Tender For Flow Diversion Arrangements In Aliyar River Under Cwss To Zamin Uthukuli Town Panchayat And 63 Habitations In Pollachi North And Pollachi South Unions In Coimbatore District Under State Disaster Response Fund (Sdrf) For The Year 2026-2027 (Cons
Tender Overview
Project Description
Tender For Flow Diversion Arrangements In Aliyar River Under Cwss To Zamin Uthukuli Town Panchayat And 63 Habitations In Pollachi North And Pollachi South Unions In Coimbatore District Under State Disaster Response Fund (Sdrf) For The Year 2026-2027 (Construction Period: 15 Days) (2Nd Call)
BOQ
| Sl. No. | Item Description |
| 1 | TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD. SEWERAGE DIVISION, POLLACHI Name of Work : Flow diversion arrangements in Aliyar river under CWSS to Zamin Uthukuli Town Panchayat and 63 habitations in Pollachi North and Pollachi South Unions in Coimbatore District under State Disaster Response Fund (SDRF) for the year 2026-2027 (Construction Period: 15 Days) (2nd Call) PRICE BID e- submission SCHEDULE - \\"A\\" General 1) The Bill of Quantities shall contain items for the construction, installation, testing, commissioning and maintenance of the Works to be carried out by the Contractor 2) The Bill of Quantities will be used to calculate the Contract Price. The contractor shall be paid for the quantum of work done at the percentage quoted for all the item of works in the Bill of Quantities. 3) The rates quoted in the BOQ shall be for carrying out the work in conformity to the BIS, TNBP and Technical Specifications and other Terms and Conditions set out in the Bid Document 4) All pages in the BOQ should be digitally signed without omission are also upload the designated website https://tntenders.gov.in Changes in the Probable of Probable of Quantity 5) The departmental value given in the Price Schedule in the BoQ in excel format is inclusive of GST. The GST amount is also shown separately in the Price Schedule. The bidder should quote the percentage in Price Schedule form for the total departmental value inclusive of GST. 6) If the final quantity of the work done differs from the quantity in the Bill of Quantities for the particular item/items, the rates as in the agreement for the relevant items shall be paid. Goods and Service Tax & TDS on GST 7) The bidder should quote the percentage in Price Schedule form for the total departmental value inclusive of GST @ 18% (or) as per G.O. amended from time to time. The GST amount should be arrived for the Total basic cost of all the items. 8) From every payment made to the firm/Contractor, deduction at source towards GST shall be made for civil work contract subject to issue of amendments from time to time. Name of Work: Flow diversion arrangements in Aliyar river under CWSS to Zamin Uthukuli Town Panchayat and 63 habitations in Pollachi North and Pollachi South Unions in Coimbatore District under State Disaster Response Fund (SDRF) for the year 2026-2027 (Construction Period: 15 Days) (2nd Call) Sl. No. Description of work Probable quantity TNBP & Other Specification Unit Rate in Amount in figures Rate Words 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Vide separate sheets attached. |
| 2 | Flow diversion arrangements in Aliyar river under CWSS to Zamin Uthukuli Town Panchayat and 63 habitations in Pollachi North and Pollachi South Unions in Coimbatore District under State Disaster Response Fund (SDRF) for the year 2026-2027 (Construction Period: 15 Days) (2nd Call) |
| 3 | Flow diversion arrrangements for Aliyar river at Headworks |
| 4 | Providing sand bags in the eroded berms including cost and conveyance of sand, supply of empty bags, loading and unloading, filling in bags with sand, shifting them and placing at eroded berms as directed by department officers etc., complete. (for river flow diversion) |
| 5 | Hire charges for deploying earth moving machinery (JCB/Poclain) for earthwork including diesel, oil and labour charges etc., complete. |
| 6 | Poclain |
| 7 | Sub Total |
| 8 | GST @ 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender