Bids Are invited for Facility Management Services - Lumpsum Based - As Per Atc; As Per Atc; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Cleaning Of Underground Tanks : Cleaning Of Under Ground Water Storage / High Le
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - As Per Atc; As Per Atc; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Cleaning Of Underground Tanks : Cleaning Of Under Ground Water Storage / High Level Ground Reservoir (Hlgr) Tanks / Elevated Surface Reservoir (Esr) Twice In A Year Or As Required With Pressure Water Jetting With Required Pressure Using Adjustable Pressure Jet Machines, Removing All Debris, Fungus Growth Inside The Tanks & Other Contamination Including Cleaning Of Walls & Floors Of Tanks Thoroughly, Application Of Bleaching Powder Or Other Chemicals Approved By The Department At The Required Dosage, Desilting & Final Cleaning With Fresh Water & Dewatering Residual & Dirty Water & Other Deposits Using Dewatering Pumps & Vacuum Pumps Including Disposing Off The Removed Waste Materials From The Tanks Within A Distance Of 50 Metres On Ground At Suitable Location Etc. Complete All As Per Terms And Conditions/ Scope Of Work Attached & As Directed By The Engineer-In-Charge , Capacity Of Tanks Up To 3 Lakhs Litres Note: At Least 2 Tanks Upto 3 Lakh Liters To Be Clean In A Day. , Capacity Of Tanks Above 3 Lakhs Litres To 5 Lakhs Litresnote: At Least 2 Tanks Above 3 Lakhs Litres To 5 Lakhs Litres To Be Clean In A Day. , Capacity Of Tanks Above 5 Lakhs Litres To 10 Lakhs Litresnote: At Least 1 Tank Above 5 Lakhs Litres To 10 Lakhs Litres To Be Clean In A Day. , Cleaning Of Overhead Tanks : Cleaning Of Overhead Water Storage Tanks Of Following Capacities Provided Over The Roof Of Buildings Tanks Twice In A Year Or As Required, Including Scrapping Of Walls & Floors Of Tanks With Coir Brushes, Removing Silt, Scaling, Dirt, Debris & Other Deleterious Materials From The Tanks & Disposing Off The Same Within A Distance Of 50 Metres On Ground, Washing With Fresh Water & Bleaching Powder (About 50 Gms Per 1000 Litres Of Water) & Finally Washing With Fresh Water As Directed Including Making Arrangements For Ladder, Buckets, Rope, Dewatering Of Tanks, Plugging The Outlets Of Tanks Before Cleaning Operation & Removal Of Plugs, Closing Of Manhole Covers, Opening Of Outlet Valves Of Tanks After Cleaning Etc. Complete All As Per Terms & Conditions & Scope Of Work Attached & As Directedby The Engineer-In-Charge. , Capacity Of Tanks Upto 3000 Litresnote: At Least 6 Tank Of Capacity Of Tanks Upto 3000 Litres To Be Clean In A Day. , Capacity Of Tanks Above 3000 Litres Upto 5000 Litresnote: At Least 1 Tank Above 10 Lakhs Litres To Be Clean In A Day. , Capacity Of Tanks Above 5000 Litres & Upto 10000 Litresnote: At Least 1 Tank Above 10 Lakhs Litres To Be Clean In A Day. , Capacity Of Tanks Above 10000 Litresnote: At Least 1 Tank Above 10 Lakhs Litres To Be Clean In A Day.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | CLEANING OF UNDERGROUND TANKS : Cleaning of Under Ground Water Storage / High Level Ground Reservoir (HLGR) tanks / Elevated Surface Reservoir (ESR) twice in a year or as required with pressure water jetting with required pressure using adjustable pressure jet machines, removing all debris, fungus growth inside the tanks & other contamination including cleaning of walls & floors of tanks thoroughly, application of bleaching powder or other chemicals approved by the department at the required dosage, desilting & final cleaning with fresh water & dewatering residual & dirty water & other deposits using dewatering pumps & vacuum pumps including disposing off the removed waste materials from the tanks within a distance of 50 metres on ground at suitable location etc. complete all as per terms and conditions/ scope of work attached & as directed by the Engineer-In-Charge | CLEANING OF UNDERGROUND TANKS : Cleaning of Under Ground Water Storage / High Level Ground Reservoir (HLGR) tanks / Elevated Surface Reservoir (ESR) twice in a year or as required with pressure water jetting with required pressure using adjustable pressure jet machines, removing all debris, fungus growth inside the tanks & other contamination including cleaning of walls & floors of tanks thoroughly, application of bleaching powder or other chemicals approved by the department at the required dosage, desilting & final cleaning with fresh water & dewatering residual & dirty water & other deposits using dewatering pumps & vacuum pumps including disposing off the removed waste materials from the tanks within a distance of 50 metres on ground at suitable location etc. complete all as per terms and conditions/ scope of work attached & as directed by the Engineer-In-Charge |
| 2 | Capacity of tanks up to 3 lakhs litres NOTE: At least 2 tanks upto 3 lakh liters to be clean in a day. | Capacity of tanks up to 3 lakhs litres NOTE: At least 2 tanks upto 3 lakh liters to be clean in a day. |
| 3 | Capacity of tanks above 3 lakhs litres to 5 lakhs litresNOTE: At least 2 tanks above 3 lakhs litres to 5 lakhs litres to be clean in a day. | Capacity of tanks above 3 lakhs litres to 5 lakhs litresNOTE: At least 2 tanks above 3 lakhs litres to 5 lakhs litres to be clean in a day. |
| 4 | Capacity of tanks above 5 lakhs litres to 10 lakhs litresNOTE: At least 1 tank above 5 lakhs litres to 10 lakhs litres to be clean in a day. | Capacity of tanks above 5 lakhs litres to 10 lakhs litresNOTE: At least 1 tank above 5 lakhs litres to 10 lakhs litres to be clean in a day. |
| 5 | CLEANING OF OVERHEAD TANKS : Cleaning of overhead water storage tanks of following capacities provided over the roof of buildings tanks twice in a year or as required, including scrapping of walls & floors of tanks with coir brushes, removing silt, scaling, dirt, debris & other deleterious materials from the tanks & disposing off the same within a distance of 50 metres on ground, washing with fresh water & bleaching powder (about 50 gms per 1000 litres of water) & finally washing with fresh water as directed including making arrangements for ladder, buckets, rope, dewatering of tanks, plugging the outlets of tanks before cleaning operation & removal of plugs, closing of manhole covers, opening of outlet valves of tanks after cleaning etc. complete all as per terms & conditions & scope of work attached & as directedby the Engineer-In-Charge. | CLEANING OF OVERHEAD TANKS : Cleaning of overhead water storage tanks of following capacities provided over the roof of buildings tanks twice in a year or as required, including scrapping of walls & floors of tanks with coir brushes, removing silt, scaling, dirt, debris & other deleterious materials from the tanks & disposing off the same within a distance of 50 metres on ground, washing with fresh water & bleaching powder (about 50 gms per 1000 litres of water) & finally washing with fresh water as directed including making arrangements for ladder, buckets, rope, dewatering of tanks, plugging the outlets of tanks before cleaning operation & removal of plugs, closing of manhole covers, opening of outlet valves of tanks after cleaning etc. complete all as per terms & conditions & scope of work attached & as directedby the Engineer-In-Charge. |
| 6 | Capacity of tanks upto 3000 litresNOTE: At least 6 tank of Capacity of tanks upto 3000 litres to be clean in a day. | Capacity of tanks upto 3000 litresNOTE: At least 6 tank of Capacity of tanks upto 3000 litres to be clean in a day. |
| 7 | Capacity of tanks above 3000 litres upto 5000 litresNOTE: At least 1 tank above 10 lakhs litres to be clean in a day. | Capacity of tanks above 3000 litres upto 5000 litresNOTE: At least 1 tank above 10 lakhs litres to be clean in a day. |
| 8 | Capacity of tanks above 5000 litres & upto 10000 litresNOTE: At least 1 tank above 10 lakhs litres to be clean in a day. | Capacity of tanks above 5000 litres & upto 10000 litresNOTE: At least 1 tank above 10 lakhs litres to be clean in a day. |
| 9 | Capacity of tanks above 10000 litresNOTE: At least 1 tank above 10 lakhs litres to be clean in a day. | Capacity of tanks above 10000 litresNOTE: At least 1 tank above 10 lakhs litres to be clean in a day. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender