside The Cell, Taking Site Measurements Inside And Outside The Cell, Incorporating The Required Changes In Ga Drawings, Preparation & Approval Of Pipe Spool Drawings Prior To Any Fabrication Activity, Identification Of All Materials, Taking Delivery Of The Same From Departmental Stores, Complete Handling, Transportation, Cleaning, Detergent Washing, Pickling & Passivation, Iron And Chloride Contamination Checks, Rinsing, Marking, Cutting Of Pipes And Edge Preparation, Fabrication Of Ss Pipe Bends With 5D And More Radius With Lpe, Fit-Up, Tack Welding, Full Welding With Lpe, Alignment, Maintaining Slope, Line Tagging, Weld Joint Tagging, Supporting, Local Passivation Of Weld Joint, Pneumatic Testing Of Lines, Complete Erection, Preparation Of As Built Drawings Etc. And Readying The Same For Gtaw Welding As Per Approved Spool Drawings]. Pressure Testing Of All Pipe Lines & Embedded Plugs/Pipe Eps During Commissioning Shall Also Be In The Scope Of The Supplier. Additionally, The Work Shall Also Involve Erection Of Eic Approved Safe Working Platform, Scaffolding, Handling Gadgets Such As Jib Crane, Chain Pulley Bock, Arrangement Of Working Tools And Tackels, Personal Protective Equipment & Safety Gear/Garments Such As Gloves, Safety Glasses And Shoes, Earplugs Or Muffs, Hard Hats, Respirators, Or Coveralls, Vests And Full Body Suits Etc. Shall Be In The Scope Of The Supplier. , Handling, Shifting, Transportation To Designated Place/Location, Erection And Installation Of All Process Equipments, Mounting Of Headers/Alp/Dp/Sbp And Other Assemblies Such As Off Gas Heaters, Tanks, Columns, Furnace Assemblies, Glove Boxes, Different Pots And Other Remote Handling Equipments Etc. Inside The Cell.
Basic Detail
Tender No GEM/2026/B/7949179
Bidding Type Tender
Location
City Mumbai Suburban
State Maharashtra
Key Dates
Publish Date 21 Aug 2026
Submission Date 11 Sep 2026
Open Date 11 Sep 2026
Finance
Tender Value 14.65 Lakhs
Tender Fee Ref. Documents
EMD 29300
Exemption Available
Document List
5ca24f9c-da74-485d-8924-666594d83321.pdf
1787318202.pdf
1787318214.pdf
1787318234.pdf
1787318242.pdf
1787318251.pdf
1787318271.pdf
1787318282.pdf
1787318335.pdf
1787318346.pdf
1787318355.pdf
1787318775.xlsx

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 21, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 11, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 19 days
Sep 11, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 19 days

Tender Documents

Download All (ZIP) ↓
pdf

5ca24f9c-da74-485d-8924-666594d83321.pdf

pdf

1787318202.pdf

pdf

1787318214.pdf

pdf

1787318234.pdf

pdf

1787318242.pdf

pdf

1787318251.pdf

pdf

1787318271.pdf

pdf

1787318282.pdf

pdf

1787318335.pdf

pdf

1787318346.pdf

pdf

1787318355.pdf

xlsx

1787318775.xlsx

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders