Tender For Remodelling Of Main Burari Drainage Network Including Construction Of New Precasted Drain.
Tender Overview
Project Description
Tender for Remodelling Of Main Burari Drainage Network Including Construction Of New Precasted Drain.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Sep-2026 | Corrigendum No. 1 | Date | 18-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 2 | All kinds of soil |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. |
| 5 | All works up to plinth level: M-10 grade plain cement concrete (cement content considered @ 220 kg/cum). |
| 6 | Concrete of M25 grade with minimum cement content of 300 kg /cum |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 8 | Foundations, footings, bases of columns, etc. for mass concrete |
| 9 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 11 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 12 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland Cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. |
| 13 | (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately) Concrete of M50 grade with minimum cement content of 410 kg/cum |
| 14 | Constructing cast-in situ RCC diaphragm wall by providing and laying machine batched, machine mixed, self compacting, ready mix reinforced cement concrete, tramie controlled, of M 30 grade using minimum 400 kg cement per cum of concrete including providing and mixing required admixtures in recommended proportions as per IS : 9103, as approved by the Engineer-in-charge, for achieving 150- 200mm slump, for diaphragm wall having thickness as per approved structural design not exceeding 600 mm, in pannels of required depth and lengths as per approved drawing, including constructing necessary guide walls as required and as specified including boring in all kinds of soils and rocks, including working in or under water and / or liquid mud, in foul conditions and pumping or bailing out of water and removing slush, including disposal of earth/ rock / slush etc. for all leads and all lifts, including preparing, providing and re-circulating bentonite slurry in the trench as and when required for all depths, including agitating bentonite slurry during trenching etc., providing and fixing stop ends or form tubes, upto the required depth of diaphragm wall including extracting the same after casting, including chipping off the bentonite adulterated concrete or unsound concrete up to the cut off level for obtaining the sound concrete, dressing undulations on the exposed face of diaphragm wall after excavation by chipping / chiseling etc. including filling the depression/ cavities with sound concrete etc. complete and as directed by the Engineer-in-charge, including providing recess for bearing plates and fixing insert boxes for inclined rock anchors etc. complete as per the specifications and approved design and as directed by the Engineer-in-charge, but excluding the cost of reinforcement and inserts. |
| 15 | (rates include cost of all inputs of labour, material and T & P, cost of handling, lifting & placing in position the reinforcement cage in the trench, including the additional cost of welding the reinforcement bars etc. involved in the work and all other incidental expenditure for completing the work as directed by the Engineer-in-charge), However, the actual area of the diaphragm wall, correct to two places of decimal, from design bottom level to the design cut off level (including portion anchored in the rock upto the design bottom level) only shall be measured for payment. |
| 16 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 17 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. 12 mm cement plaster |
| 18 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) |
| 19 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 20 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 21 | Disposal of building rubbish/ malba / similar unserviceable, dismantled or waste materials or any type of malba generated during execution of work of this agreement like silts/sludge/ earth mix malba, C&ND waste etc all complete as per direction of Engineer-in-Charge by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-Charge, beyond 50 m initial lead, for all leads including all lifts involved. Note: Payment under this item shall be made only after production of authorized MCD receipts and charges paid to MCD shall be reimbursed to the contractor separately on production of receipt of payment MCD charges. The malba should be removed within 48 hrs of its generation from site to keep site clean & accident free. |
| 22 | Making bell mouth opening/ entrance of size 100x50x50 cm for drainage pipe under footpath, including providing cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) for shape of bell mouth, including plastering providing and fixing precast R.C.C./ S.F.R.C. slab including plastering with cement mortar 1:3 (1 cement : 3 fine sand) of 6 mm thickness on exposed surface of the slab & bell mouth including centring, shuttering & neat cement punning inside the bell mouth etc. all complete. |
| 23 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 24 | Providing and erecting 2.00 metre high temporary barricading at site; each panel of size 2.50 m x2.00 m made of 40x40x6 mm angle iron or 50x50x3 mm hollow MS tube posts/horizontal members/bracings covered with 1.63 mm thick MS sheet. The sheet shall be fixed with 30x5 mm MS flat by suitable welding/riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5 m. MS channel ISLC 75 @ 5.70 kg/m, 50 cm long shall be provided at the bottom having oval shaped holes of size 50x25 mm at both ends with 50 cm long MS angle 40x40x6 mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250 mm long expansion fasteners at both ends. The work shall be executed as per drawing/direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously including shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note :- One time payment shall be made for providing barricading from start of work till completion of work including shifting. The barricading provided shall remain to be the property of the contractor on completion of the work). |
| 25 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 26 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 27 | Modified Estimate Cost after correction on DSR items on a/c of [email protected] |
| 28 | Add of 4.03% Cost Index |
| 29 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 20 mm thick bed of cement mortar 1:4 (1cement : 4 coarse sand), compacting and proper embedding/laying of inter locking paver blocks including grouting the joints with white cement mixed with matching pigments etc. complete as per the direction of Engineer-in-Charge.60 mm thick cement concrete inter locking paver block of M-35 grade with approved colour, design & pattern. |
| 30 | Providing and laying tactile tile (for vision impaired persons as per standards)of size 300x300x60mm factory made cement concrete of M -35 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. 60mm thick Tactile paver block of M-30 grade with approved colour, design & pattern. |
| 31 | Providing & fixing Fabricated and manufactured solid RCC precast drain, drain cover, box culvert and other precast concrete element (Concrete grade M50) with provisions of shear keys, connecting loops, dowel tubes and proper lifting accessories for walls, beams, slabs, stairs, column, drain, drain cover etc. of various thickness, shape and size of different concrete grades manufactured in controlled factory environment with approved methodology including moulds (Pallet system, Tilts form, table moulds, battery moulds, vertical moulds, beam moulds, column moulds, staircase moulds, Facade mould, etc.), mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutouts/holes of required sizes for services, yard handling & stacking all complete as per IS 11447:1985 and as per approved shop drawings, IS Code and design mix as per the direction of Engineer-in-Charge.Providing Thermo-Mechanically Treated bars of grade Fe-500D or more in precast U shaped drain, drain cover and other precast concrete element as per approved shop drawing for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.The transportation of RCC precast drain, drain cover, box culvert and other precast concrete element upto any lead by flat bed Trailer (Double / Triple axle 40 ft. length) with proper accessories like A-frame etc. from factory, including the cost of loading, unloading & stacking at site with the help of required capacity cranes. |
| 32 | The Erection & Installation of RCC precast drain, drain cover, box culvert and other precast concrete element in correct & final position with proper line, level and plumb at site making all arrangements (i.e. cranes, push-pull jacks & all another T & P for lifting and placing & alignment of elements), within erection tolerance as per IS 15916, as per approved shop drawings and all complete as per the direction of Engineer-in-Charge including the cost of shim pads, non-shrink grout and steel works i.e. hangers. All work upto plinth level.RCC precast manufacturers shall have facilities of automated steam curing and automated reinforcement cage making along with product testing facility and NABL approved testing laboratory within plant premises.The precast drain shall be capable of carrying a wheel load of minimum 5.00 tonne for heavy vehicle movement. |
| 33 | Providing and placing in position 150 mm thick factory made machine batched& machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways in double reinforcement , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick ,150 mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage ,all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge. |
| 34 | Credit for old unserviceable steel bars received from demolishing of RCC work as per direction of Engineer-in Charge. |
| 35 | Credit of old demolished Kerb Stone etc. received after Demolishing at site all complete as per direction of Engineer-in-Charge. |
| 36 | Credit of old demolished paver block etc. Received after demolishing at site all complete as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender