Tender For For Construction Of 33/11 Kv S/S Chainpura With Associated 33 Kv And 11 Kv Lines, Distt. Karauli Under S/D Aen (Htm), Jpd, Karauli
Tender Value
7.54 Lakhs
Estimated cost
Bid Submission
22 Sep 2026
31 days left
EMD
15092
Bank guarantee accepted
Document Fee
2950
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Karauli → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for For Construction Of 33/11 Kv S/S Chainpura With Associated 33 Kv And 11 Kv Lines, Distt. Karauli Under S/D Aen (Htm), Jpd, Karauli
BOQ
| Sl. No. | Item Description |
| 1 | Part A 33 KV S/S Construction work |
| 2 | Excavation of pit in Hard soil |
| 3 | (A) Height of poles/R.S.Joist/M.S. Rail Size of pit |
| 4 | 9 Mtr/ 1.2mx0.6mx1.50 m deep |
| 5 | Earth work excavation and foundation of platfrom of transformers and brackers including dressing of sides and ramming of bottoms liftup to 1.5 meter including taking out the excavated soil and depositing and reffiling of jhiri watering and ramming and disposal of surplus excavated soil.as directed with in a lead of 50 meter. |
| 6 | Hard soil mixed with boulders |
| 7 | Providing and laying cement concrete including compaction etc, complete using stone aggregate 40 mm nominal size (hand broken ) in foundation plinth excluding the cost of shuttering using 1 cement:5 sand:10 aggregate mix. |
| 8 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish 25 mm thick. |
| 9 | The rates for complete worl including racing of joints cuting,protection,mixing and finishing T & P and scaffolding material and cost of material with all lead and lift. |
| 10 | The rates cover protaction at all place and things requiring protection and cleaing such places and thing of all droppings and splashes cost of nosing of steps etc complete. |
| 11 | Cement concrete flooring grade 1:2:4 (1-cement :2coarse sand :4-graded stone aggregate) rounding off edges etc. but excluding cost of nosing of staps etc. complete. |
| 12 | 25 mm thick with 12.5 mm thick nominal aggregate |
| 13 | Masonary for foundation and plinth |
| 14 | Random rubble stone masonary for foundation and plinth incement sand mortar 1:6(1 cement :6 sand) including labour charges. |
| 15 | Safe carriage of PCC poles including loading / un-loading |
| 16 | a) 9/10/11 Mtr. 400KG/11mtr Long PCC pole |
| 17 | Within 10 Kms. |
| 18 | Above 10 Kms. & upto 30 Kms. Add for each 05 Km.or partthereof. |
| 19 | c) 9/10/11 Mtr. 200KG Long PCC pole |
| 20 | Within 10 Kms. |
| 21 | Above 10 Kms. & upto 30 Kms. Add for each Km. or partthereof. |
| 22 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking inNigam store /at work site |
| 23 | Within 10 Kms. |
| 24 | Above 10 Kms. & upto 30 Kms. Add for each Km.or partthereof. |
| 25 | Safe carriage of Insulator, hardware, cable etc.includingloading/unloading and stacking in Nigam.stores etc. |
| 26 | Within 10 Kms. |
| 27 | Above 10 Kms. & upto 30 Kms. Add for each Km.or partthereof. |
| 28 | Safe carriage of 11/.4 KV 3 Phase distribution transformerincluding loading/unloading.from store to site |
| 29 | (B) Above 25 KVA & Upto 40 KVA |
| 30 | With in 10 KMs |
| 31 | Above 10 Kms. & upto 30 Kms. Add for each Km.or partthereof. |
| 32 | Safe Carriage of 33/11 KV Power Transformer |
| 33 | c) 5 MVA |
| 34 | Within 10 Kms |
| 35 | Above 10 Kms & upto 30 Kms . Add for each Km orpartthereof |
| 36 | Safe carriage of Breakes/Kiosk etc. includingLoading/Unloading & stacking in Nigam stores. |
| 37 | Within 10 Kms |
| 38 | Above 10 Kms & upto 30 Kms . Add for each Km or partthereof |
| 39 | Safe loading of power/ distribution transformer. |
| 40 | (A) 33/11 KV power transformer. |
| 41 | 5 MVA |
| 42 | Safe unloading of power/distribution transformers |
| 43 | a) 33/11 KV power transformer. |
| 44 | Above 3.15 MVA |
| 45 | Fixing of all type of fabricated material on erected supports with nut & bolts as per approved design & drawing of sub-station. |
| 46 | Fixing of 11kv B&S/T&C type disc insulator for 33kv lines(each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of hardware andstrips. |
| 47 | Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 2 nos.disc.& 1set of H/ W ) on terminalpoint including fixing of hardware and strips. |
| 48 | Fixing of 33kv pin insulator with pins. |
| 49 | Fixing of 11 KV pin insulator with pins. |
| 50 | Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made asper prevailing Discom store issue rates. |
| 51 | 33kv G.O.switch |
| 52 | 11kv G.O.switch |
| 53 | Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as perprevailing Discom store issue rates, |
| 54 | 33kv Horn Gap fuse set. |
| 55 | 11kv Horn Gap fuse set. |
| 56 | Installation of lightening arrestores on erected structure/ support (set of 3 nos.) including connection with earth by wire/strip as required and jumpering etc. The nuts & boits will be supplied by the contractor for which payment will be made as per prevailing DISCOM store issue. |
| 57 | 33 KV L.A. set |
| 58 | 11 KV L.A. set |
| 59 | Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as perprevailing Discom store issue rates, |
| 60 | 25 and 40 KVA |
| 61 | Fixing of danger plates on supports/structure |
| 62 | Fixing of PG clamp of Dog /Racoon Conductor |
| 63 | Drawing of overhead ABC conductor (Areal bunched cable) on exiting erected pole/support including laying,jointingstringing complete in all respect. |
| 64 | 3Cx25 + 25 Sq mm |
| 65 | Mesh earthing for 33/11 kv sub-station as per approved map &design usingMS flat 50X6mm/MS road 20mm dia includinglaying of flat/rod at the depth of 0.65 Mtrs.,welding & jointing at joints , structures & equipments etc.asunder: |
| 66 | Excavation of trench of 0.65Mtrs.depth and 0.5Mtr.width |
| 67 | (c) ordinary rock ( where bkasting is not required) |
| 68 | Laying of MS flat /MS rod in 0.65Mtr.deep excavated trench and welding of MS flat/rod continuosly with 100 mm overlaping for straight joint including coating of MS flat joints with molten bitumen and covering joint with bitumenimpregnated tape to protect from rust. |
| 69 | Shaping of MS flat for connecting the equipments with earthmesh .The work includes the welding of MS flat with equipments/structure and also with earth mesh.The work also includes coating of MS flat joint with molten bitumen and covering jointwith bitumen impregnated tape to protect fromrust. |
| 70 | Preparation of spikes made of M.S Rod of 20 mm dia and 3 Mtr.length as per design and requirment to be driven in earth by mechanical means and Providing & .fastening of suitable clampswith the M.S. Rod, connection of earth wire/staywire/MS flat inclamp depending on type of soil: |
| 71 | (A) Where drilling is not required |
| 72 | (B) Where drilling is required |
| 73 | Filling of trench with available excavated muck in layers of 20cm (Max.)consolidating each deposited layer by ramming &watering with lead up to 50 Mtr, and lift up to 1.5 Mtr. |
| 74 | Painting of exposed portion of MS flat/rod with two coats ofred-oxide primer and two coats of green enamel paint.including material. |
| 75 | Earthing of new 33/11KV S/S with bentonite compound ( including material ) involving following activities. |
| 76 | Digging of 10.5 ft deep pit of 4' dia (approx 132 cu.ft) |
| 77 | Supply of 2\\" G/I pipe with cap ( including fabrication of 30holes in the perophery of pipe ) |
| 78 | Making chamberfor water pouring including cast ironmanhole cover |
| 79 | Supply cost of 200kg bentonite compound with makingslurry |
| 80 | Supplyof back cotton soil approx 80 cu.ft |
| 81 | Connecting electrode with mesh earthing |
| 82 | Erection of PCC poles in excavated pit in alignment after checking the same with plumb line as per approved design & drawing of 33/11kv sub-station.The pit should be back filled with the soil with proper ramming below 30cm ground level and then muffed above 15cm average ground level with cement concrete ratio1:3:6.The charges for muffing will be paid extra as per chapter code no 5.7 The nuts & bolts will be supplied by the contractor for which payment will be made at the prevailing store issue rates. |
| 83 | PCC Poles 9 Mtr. Long |
| 84 | Laying / stringing of bus bar with ACSR Dog & jumper connection using tie rod ,33KV /11KV insulator strings,required hardware,P.G.clamps/T clamps etc.as per requirement including Y-connections at bus bar jumperingpoint as per the direction of engineer in-charge. |
| 85 | ACSR DOG/RABBIT |
| 86 | Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre- commissioning test before energization,filling oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom. |
| 87 | 33 KV VCB/SF-6 Breaker |
| 88 | 11 KV VCB (Outdoor ) |
| 89 | Installation of metering points on 11 KV Out going feeder at 33/11 KV S/S. |
| 90 | Safe loading of new/old 11 K.V. CT PT sets (all sizes) |
| 91 | Safe unloading of new/old 11 K.V. CT PT sets (all sizes) |
| 92 | Installation, tasting as per NIGAMS & commissioning of new 11 K.V. CT. PT set (all sizes) on erected supports including jumpering, crimping of lugs/ clamping earth connection of body & conducting pre commissioning test before energizationand satisfactory opration in all respect. |
| 93 | Transportions of 33KV or 11KV CT/PT/CTPT Set (All Size) |
| 94 | With in 10 KM |
| 95 | Above 10 KM & upto 30 KM Add of each KM or part there of |
| 96 | Part - B - For erection of 33 KV line for 33/11 KV S/S Chainpur Brririya |
| 97 | Conducting route survey as per approved Route map andpegging of route with tee off point section point & double pole locations. |
| 98 | Trimming of tree branches/plants and preparing routeapprochases for proposed line. |
| 99 | Excavation of pit in Hard soil |
| 100 | (A) Height of poles/R.S.Joist/M.S. Rail Size of pit |
| 101 | 9 Mtr/ 1.2mx0.6mx1.50 m deep |
| 102 | (B) 11.4/10.8 Mtr./1.5mX1.5mX1.80m deep |
| 103 | 12.8/12.6Mtr./ 1.5mX1.5mX2.10m deep |
| 104 | (C)Stay set/Depth of pit |
| 105 | 8'x 3/4\\" -0.75x0.5x1.6 m |
| 106 | Safe carriage of PCC poles including loading / un-loading |
| 107 | a) 9/10/11 Mtr. Long PCC pole |
| 108 | With in 10 KM |
| 109 | Above 10 KM & upto 30KM Add of each KM or part there of |
| 110 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking inNigam store /at work site |
| 111 | Within 10 Kms. |
| 112 | Above 10 Kms. & upto 30 Kms. Add for each Km.or partthereof. |
| 113 | Insulator, hardware, cable, breakers, kiosks, pannels etc.including loading/unloading and stacking in Nigam.storesetc. |
| 114 | Within 10 Kms. |
| 115 | Above 10 Kms. & upto 30 Kms. Add for each Km.or partthereof. |
| 116 | Safe carriage of fabricated lattice towers structures and sub- station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores/ at work site. |
| 117 | Within 10 Kms. |
| 118 | Above 10 Kms. & upto 30 Kms. Add for each Km.or partthereof. |
| 119 | Erection of all type of steel supports in the excavated pit inalignment after checking the same with plump line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement conconcrete of ratio 1:3:6 as per item no. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per NIGAM's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra. |
| 120 | Lattics structure |
| 121 | Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discomstore issue rates. |
| 122 | (B) IN RURAL AREA |
| 123 | PCC Poles 9 Mtr. Long (400kg) |
| 124 | Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discomstore issue rates. |
| 125 | PCC Poles 9/10 Mtr. Long |
| 126 | Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with propertension.Size of stay set/stay wire |
| 127 | 8\\"x3/4\\" with 7/8 SWG stay wire |
| 128 | Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base. |
| 129 | Fixing of all type of fabricated material on erected supportswith nut & bolts as per approved design & drawing of sub- station. |
| 130 | Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates, |
| 131 | 33 KV line |
| 132 | Fixing of 11kv B&S/T&C type disc insulator for 33kv lines(each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of hardware andstrips. |
| 133 | Fixing of 33kv pin insulator with pins. |
| 134 | Fixing of danger plates on supports/structure |
| 135 | Fixing of PG clamp of Dog /Racoon Conductor |
| 136 | Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate. |
| 137 | (B) IN RURAL AREA |
| 138 | ACSR DOG |
| 139 | Laying, jointing.stringing.tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc.including proper binding at each end.The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. |
| 140 | (B) IN RURAL AREA |
| 141 | G.I.Earth wire 6 SWG |
| 142 | Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC polesearthing must be connected with earthwire already available on PCC pole at bottom) |
| 143 | Part - C - For Erection of 11 KV Interconnection work Chainpur barr |
| 144 | Conducting route survey as per approved Route map and pegging of route with tee off point section point & double polelocations. |
| 145 | Trimming of tree branches/plants and preparing routeapprochases for proposed line. |
| 146 | (A) Height of poles/R.S.Joist/M.S. Rail Size of pit |
| 147 | (A) Height of poles/R.S.Joist/M.S. Rail Size of pit |
| 148 | 9 Mtr/ 1.2mx0.6mx1.50 m deep |
| 149 | (B) Lattice Tower /Size of pit |
| 150 | 11.4/10.8Mtr./1.5mX1.5mX1.80m deep |
| 151 | (C)Stay set/Depth of pit |
| 152 | 86x 3/4\\" -0.75x0.5x1.6 m |
| 153 | Safe carriage of PCC poles including loading / un-loading |
| 154 | (c) 9/10/11 mtr.200 KG long PCC poles |
| 155 | Within 10 kms |
| 156 | Above 10 Kms. & upto 30 Kms. Add for each Km.or partthereof. |
| 157 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking inNigam store /at work site |
| 158 | Within 10 Kms. |
| 159 | Above 10 Kms. & upto 30 Kms. Add for each Km.or partthereof. |
| 160 | Insulator, hardware, cable, breakers, kiosks, pannelsetc.including loading/unloading and stacking in Nigam.stores etc. |
| 161 | Within 10 Kms. |
| 162 | Above 10 Kms. & upto 30 Kms. Add for each Km.or partthereof. |
| 163 | Safe carriage of fabricated lattice towers structures and sub- station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores/ at work site. |
| 164 | Within 10 Kms. |
| 165 | Above 10 K.M.and Upto 30 K.M.Add for each K.M. or part thereof |
| 166 | Erection of all type of steel supports in the excavated pit inalignment after checking the same with plump line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement conconcrete of ratio 1:3:6 as per item no. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per NIGAM's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra. |
| 167 | Lattics structure |
| 168 | Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discomstore issue rates. |
| 169 | (B) IN RURAL AREA |
| 170 | PCC Pole 9 Mtr.long (200kg) |
| 171 | Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discomstore issue rates. |
| 172 | PCC Poles 9 Mtr. Long (200 Kg) |
| 173 | Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with propertension.Size of stay set/stay wire |
| 174 | 6\\"x5/8\\" with 7/10 SWG stay wire |
| 175 | Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base. |
| 176 | Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates, |
| 177 | 11 KV line |
| 178 | Fixing of 11 KV B&S/T&C type disc insulator for 11 K.V. Lines(each unit consiting of 1 nos.disc & 1 set of H/W) onterminal point including fixing of hardware and strips. |
| 179 | Fixing of 11 K.V. pin insulator with pins. |
| 180 | Fixing of danger plates on supports/structure |
| 181 | PG clamp for rabbit conductor |
| 182 | Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate. |
| 183 | (B) IN RURAL AREA |
| 184 | ACSR RABBIT |
| 185 | Laying, jointing.stringing.tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc.including proper binding at each end.The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. |
| 186 | (B) IN RURAL AREA |
| 187 | G.I.Earth wire 8 SWG |
| 188 | Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod 20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 22, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 31 daysSep 23, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 32 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender